{"id":75876,"date":"2018-07-05T21:10:10","date_gmt":"2018-07-05T18:10:10","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=75876"},"modified":"2018-07-05T21:10:10","modified_gmt":"2018-07-05T18:10:10","slug":"limak-holdingin-3-enerji-santrali-daha-devreye-alinacak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/limak-holdingin-3-enerji-santrali-daha-devreye-alinacak\/","title":{"rendered":"(Turkish) Limak Holding&#8217;in 3 Enerji Santrali Daha Devreye Al\u0131nacak"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/75876\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Limak Holding Y\u00f6netim Kurulu Ba\u015fkan\u0131 Nihat \u00d6zdemir taraf\u0131ndan iki y\u0131l i\u00e7inde 600 MW\u2019ye yak\u0131n kurulu g\u00fc\u00e7teki iki hidroelektrik santralinin daha devreye al\u0131naca\u011f\u0131n\u0131n ama\u00e7land\u0131\u011f\u0131 ayr\u0131ca bu y\u0131l sonunda 15 MW\u2019lik jeotermal santralin faaliyete ge\u00e7ece\u011fi ifade edildi.<span id=\"more-100788\"><img loading=\"lazy\" class=\"alignright size-medium wp-image-75877\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/07\/limak-holdingin-3-enerji-santrali-daha-devreye-alinacak-300x161.png\" alt=\"\" width=\"300\" height=\"161\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/07\/limak-holdingin-3-enerji-santrali-daha-devreye-alinacak-300x161.png 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/07\/limak-holdingin-3-enerji-santrali-daha-devreye-alinacak-500x268.png 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/07\/limak-holdingin-3-enerji-santrali-daha-devreye-alinacak-80x43.png 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/07\/limak-holdingin-3-enerji-santrali-daha-devreye-alinacak.png 600w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/span><\/strong><\/p>\n<p>\u00d6ZDEM\u0130R, Limak\u2019\u0131n turizm yat\u0131r\u0131mlar\u0131yla ilgili toplant\u0131s\u0131n\u0131n ard\u0131ndan Reuters\u2019a yapt\u0131\u011f\u0131 a\u00e7\u0131klamada, \u015firketin Norve\u00e7li Statkraft\u2019tan alm\u0131\u015f oldu\u011fu yakla\u015f\u0131k 500 MW kurulu g\u00fc\u00e7teki Siirt \u00c7etin HES hakk\u0131nda, \u201c2019 y\u0131l\u0131nda devreye girecek. \u00c7ok h\u0131zl\u0131 gidiyor\u201d dedi.<\/p>\n<p>\u00d6zdemir ayr\u0131ca, 74 MW kurulu g\u00fc\u00e7teki G\u00fcrs\u00f6\u011f\u00fct HES\u2019in ve 15 MW g\u00fc\u00e7teki Buharkent jeotermal santralinin de bu y\u0131l devreye girmesinin planland\u0131\u011f\u0131n\u0131 da belirtti.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Limak Holding Y\u00f6netim Kurulu Ba\u015fkan\u0131 Nihat \u00d6zdemir taraf\u0131ndan iki y\u0131l i\u00e7inde 600 MW\u2019ye yak\u0131n kurulu g\u00fc\u00e7teki iki hidroelektrik santralinin daha devreye al\u0131naca\u011f\u0131n\u0131n ama\u00e7land\u0131\u011f\u0131 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":75877,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,47,48],"tags":[67,1009,2838,117,34926,26043,26044,16077,6748,1457],"views":1124,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/75876"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=75876"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/75876\/revisions"}],"predecessor-version":[{"id":75878,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/75876\/revisions\/75878"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/75877"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=75876"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=75876"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=75876"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}