{"id":75465,"date":"2018-06-22T13:39:56","date_gmt":"2018-06-22T10:39:56","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=75465"},"modified":"2018-06-22T13:39:56","modified_gmt":"2018-06-22T10:39:56","slug":"bingoldaki-copten-enerji-uretimi-yil-sonunda-basliyor","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/bingoldaki-copten-enerji-uretimi-yil-sonunda-basliyor\/","title":{"rendered":"(Turkish) Bing\u00f6l\u2019daki \u00c7\u00f6pten Enerji \u00dcretimi Y\u0131l Sonunda Ba\u015fl\u0131yor!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/75465\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Bing\u00f6l Belediye Ba\u015fkan\u0131 Y\u00fccel Barakazi, kat\u0131 at\u0131k d\u00fczenli depolama sahas\u0131nda entegre tesis, saha i\u015fletmesi, \u00f6n ayr\u0131\u015ft\u0131rma, \u00e7\u00f6pten enerji \u00fcretimi ve fermantasyon tesisi kurulmas\u0131 \u00e7al\u0131\u015fmalar\u0131n\u0131n devam etti\u011fini s\u00f6yledi.<img loading=\"lazy\" class=\"alignright wp-image-51156 size-medium\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/03\/ispartada-7-milyon-tllik-yatirimla-copten-elektrik-uretilecek-300x165.jpg\" alt=\"bingoldaki-copten-enerji-uretimi-yil-sonunda-basliyor\" width=\"300\" height=\"165\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/03\/ispartada-7-milyon-tllik-yatirimla-copten-elektrik-uretilecek-300x165.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/03\/ispartada-7-milyon-tllik-yatirimla-copten-elektrik-uretilecek-500x276.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/03\/ispartada-7-milyon-tllik-yatirimla-copten-elektrik-uretilecek-80x44.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/03\/ispartada-7-milyon-tllik-yatirimla-copten-elektrik-uretilecek.jpg 696w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/strong><\/p>\n<p>Ba\u015fkan Barakazi, \u201cDaha \u00f6nce ihalesini ger\u00e7ekle\u015ftirdi\u011fimiz kat\u0131 at\u0131k depolama alan\u0131nda \u00e7al\u0131\u015fmalar\u0131n\u0131 s\u00fcrd\u00fcren y\u00fcklenici firma, \u00e7\u00f6p\u00fcn \u00fczerini toprak \u00f6rt\u00fcleme sistemiyle kapatt\u0131. \u00c7al\u0131\u015fmalar kapsam\u0131nda \u00e7\u00f6p alt\u0131 gaz alma sistemi tamamland\u0131. Drenaj kanallar\u0131 faal hale getirilerek, k\u00fcl stok alan\u0131 tamamen toprak ile kapat\u0131ld\u0131\u201d dedi.<\/p>\n<p>Kat\u0131 at\u0131k depolama tesisinde g\u00fcnl\u00fck olarak depolanan 240 ton \u00e7\u00f6p\u00fcn elektrik enerjisine d\u00f6n\u00fc\u015ft\u00fcr\u00fclece\u011fini dile getiren Barakazi,\u201d Yat\u0131r\u0131m\u0131n hayata ge\u00e7irilmesiyle birlikte ilk etapta 1 megawatt enerji \u00fcretilecek. Hem \u00e7evre kirlili\u011fini ortadan kald\u0131r\u0131yoruz hem de d\u0131\u015fa ba\u011f\u0131ml\u0131 oldu\u011fumuz enerjiyi yerinde \u00fcretiyoruz. \u00c7evre dostu yat\u0131r\u0131mla birlikte hem do\u011fam\u0131z\u0131 koruyaca\u011f\u0131z hem de belediyemizin gelir kalemlerine bir yenisi ekleyece\u011fiz. Y\u0131l sonuna kadar enerji \u00fcretilecek\u201d diye konu\u015ftu.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Bing\u00f6l Belediye Ba\u015fkan\u0131 Y\u00fccel Barakazi, kat\u0131 at\u0131k d\u00fczenli depolama sahas\u0131nda entegre tesis, saha i\u015fletmesi, \u00f6n ayr\u0131\u015ft\u0131rma, \u00e7\u00f6pten enerji \u00fcretimi ve fermantasyon tesisi kurulmas\u0131 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":51156,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[22893,51,53],"tags":[38047,2880,61,67,1009,23311,38048,36309],"views":881,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/75465"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=75465"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/75465\/revisions"}],"predecessor-version":[{"id":75466,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/75465\/revisions\/75466"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/51156"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=75465"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=75465"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=75465"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}