{"id":75772,"date":"2018-07-01T18:43:09","date_gmt":"2018-07-01T15:43:09","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=75772"},"modified":"2018-07-01T18:44:17","modified_gmt":"2018-07-01T15:44:17","slug":"yozgattan-uranyum-uretimi-hazirligi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/yozgattan-uranyum-uretimi-hazirligi\/","title":{"rendered":"(Turkish) Yozgat&#8217;tan Uranyum \u00dcretimi Haz\u0131rl\u0131\u011f\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/75772\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>T\u00fcrkiye, 3 Nisan 2018&#8217;de Akkuyu N\u00fckleer Santraliyle y\u00fcksek potansiyeli enerji sahas\u0131na giri\u015f yapt\u0131. Rusya ile ortakla\u015fa s\u00fcrd\u00fcr\u00fclen faaliyetler sonucunda ba\u015flat\u0131lan T\u00fcrkiye\u2019nin n\u00fckleer \u00e7a\u011f\u0131 t\u00fcm h\u0131z\u0131yla s\u00fcrmektedir. T\u00fcrkiye\u2019nin \u00f6nemli miktarda uranyum bar\u0131nd\u0131ran topraklar\u0131nda yerli \u00fcretime ge\u00e7ilecek.<img loading=\"lazy\" class=\"alignright size-medium wp-image-75773\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/07\/yozgattan-uranyum-uretimi-hazirligi-300x225.jpg\" alt=\"\" width=\"300\" height=\"225\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/07\/yozgattan-uranyum-uretimi-hazirligi-300x225.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/07\/yozgattan-uranyum-uretimi-hazirligi-768x576.jpg 768w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/07\/yozgattan-uranyum-uretimi-hazirligi-500x375.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/07\/yozgattan-uranyum-uretimi-hazirligi-67x50.jpg 67w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/07\/yozgattan-uranyum-uretimi-hazirligi.jpg 1000w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/strong><\/p>\n<p>Ge\u00e7ti\u011fimiz y\u0131llar i\u00e7inde ABD\u2019liler taraf\u0131ndan bulunan ve Eti Maden taraf\u0131ndan ABD\u2019li bir firmaya lisanslanan uranyum b\u00f6lgesinde art\u0131k T\u00fcrkiye kendi faaliyetlerini y\u00fcr\u00fctecek. T\u00fcrkiye, ABD\u2019li firmalar\u0131n sekiz on y\u0131ld\u0131r elinde tuttu\u011fu ve \u00fcretim yap\u0131lmamas\u0131 i\u00e7in yo\u011fun \u00e7aba sarf etti\u011fi Yozgat\u2019taki uranyum madenlerinin ruhsat\u0131n\u0131 iptal etti.<\/p>\n<p>Yerli ve Millile\u015fme projesinin \u00f6nemli bir aya\u011f\u0131n\u0131 kapsayan enerji sekt\u00f6r\u00fcnden gelen bu at\u0131l\u0131m, n\u00fckleer enerji alan\u0131nda umut \u0131\u015f\u0131\u011f\u0131 vermi\u015f oldu. ABD\u2019li firmalar\u0131n elinde bulunan, Yozgat\u2019\u0131n merkez, \u015eefaatli ve Sorgun il\u00e7elerinde 15 bin 708 hektar (157 km2) alan\u0131 kapsayan 8 stratejik uranyum maden sahas\u0131n\u0131 kapsayan ruhsatlar, Enerji Bakanl\u0131\u011f\u0131 Maden \u0130\u015fleri Genel M\u00fcd\u00fcrl\u00fc\u011f\u00fc (M\u0130GEM) taraf\u0131ndan iptal edildi. Sahalar\u0131n ET\u0130 Maden\u2019e devredilip arama tarama ve \u00e7\u0131kartma faaliyetlerinin y\u00fcr\u00fct\u00fclmesi \u00f6ng\u00f6r\u00fclmektedir.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.T\u00fcrkiye, 3 Nisan 2018&#8217;de Akkuyu N\u00fckleer Santraliyle y\u00fcksek potansiyeli enerji sahas\u0131na giri\u015f yapt\u0131. Rusya ile ortakla\u015fa s\u00fcrd\u00fcr\u00fclen faaliyetler sonucunda ba\u015flat\u0131lan T\u00fcrkiye\u2019nin n\u00fckleer \u00e7a\u011f\u0131 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":75773,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,43],"tags":[67,1009,5551,21,23134,25480,34930,12635,38158],"views":2389,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/75772"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=75772"}],"version-history":[{"count":2,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/75772\/revisions"}],"predecessor-version":[{"id":75775,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/75772\/revisions\/75775"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/75773"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=75772"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=75772"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=75772"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}