{"id":75155,"date":"2018-06-11T22:27:10","date_gmt":"2018-06-11T19:27:10","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=75155"},"modified":"2018-06-11T22:27:10","modified_gmt":"2018-06-11T19:27:10","slug":"turkiyede-elektrik-uretim-kapasitesi-87-gw-sinirini-asti","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/turkiyede-elektrik-uretim-kapasitesi-87-gw-sinirini-asti\/","title":{"rendered":"(Turkish) T\u00fcrkiye&#8217;de Elektrik \u00dcretim Kapasitesi 87 GW S\u0131n\u0131r\u0131n\u0131 A\u015ft\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/75155\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>T\u00fcrkiye&#8217;nin elektrik \u00fcretim kapasitesi, 31 May\u0131s itibari ile 87.040,9 MW&#8217;a y\u00fckseldi. T\u00fcrkiye Elektrik \u0130letim A.\u015e. taraf\u0131ndan\u00a0<a href=\"https:\/\/www.teias.gov.tr\/sites\/default\/files\/2018-06\/kurulu_guc_mayis_2018.pdf\" target=\"_blank\" rel=\"noopener\">a\u00e7\u0131klanan verilere g\u00f6re<\/a>\u00a0May\u0131s ay\u0131ndaki kapasite art\u0131\u015f\u0131 111 MW, y\u0131l\u0131n ilk be\u015f ay\u0131ndaki toplam art\u0131\u015f ise 1.840,9 MW oldu.<img loading=\"lazy\" class=\"alignright size-medium wp-image-38895\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/05\/turkiyenin-elektrik-uretim-kapasitesi-70-gwi-gecti-300x163.jpg\" alt=\"\" width=\"300\" height=\"163\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/05\/turkiyenin-elektrik-uretim-kapasitesi-70-gwi-gecti-300x163.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/05\/turkiyenin-elektrik-uretim-kapasitesi-70-gwi-gecti-80x43.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/05\/turkiyenin-elektrik-uretim-kapasitesi-70-gwi-gecti.jpg 460w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/strong><\/p>\n<p>Bu d\u00f6nemdeki art\u0131\u015fa en fazla katk\u0131 1.277 MW ile a\u00e7\u0131k ara lisanss\u0131z g\u00fcne\u015f enerjisi yat\u0131r\u0131mlar\u0131 taraf\u0131ndan ger\u00e7ekle\u015fti. Son art\u0131\u015flar ile birlikte T\u00fcrkiye&#8217;nin g\u00fcne\u015f enerjisine dayal\u0131 elektrik \u00fcretim kapasitesi, 22,9 MW&#8217;l\u0131k b\u00f6l\u00fcm\u00fc lisansl\u0131 alanda olmak \u00fczere 4.702,9 MW&#8217;a ula\u015ft\u0131.<\/p>\n<p>R\u00fczgar enerjisine dayal\u0131 kapasite 6.667,4 MW&#8217;a, jeotermal enerji alan\u0131ndaki kapasite 1.129,2 MW&#8217;a, Barajl\u0131 hidroelektrik santrallerinin g\u00fcc\u00fc 20.121,5 MW, akarsu tipi hidroelektrik santrallerin g\u00fcc\u00fc 7.593,4 MW, termik santraller alan\u0131nda; yerli k\u00f6m\u00fcre dayal\u0131 kapasite 9.872,6 MW, ithal k\u00f6m\u00fcre dayal\u0131 kapasite 8.793,9 MW, do\u011fal gaza dayal\u0131 kapasite ise 22.942,7 MW g\u00fcc\u00fcnde oldu.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.T\u00fcrkiye&#8217;nin elektrik \u00fcretim kapasitesi, 31 May\u0131s itibari ile 87.040,9 MW&#8217;a y\u00fckseldi. T\u00fcrkiye Elektrik \u0130letim A.\u015e. taraf\u0131ndan\u00a0a\u00e7\u0131klanan verilere g\u00f6re\u00a0May\u0131s ay\u0131ndaki kapasite art\u0131\u015f\u0131 111 MW, [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":38895,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53],"tags":[34979,19638,26353,4996,19,67,1009,846],"views":736,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/75155"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=75155"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/75155\/revisions"}],"predecessor-version":[{"id":75156,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/75155\/revisions\/75156"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/38895"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=75155"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=75155"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=75155"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}