{"id":75135,"date":"2018-06-11T21:30:48","date_gmt":"2018-06-11T18:30:48","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=75135"},"modified":"2018-06-11T21:30:48","modified_gmt":"2018-06-11T18:30:48","slug":"ayzey-elektrikten-giresuna-42-mwlik-sancak-hes","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/ayzey-elektrikten-giresuna-42-mwlik-sancak-hes\/","title":{"rendered":"(Turkish) Ayzey Elektrik&#8217;ten Giresun\u2019a 42 MW\u2019l\u0131k Sancak HES"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/75135\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Ayzey Elektrik Giresun\u2019un Espiye il\u00e7esinde toplam 42 MW kapasiteli Sancak Hidroelektrik Santrali kurmay\u0131 planl\u0131yor.<\/strong><\/p>\n<p><span id=\"more-100362\"><img loading=\"lazy\" class=\"alignleft size-medium wp-image-75136\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/06\/ayzey-elektrikten-giresuna-42-mwlik-sancak-hes-300x200.jpg\" alt=\"\" width=\"300\" height=\"200\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/06\/ayzey-elektrikten-giresuna-42-mwlik-sancak-hes-300x200.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/06\/ayzey-elektrikten-giresuna-42-mwlik-sancak-hes-500x333.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/06\/ayzey-elektrikten-giresuna-42-mwlik-sancak-hes-75x50.jpg 75w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/06\/ayzey-elektrikten-giresuna-42-mwlik-sancak-hes.jpg 696w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/span>Ayzey Elektrik \u00dcretim A.\u015e. Giresun\u2019un Espiye il\u00e7esine ba\u011fl\u0131 Ye\u015filk\u00f6y, Direkb\u00fck\u00fc, Kurugeri\u015f, G\u00fcm\u00fc\u015fdere, Yenik\u00f6y, Seydik\u00f6y K\u00f6yleri ve G\u00fcce \u0130l\u00e7esi D\u00fcz\u00e7ukur K\u00f6y\u00fc s\u0131n\u0131rlar\u0131 i\u00e7erisinde 41.890 MW kapasiteli Sancak Hidroelektrik Santrali (HES) kurmay\u0131 planlan\u0131yor. Ayr\u0131ca \u015firket santral i\u00e7in ihtiya\u00e7 duyulan k\u0131rmata\u015f malzemelerin ve haz\u0131r betonun temin edilebilmesi amac\u0131yla 2 adet 250.000 ton\/y\u0131l kapasiteli olmak \u00fczere toplamda 500.000 ton\/y\u0131l kapasiteli K\u0131rma-Eleme Tesisi ve 2 adet 50 m3\/saat kapasiteli olmak \u00fczere toplamda 100 m3\/saat kapasiteli Haz\u0131r Beton Santrali de kuracak.<\/p>\n<p>Karadona Reg\u00fclat\u00f6r\u00fc\u2019n\u00fcn sa\u011f sahilinden ve Karaovac\u0131k Reg\u00fclat\u00f6r\u00fc\u2019n\u00fcn sol sahilinden al\u0131nacak olan sular, 43.620 MWm kurulu g\u00fcc\u00fcnde Sancak HES\u2019e sepet kulbu t\u00fcnel ve kutu kesit kanal ile iletilecek. 206 milyon liradan fazlaya malolacak santralde y\u0131lda ortalama 105 GWh elektrik \u00fcretilecek. Sancak HES\u2019de \u00fcretilen enerji toplam 37.50 MVA (6.3\/31.5 kV) g\u00fcc\u00fcndeki trafo \u00e7\u0131k\u0131\u015f\u0131nda d\u00fczenlenecek \u015falt panolar\u0131 \u00fczerinden iletilecek.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Ayzey Elektrik Giresun\u2019un Espiye il\u00e7esinde toplam 42 MW kapasiteli Sancak Hidroelektrik Santrali kurmay\u0131 planl\u0131yor. Ayzey Elektrik \u00dcretim A.\u015e. Giresun\u2019un Espiye il\u00e7esine ba\u011fl\u0131 Ye\u015filk\u00f6y, [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":75136,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,47],"tags":[37929,68,67,1009,18,34926,4639,1090],"views":2089,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/75135"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=75135"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/75135\/revisions"}],"predecessor-version":[{"id":75137,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/75135\/revisions\/75137"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/75136"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=75135"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=75135"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=75135"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}