{"id":75997,"date":"2018-07-08T22:01:39","date_gmt":"2018-07-08T19:01:39","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=75997"},"modified":"2018-07-08T22:01:39","modified_gmt":"2018-07-08T19:01:39","slug":"nukleer-enerjiden-vazgecmis-olan-isvecde-enerji-acigi-buyudu","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/nukleer-enerjiden-vazgecmis-olan-isvecde-enerji-acigi-buyudu\/","title":{"rendered":"(Turkish) N\u00fckleer Enerjiden Vazge\u00e7mi\u015f Olan \u0130sve\u00e7\u2019de Enerji A\u00e7\u0131\u011f\u0131 B\u00fcy\u00fcd\u00fc"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/75997\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Avrupa\u2019ya enerji ihra\u00e7 eden \u0130sve\u00e7\u2019in n\u00fckleer \u00fcretimden ayr\u0131l\u0131p r\u00fczgar enerjisine ge\u00e7i\u015fiyle k\u0131\u015f aylar\u0131nda enerji a\u00e7\u0131\u011f\u0131n\u0131n kar\u015f\u0131la\u015faca\u011f\u0131 belirtildi.<img loading=\"lazy\" class=\"alignright size-medium wp-image-75998\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/07\/nukleer-enerjiden-vazgecmis-olan-isvecde-enerji-acigi-buyudu-300x177.jpg\" alt=\"\" width=\"300\" height=\"177\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/07\/nukleer-enerjiden-vazgecmis-olan-isvecde-enerji-acigi-buyudu-300x177.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/07\/nukleer-enerjiden-vazgecmis-olan-isvecde-enerji-acigi-buyudu-500x294.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/07\/nukleer-enerjiden-vazgecmis-olan-isvecde-enerji-acigi-buyudu-80x47.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/07\/nukleer-enerjiden-vazgecmis-olan-isvecde-enerji-acigi-buyudu.jpg 678w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/strong><span id=\"more-100775\"><\/span><\/p>\n<p>Oskarshamn 1 reakt\u00f6r\u00fcn\u00fc ge\u00e7en y\u0131l kapatan \u0130sve\u00e7, bundan sonra ya\u015fad\u0131\u011f\u0131 ilk k\u0131\u015f mevsiminde pik t\u00fcketimin 800 megawatt (MW) art\u0131\u015f\u0131yla kar\u015f\u0131la\u015fm\u0131\u015f ve yedek enerji tesislerini devreye sokma haz\u0131rl\u0131\u011f\u0131 yapm\u0131\u015ft\u0131.<\/p>\n<p>Kamu enerji da\u011f\u0131t\u0131m kurumu Svenska Kraftnat (SVK) ise a\u00e7\u0131klad\u0131\u011f\u0131 raporda, gelecek k\u0131\u015ftan itibaren \u00fclkenin enerji dengesinin daha da bozulaca\u011f\u0131n\u0131 ve 2020 y\u0131l\u0131na kadar iki reakt\u00f6r\u00fcn daha kapanmas\u0131yla ithalata gitmenin zorunlu olaca\u011f\u0131n\u0131 belirtmi\u015fti.<\/p>\n<p>\u0130sve\u00e7\u2019in halen \u00e7al\u0131\u015fan sekiz n\u00fckleer reakt\u00f6r\u00fcnden ikisi yak\u0131n tarihlerde kapanacak. Ringhals 2 gelecek y\u0131l, Ringhals 1 de bundan bir y\u0131l sonra faaliyetini durduracak. B\u00f6ylece, y\u00fczde 40 oran\u0131nda n\u00fckleer \u00fcretime muhta\u00e7 olan ulusal enerji sisteminde toplam 1,700 MW enerji azalm\u0131\u015f olacak.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Avrupa\u2019ya enerji ihra\u00e7 eden \u0130sve\u00e7\u2019in n\u00fckleer \u00fcretimden ayr\u0131l\u0131p r\u00fczgar enerjisine ge\u00e7i\u015fiyle k\u0131\u015f aylar\u0131nda enerji a\u00e7\u0131\u011f\u0131n\u0131n kar\u015f\u0131la\u015faca\u011f\u0131 belirtildi. Oskarshamn 1 reakt\u00f6r\u00fcn\u00fc ge\u00e7en y\u0131l kapatan [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":75998,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,43,50],"tags":[67,1009,5390,21,3020,38229,474,24949,23318,34960,38230,38231],"views":769,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/75997"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=75997"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/75997\/revisions"}],"predecessor-version":[{"id":75999,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/75997\/revisions\/75999"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/75998"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=75997"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=75997"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=75997"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}