{"id":76067,"date":"2018-07-10T10:57:26","date_gmt":"2018-07-10T07:57:26","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=76067"},"modified":"2018-07-10T10:57:26","modified_gmt":"2018-07-10T07:57:26","slug":"bereket-enerjinin-borc-yapilandirma-gorusmeleri-suruyor","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/bereket-enerjinin-borc-yapilandirma-gorusmeleri-suruyor\/","title":{"rendered":"(Turkish) Bereket Enerji&#8217;nin Bor\u00e7 Yap\u0131land\u0131rma G\u00f6r\u00fc\u015fmeleri S\u00fcr\u00fcyor"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/76067\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Bereket Enerji Grubu bilgi veren 7 kayna\u011fa g\u00f6re bankalarla yakla\u015f\u0131k 4 milyar dolarl\u0131k borcunu yap\u0131land\u0131rmak i\u00e7in g\u00f6r\u00fc\u015f\u00fcrken, di\u011fer yandan bor\u00e7lar\u0131n\u0131 azaltmak i\u00e7in varl\u0131k sat\u0131\u015f\u0131na gitmeyi planlamaktad\u0131r.<\/strong><\/p>\n<p>Denizli merkezli Bereket Enerji, kaynaklar\u0131n verdi\u011fi bilgiye g\u00f6re Seyhan nehri \u00fczerinde toplamda 275 megawatt kapasiteye sahip G\u00f6kta\u015f I ve G\u00f6kta\u015f II hidroelektrik santrallerinin sat\u0131\u015f\u0131 i\u00e7in Yap\u0131 Kredi <img loading=\"lazy\" class=\"alignright size-medium wp-image-28494\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/06\/bereket-enerji--300x122.jpg\" alt=\"\" width=\"300\" height=\"122\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/06\/bereket-enerji--300x122.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/06\/bereket-enerji--500x204.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/06\/bereket-enerji--80x32.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/06\/bereket-enerji-.jpg 781w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>Yat\u0131r\u0131m\u2019a yetki verdi. Kaynaklar, bir\u00e7ok yerli yat\u0131r\u0131mc\u0131n\u0131n santrallerle ilgilendi\u011fini de dile getirdi. \u0130ki kaynak, Bereket\u2019in sat\u0131\u015ftan en az 400 milyon dolar gelir elde etmeyi planland\u0131\u011f\u0131n\u0131 da a\u00e7\u0131klad\u0131.<\/p>\n<p>Grubun k\u00f6m\u00fcr ve yenilenebilir enerji de dahil olmak \u00fczere toplam 2.100 megawatt kurulu g\u00fcc\u00fc bulunmaktad\u0131r. Liradaki de\u011fer kayb\u0131 kredi geri \u00f6demelerini zorla\u015ft\u0131r\u0131rken, Bereket 4 milyar dolar civar\u0131ndaki borcunu yap\u0131land\u0131rmak i\u00e7in bankalarla g\u00f6r\u00fc\u015fmelerini s\u00fcrd\u00fcrmektedir. Bankalar, liradaki de\u011fer kayb\u0131 ve artan bor\u00e7lanma maliyetleri nedeniyle aralar\u0131nda enerji firmalar\u0131n\u0131n da oldu\u011fu bir\u00e7ok \u015firketten gelen yap\u0131land\u0131rma talepleriyle kar\u015f\u0131 kar\u015f\u0131ya. Yap\u0131land\u0131rma talebinde bulunanlar aras\u0131nda Y\u0131ld\u0131z Holding ve Do\u011fu\u015f Grubu da bulunuyor.<\/p>\n<p>Kaynaklardan derlenen verilere g\u00f6re Bereket\u2019in bu giri\u015fimi \u015fu ana kadar yap\u0131lm\u0131\u015f en b\u00fcy\u00fck \u00fc\u00e7\u00fcnc\u00fc yap\u0131land\u0131rma talebi olmu\u015ftur. T\u00fcrkiye\u2019de finans d\u0131\u015f\u0131 kesimin yabanc\u0131 para bor\u00e7lar\u0131n\u0131n milli gelire oran\u0131 y\u00fczde 40 seviyesindedir.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Bereket Enerji Grubu bilgi veren 7 kayna\u011fa g\u00f6re bankalarla yakla\u015f\u0131k 4 milyar dolarl\u0131k borcunu yap\u0131land\u0131rmak i\u00e7in g\u00f6r\u00fc\u015f\u00fcrken, di\u011fer yandan bor\u00e7lar\u0131n\u0131 azaltmak i\u00e7in varl\u0131k [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":28494,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49,24649],"tags":[4720,18622,63,1163,67,1009,117,1675,105],"views":1281,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/76067"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=76067"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/76067\/revisions"}],"predecessor-version":[{"id":76068,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/76067\/revisions\/76068"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/28494"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=76067"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=76067"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=76067"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}