{"id":75129,"date":"2018-06-11T15:35:54","date_gmt":"2018-06-11T12:35:54","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=75129"},"modified":"2018-06-11T15:35:54","modified_gmt":"2018-06-11T12:35:54","slug":"almanyanin-planlanan-komur-cikisi-duvara-carpti","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/almanyanin-planlanan-komur-cikisi-duvara-carpti\/","title":{"rendered":"(Turkish) Almanya\u2019n\u0131n Planlanan K\u00f6m\u00fcr \u00c7\u0131k\u0131\u015f\u0131 Duvara \u00c7arpt\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/75129\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Almanya\u2019n\u0131n k\u00f6m\u00fcr\u00fc a\u015famal\u0131 olarak devreden \u00e7\u0131karma s\u00fcrecinin bu hafta tan\u0131t\u0131lmas\u0131 bekleniyordu, ancak h\u00fck\u00fcmet d\u00fcn sessizce program\u0131n a\u00e7\u0131klanmas\u0131n\u0131n geciktirdiklerini duyurdu. <\/strong><\/p>\n<p><img loading=\"lazy\" class=\"alignleft size-medium wp-image-53384\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/05\/almanya-elektriginde-komurun-payi-ilk-sirada-300x178.jpg\" alt=\"\" width=\"300\" height=\"178\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/05\/almanya-elektriginde-komurun-payi-ilk-sirada-300x178.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/05\/almanya-elektriginde-komurun-payi-ilk-sirada-500x298.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/05\/almanya-elektriginde-komurun-payi-ilk-sirada-80x47.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/05\/almanya-elektriginde-komurun-payi-ilk-sirada.jpg 1000w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>K\u00f6m\u00fcr \u00e7\u0131k\u0131\u015f komisyonunun lansman\u0131 \u00fc\u00e7\u00fcnc\u00fc kez gecikmi\u015f oldu. Angela Merkel\u2019in a\u00e7\u0131klamas\u0131ndan \u00f6nce h\u00fck\u00fcmetin bu konuda ba\u015far\u0131s\u0131z olaca\u011f\u0131 \u00f6ng\u00f6r\u00fclm\u00fc\u015f ve kulislere yans\u0131m\u0131\u015ft\u0131. Fikir ortaya at\u0131ld\u0131\u011f\u0131ndan bu yana, komiteye kimin liderlik yapaca\u011f\u0131, neler yap\u0131laca\u011f\u0131 ve ne kadar g\u00fcc\u00fc olaca\u011f\u0131 konusunda tart\u0131\u015fmalar oldu.<\/p>\n<p>Fakat Berlin, gecikmelere ra\u011fmen, y\u0131l sonuna kadar Almanya\u2019da k\u00f6m\u00fcr kullan\u0131m\u0131 i\u00e7in biti\u015f tarihi belirleme zaman\u0131na sad\u0131k kalmas\u0131 konusunda \u0131srar ediyor. H\u00fck\u00fcmet, k\u00f6m\u00fcr b\u00f6lgelerinin 2021 y\u0131l\u0131na kadar di\u011fer ekonomik faaliyet t\u00fcrlerine ge\u00e7i\u015fine yard\u0131mc\u0131 olmak i\u00e7in 1,5 milyar avro b\u00fct\u00e7e ay\u0131rd\u0131. Ayr\u0131ca, 2030 y\u0131l\u0131na kadar Almanya\u2019n\u0131n yenilenebilir enerji pay\u0131 hedefini %50\u2019den, %65\u2019e \u00e7\u0131karmay\u0131 taahh\u00fct etti.<\/p>\n<p><a href=\"https:\/\/www.forbes.com\/sites\/davekeating\/2018\/05\/31\/germanys-planned-coal-exit-hits-a-wall\/#11b192ba1d02\"><em>Forbes<\/em><\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Almanya\u2019n\u0131n k\u00f6m\u00fcr\u00fc a\u015famal\u0131 olarak devreden \u00e7\u0131karma s\u00fcrecinin bu hafta tan\u0131t\u0131lmas\u0131 bekleniyordu, ancak h\u00fck\u00fcmet d\u00fcn sessizce program\u0131n a\u00e7\u0131klanmas\u0131n\u0131n geciktirdiklerini duyurdu. K\u00f6m\u00fcr \u00e7\u0131k\u0131\u015f komisyonunun lansman\u0131 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":53384,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,24649],"tags":[929,67,1009,34967,5097],"views":538,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/75129"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=75129"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/75129\/revisions"}],"predecessor-version":[{"id":75130,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/75129\/revisions\/75130"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/53384"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=75129"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=75129"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=75129"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}