{"id":75377,"date":"2018-06-20T12:10:56","date_gmt":"2018-06-20T09:10:56","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=75377"},"modified":"2018-06-20T12:10:56","modified_gmt":"2018-06-20T09:10:56","slug":"afyona-eber-biyokutle-enerji-santrali-yapilacak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/afyona-eber-biyokutle-enerji-santrali-yapilacak\/","title":{"rendered":"(Turkish) Afyon\u2019a Eber Biyok\u00fctle Enerji Santrali Yap\u0131lacak"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/75377\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Oltan-K\u00f6leo\u011flu Elektrik ve Enerji \u00dcretimi Tic. A.\u015e. taraf\u0131ndan ikinci biyok\u00fctle enerji santrali AfyonKarahisar\u2019\u0131n \u00c7ay il\u00e7esinde kuruluyor.<\/strong><\/p>\n<p><span id=\"more-100481\"><\/span>Yakla\u015f\u0131k 480 d\u00f6n\u00fcml\u00fck bir alan \u00fczerine kurulacak Eber Biyok\u00fctle Enerji Santrali 25 MW kurulu g\u00fcce sahip olacak. \u015eirket Y\u00f6netim Kurulu Ba\u015fkan\u0131 Ertu\u011frul Do\u011fan, proje ile her y\u0131l Eber g\u00f6l\u00fcndeki saz <img loading=\"lazy\" class=\"alignright size-medium wp-image-75378\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/06\/afyona-eber-biyokutle-enerji-santrali-yapilacak-300x167.jpg\" alt=\"\" width=\"300\" height=\"167\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/06\/afyona-eber-biyokutle-enerji-santrali-yapilacak-300x167.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/06\/afyona-eber-biyokutle-enerji-santrali-yapilacak-768x427.jpg 768w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/06\/afyona-eber-biyokutle-enerji-santrali-yapilacak-500x278.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/06\/afyona-eber-biyokutle-enerji-santrali-yapilacak-80x45.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/06\/afyona-eber-biyokutle-enerji-santrali-yapilacak.jpg 800w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>kam\u0131\u015flar\u0131 ve hasat sonras\u0131nda tar\u0131m arazisi \u00fczerinde kalan tar\u0131msal at\u0131klar ile orman \u00fcr\u00fcnleri toplanarak, m\u00fcmk\u00fcn olan en d\u00fc\u015f\u00fck emisyonlar ile yasal limitlerinin alt\u0131nda yak\u0131l\u0131p, elektrik \u00fcretilece\u011fini s\u00f6yledi.<\/p>\n<p>Do\u011fan; \u201cEnerjide d\u0131\u015fa ba\u011f\u0131ml\u0131 olan \u00fclkemize yerli kaynaklardan elektrik \u00fcreterek katk\u0131 sa\u011flanacakt\u0131r. K\u0131rsal kesimdeki i\u015fsizli\u011fe bir nebze olsun \u00e7\u00f6z\u00fcm olacak, ekonomik g\u00fcc\u00fc art\u0131racak ve k\u0131rsaldan \u015fehre g\u00f6\u00e7\u00fcn \u00f6n\u00fcne ge\u00e7ilecektir\u201d dedi.\u00a0Ertu\u011frul Do\u011fan\u2019\u0131n verdi\u011fi bilgiye g\u00f6re, in\u015faat\u0131na ba\u015flanan enerji santrali, yakla\u015f\u0131k 35 milyon dolarl\u0131k harcama ile gelecek y\u0131l tamamlanacak ve 2020 y\u0131l\u0131n\u0131n ba\u015f\u0131nda \u00fcretime ge\u00e7ecek. Tesiste 100 ki\u015fi \u00e7al\u0131\u015facak.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Oltan-K\u00f6leo\u011flu Elektrik ve Enerji \u00dcretimi Tic. A.\u015e. taraf\u0131ndan ikinci biyok\u00fctle enerji santrali AfyonKarahisar\u2019\u0131n \u00c7ay il\u00e7esinde kuruluyor. Yakla\u015f\u0131k 480 d\u00f6n\u00fcml\u00fck bir alan \u00fczerine kurulacak [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":75378,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[22893,53],"tags":[1110,35143,3835,29816,68,67,1009,37995,26829,1707],"views":2176,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/75377"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=75377"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/75377\/revisions"}],"predecessor-version":[{"id":75379,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/75377\/revisions\/75379"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/75378"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=75377"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=75377"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=75377"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}