{"id":76705,"date":"2018-07-26T14:00:16","date_gmt":"2018-07-26T11:00:16","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=76705"},"modified":"2018-07-26T14:00:16","modified_gmt":"2018-07-26T11:00:16","slug":"akkuyu-ngsde-ikinci-reaktor-icin-insaat-izni-hazirliklari-tamamlandi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/akkuyu-ngsde-ikinci-reaktor-icin-insaat-izni-hazirliklari-tamamlandi\/","title":{"rendered":"(Turkish) Akkuyu NGS\u2019de \u0130kinci Reakt\u00f6r \u0130\u00e7in \u0130n\u015faat \u0130zni Haz\u0131rl\u0131klar\u0131 Tamamland\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/76705\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>3 Nisan\u2019da temeli at\u0131lan ve T\u00fcrkiye\u2019nin ilk N\u00fckleer G\u00fc\u00e7 Santrali olacak Akkuyu\u2019nun ikinci reakt\u00f6r in\u015faat\u0131 \u00e7al\u0131\u015fmalar\u0131 i\u00e7in izin haz\u0131rl\u0131klar\u0131 tamamland\u0131.<img loading=\"lazy\" class=\"alignright size-medium wp-image-76707\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/07\/akkuyu-ngsde-ikinci-reaktor-icin-insaat-izni-hazirliklari-tamamlandi-300x169.jpg\" alt=\"\" width=\"300\" height=\"169\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/07\/akkuyu-ngsde-ikinci-reaktor-icin-insaat-izni-hazirliklari-tamamlandi-300x169.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/07\/akkuyu-ngsde-ikinci-reaktor-icin-insaat-izni-hazirliklari-tamamlandi-500x281.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/07\/akkuyu-ngsde-ikinci-reaktor-icin-insaat-izni-hazirliklari-tamamlandi-80x45.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/07\/akkuyu-ngsde-ikinci-reaktor-icin-insaat-izni-hazirliklari-tamamlandi.jpg 670w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/strong><\/p>\n<p><span id=\"more-101139\"><\/span>Akkuyu N\u00fckleer A.\u015e., T\u00fcrkiye Atom Enerjisi Kurumu\u2019na (TAEK) ba\u015fvuruda bulunarak bin 200 megavatl\u0131k ikinci reakt\u00f6r i\u00e7in in\u015faat iznini bu hafta alacak. Yakla\u015f\u0131k 20 milyar dolarl\u0131k yat\u0131r\u0131m\u0131n \u00f6ng\u00f6r\u00fcld\u00fc\u011f\u00fc Akkuyu NGS kapsam\u0131nda ilk in\u015faat izni s\u00fcreci yakla\u015f\u0131k 3 y\u0131l s\u00fcrm\u00fc\u015ft\u00fc. N\u00fckleer tesislere lisans verilmesine ili\u015fkin mevzuata g\u00f6re belirlenen genel ve \u00f6zel ko\u015fullar yerine getirilerek Akkuyu santralinin birinci \u00fcnitesi in\u015fas\u0131 i\u00e7in TAEK taraf\u0131ndan in\u015faat lisans\u0131 verilmi\u015fti.<\/p>\n<p>\u015eimdi yine ayn\u0131 prosed\u00fcrler i\u015fleyecek ancak bu kez daha \u00f6nce belli a\u015famalar g\u00f6r\u00fc\u015f\u00fcld\u00fc\u011f\u00fc i\u00e7in s\u00fcre\u00e7 daha h\u0131zl\u0131 ilerleyerek k\u0131sa s\u00fcrede sonuca ba\u011flanacak. Bu \u015fekilde di\u011fer iki reakt\u00f6r i\u00e7in de ayr\u0131 ayr\u0131 in\u015faat izni lisanslar\u0131 sonradan al\u0131nacak. 2023\u2019te ilk reakt\u00f6r\u00fcn devreye al\u0131nmas\u0131ndan sonra her y\u0131l bir reakt\u00f6r devreye al\u0131nmas\u0131 planlan\u0131yor.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.3 Nisan\u2019da temeli at\u0131lan ve T\u00fcrkiye\u2019nin ilk N\u00fckleer G\u00fc\u00e7 Santrali olacak Akkuyu\u2019nun ikinci reakt\u00f6r in\u015faat\u0131 \u00e7al\u0131\u015fmalar\u0131 i\u00e7in izin haz\u0131rl\u0131klar\u0131 tamamland\u0131. Akkuyu N\u00fckleer A.\u015e., [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":76707,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,43],"tags":[3019,67,1009,1133,21,23134,25480,34930,2644],"views":884,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/76705"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=76705"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/76705\/revisions"}],"predecessor-version":[{"id":76708,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/76705\/revisions\/76708"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/76707"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=76705"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=76705"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=76705"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}