{"id":75422,"date":"2018-06-21T10:41:11","date_gmt":"2018-06-21T07:41:11","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=75422"},"modified":"2018-06-21T10:41:11","modified_gmt":"2018-06-21T07:41:11","slug":"cin-turkiyenin-ruzgarina-226-milyon-dolar-yatirim-yapacak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/cin-turkiyenin-ruzgarina-226-milyon-dolar-yatirim-yapacak\/","title":{"rendered":"(Turkish) \u00c7in, T\u00fcrkiye&#8217;nin R\u00fczgar\u0131na 226 Milyon Dolar Yat\u0131r\u0131m Yapacak"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/75422\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<div id=\"wrapper\">\n<div id=\"main\">\n<section id=\"haber1\">\n<div class=\"container\">\n<p><strong>\u00c7in Devlet Kalk\u0131nma ve Yat\u0131r\u0131m Kurumu (SDIC), Smart Growth Holding ve m\u00fcteahhitlik \u015firketi PowerChina, Ayd\u0131n ve Manisa&#8217;da 170 megavat kapasiteli r\u00fczgar enerjisi santrali yat\u0131r\u0131m\u0131n\u0131 hayata ge\u00e7irmek \u00fczere 226 milyon dolarl\u0131k mutabakat anla\u015fmas\u0131 imzalad\u0131.<\/strong><\/p>\n<p><img loading=\"lazy\" class=\"alignleft size-medium wp-image-75423\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/06\/cin-turkiyenin-ruzgarina-226-milyon-dolar-yatirim-yapacak-300x180.jpg\" alt=\"\" width=\"300\" height=\"180\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/06\/cin-turkiyenin-ruzgarina-226-milyon-dolar-yatirim-yapacak-300x180.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/06\/cin-turkiyenin-ruzgarina-226-milyon-dolar-yatirim-yapacak-500x300.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/06\/cin-turkiyenin-ruzgarina-226-milyon-dolar-yatirim-yapacak-80x48.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/06\/cin-turkiyenin-ruzgarina-226-milyon-dolar-yatirim-yapacak.jpg 640w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>Burada verilen bilgilere g\u00f6re, kredisi \u00f6denemedi\u011fi i\u00e7in operasyonu ve haklar\u0131 Albaraka T\u00fcrk&#8217;te bulunan 30 megavatl\u0131k Ayd\u0131n S\u00f6ke r\u00fczgar enerjisi santrali ile hen\u00fcz lisans a\u015famas\u0131nda olan 140 megavat kapasiteli d\u00f6rt r\u00fczgar santrali yat\u0131r\u0131m\u0131 i\u00e7in mutabakat anla\u015fmas\u0131 ger\u00e7ekle\u015ftirildi.<\/p>\n<p>Yat\u0131r\u0131m bedelinin 226 milyon dolar olaca\u011f\u0131 &#8220;Mavi Projenin&#8221; m\u00fcteahhitli\u011fini Powerchina \u015firketi \u00fcstlenirken, yat\u0131r\u0131mc\u0131l\u0131\u011f\u0131n\u0131 SDIC ve Smart Growth Holding yapacak. Projede, SDIC&#8217;nin y\u00fczde 80, Smart Growth Holding&#8217;in y\u00fczde 20 pay\u0131 bulunuyor. Eyl\u00fcl 2020&#8217;de projenin lisans a\u015famas\u0131nda bulunan 140 megavatl\u0131k k\u0131sm\u0131nda elektrik \u00fcretimine ba\u015flanmas\u0131 hedefleniyor.<\/p>\n<\/div>\n<\/section>\n<\/div>\n<\/div>\n<p><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. \u00c7in Devlet Kalk\u0131nma ve Yat\u0131r\u0131m Kurumu (SDIC), Smart Growth Holding ve m\u00fcteahhitlik \u015firketi PowerChina, Ayd\u0131n ve Manisa&#8217;da 170 megavat kapasiteli r\u00fczgar enerjisi [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":75423,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,50],"tags":[886,67,1009,474,24949,231,23318,846],"views":553,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/75422"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=75422"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/75422\/revisions"}],"predecessor-version":[{"id":75424,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/75422\/revisions\/75424"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/75423"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=75422"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=75422"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=75422"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}