{"id":76556,"date":"2018-07-23T10:29:49","date_gmt":"2018-07-23T07:29:49","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=76556"},"modified":"2018-07-23T10:29:49","modified_gmt":"2018-07-23T07:29:49","slug":"tarsus-gesten-767-bin-lira-kazanc-sagladi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/tarsus-gesten-767-bin-lira-kazanc-sagladi\/","title":{"rendered":"(Turkish) Tarsus GES\u2019ten 76,7 Bin Lira Kazan\u00e7 Sa\u011flad\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/76556\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Tarsus Belediyesi taraf\u0131ndan yap\u0131lan G\u00fcne\u015f Enerjisi Santrali (GES) Projesi ile kapal\u0131 pazar yerlerinin \u00e7at\u0131lar\u0131na kurulan g\u00fcne\u015f panellerinden \u00fcretilen elektrikten 76 bin 797 lira kazan\u00e7 sa\u011fland\u0131.<img loading=\"lazy\" class=\"alignright size-medium wp-image-76557\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/07\/tarsus-gesten-767-bin-lira-kazanc-sagladi-300x169.jpg\" alt=\"\" width=\"300\" height=\"169\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/07\/tarsus-gesten-767-bin-lira-kazanc-sagladi-300x169.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/07\/tarsus-gesten-767-bin-lira-kazanc-sagladi-500x281.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/07\/tarsus-gesten-767-bin-lira-kazanc-sagladi-80x45.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/07\/tarsus-gesten-767-bin-lira-kazanc-sagladi.jpg 590w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/strong><\/p>\n<p>Ge\u00e7ti\u011fimiz y\u0131l 3,5 megavat\u2019l\u0131k lisans\u0131 alarak g\u00fcne\u015f panelleri ihalesini ger\u00e7ekle\u015ftirdiklerini belirten Belediye Ba\u015fkan\u0131 \u015eevket Can yapt\u0131\u011f\u0131 a\u00e7\u0131klamada;<\/p>\n<p>&#8220;Mevcut pazar yerleri \u00e7at\u0131lar\u0131na bu g\u00fcne\u015f panellerini koyarak \u015fubat ay\u0131ndan itibaren elektrik \u00fcretimi sa\u011fl\u0131yoruz. \u00c7at\u0131lardan \u00fcretilen elektri\u011fi T\u00fcrkiye Elektrik Da\u011f\u0131t\u0131m A.\u015e\u2019ye satt\u0131k. K\u0131rklars\u0131rt\u0131 ve Yeni Mahalle kapal\u0131 pazar yerlerindeki \u00e7at\u0131lara kurulan kurulan G\u00fcne\u015f Enerji Santrali\u2019nde (GES) may\u0131s ay\u0131nda \u00fcretilen elektrikle 76 bin 797 lira gelir sa\u011flad\u0131.\u201d dedi.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Tarsus Belediyesi taraf\u0131ndan yap\u0131lan G\u00fcne\u015f Enerjisi Santrali (GES) Projesi ile kapal\u0131 pazar yerlerinin \u00e7at\u0131lar\u0131na kurulan g\u00fcne\u015f panellerinden \u00fcretilen elektrikten 76 bin 797 lira [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":76557,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49],"tags":[67,1009,2326,23416,2569,1876,23133,23131,26335],"views":904,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/76556"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=76556"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/76556\/revisions"}],"predecessor-version":[{"id":76558,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/76556\/revisions\/76558"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/76557"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=76556"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=76556"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=76556"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}