{"id":76675,"date":"2018-07-25T12:34:00","date_gmt":"2018-07-25T09:34:00","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=76675"},"modified":"2018-07-25T12:34:00","modified_gmt":"2018-07-25T09:34:00","slug":"sanko-enerji-manisada-jeotermal-kaynak-aramasi-yapacak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/sanko-enerji-manisada-jeotermal-kaynak-aramasi-yapacak\/","title":{"rendered":"(Turkish) Sanko Enerji, Manisa\u2019da Jeotermal Kaynak Aramas\u0131 Yapacak"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/76675\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Manisa\u2019n\u0131n Salihli il\u00e7esinde 50 MW kapasiteli Jeotermal Enerji \u00dcretim Santrali kurulumu ger\u00e7ekle\u015ftiren SANKO Enerji Yat\u0131r\u0131mlar\u0131 Sanayi Anonim \u015eirketi taraf\u0131ndan Salihli Belediye Ba\u015fkanl\u0131\u011f\u0131\u2019na ait Salihli \u0130l\u00e7esi s\u0131n\u0131rlar\u0131 i\u00e7erisindeki 178 no\u2019lu Jeotermal Kaynak \u0130\u015fletme Ruhsatl\u0131 sahan\u0131n kullan\u0131m hakk\u0131 30 y\u0131l s\u00fcre ile sat\u0131n al\u0131nd\u0131. \u015eirket bu saha i\u00e7erisinde Jeotermal Derin Arama Sondaj\u0131 \u00c7al\u0131\u015fmas\u0131 ger\u00e7ekle\u015ftirecek.<\/strong><\/p>\n<p><img loading=\"lazy\" class=\"alignleft size-medium wp-image-76676\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/07\/sanko-enerji-manisada-jeotermal-kaynak-aramasi-yapacak-300x168.jpeg\" alt=\"\" width=\"300\" height=\"168\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/07\/sanko-enerji-manisada-jeotermal-kaynak-aramasi-yapacak-300x168.jpeg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/07\/sanko-enerji-manisada-jeotermal-kaynak-aramasi-yapacak-500x281.jpeg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/07\/sanko-enerji-manisada-jeotermal-kaynak-aramasi-yapacak-80x45.jpeg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/07\/sanko-enerji-manisada-jeotermal-kaynak-aramasi-yapacak.jpeg 606w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>Planlanan proje kapsam\u0131nda sondaj y\u00f6ntemlerinden Rotary (d\u00f6ner) Sondaj y\u00f6ntemi kullan\u0131larak ger\u00e7ekle\u015ftirilecek sondaj \u00e7al\u0131\u015fmalar\u0131 esnas\u0131nda 2.500 (\u00b1250) metre derinli\u011fe kadar sondaj yap\u0131lmas\u0131 \u00f6ng\u00f6r\u00fclmektedir.<\/p>\n<p>Projeyle arazide 5 m\u00fchendis, 3 teknisyen ve 40 i\u015f\u00e7i olmak \u00fczere toplam 48 ki\u015fi istihdam edilecek. Ger\u00e7ekle\u015ftirilmesi planlanan proje bedeli her bir kuyu i\u00e7in toplam 1 milyon lira olarak hesaplanm\u0131\u015ft\u0131r.<\/p>\n<p>&nbsp;<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Manisa\u2019n\u0131n Salihli il\u00e7esinde 50 MW kapasiteli Jeotermal Enerji \u00dcretim Santrali kurulumu ger\u00e7ekle\u015ftiren SANKO Enerji Yat\u0131r\u0131mlar\u0131 Sanayi Anonim \u015eirketi taraf\u0131ndan Salihli Belediye Ba\u015fkanl\u0131\u011f\u0131\u2019na ait [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":76676,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,48],"tags":[67,1009,38497,35040,23226,34985,38498,25055],"views":1512,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/76675"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=76675"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/76675\/revisions"}],"predecessor-version":[{"id":76677,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/76675\/revisions\/76677"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/76676"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=76675"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=76675"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=76675"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}