{"id":75094,"date":"2018-06-10T17:11:45","date_gmt":"2018-06-10T14:11:45","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=75094"},"modified":"2018-06-10T17:11:45","modified_gmt":"2018-06-10T14:11:45","slug":"alanya-belediyesinin-gunes-santrali-1-milyon-794-bin-990-lira-kar-elde-etti","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/alanya-belediyesinin-gunes-santrali-1-milyon-794-bin-990-lira-kar-elde-etti\/","title":{"rendered":"(Turkish) Alanya Belediyesi&#8217;nin G\u00fcne\u015f Santrali 1 Milyon 794 Bin 990 Lira Kar Elde Etti"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/75094\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Alanya\u2019n\u0131n Toslak Mahallesi, Karada\u011f mevkiinde Temmuz 2017 tarihinde Alanya Belediyesi\u2019nin hizmete ald\u0131\u011f\u0131 Alanya GES, belediyenin elektrik sarfiyat giderlerini azaltarak kar elde etti.<\/strong><\/p>\n<h5>8 AYDA 1 M\u0130LYON 794 B\u0130N 990 TL\u2019L\u0130K ENERJ\u0130<\/h5>\n<p>Alanya Belediyesi taraf\u0131ndan enerji ihtiyac\u0131n\u0131n b\u00fcy\u00fck \u00f6l\u00e7\u00fcde kar\u015f\u0131lanmas\u0131 i\u00e7in kurulan 3 MW \u015febeke ba\u011flant\u0131l\u0131 GES\u2019te, 12 bin 200 adet panel kullan\u0131ld\u0131. \u0130l\u00e7eye 40 y\u0131l hizmet edecek \u015fekilde tasarlanan ve <img loading=\"lazy\" class=\"alignleft size-medium wp-image-75095\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/06\/alanya-belediyesinin-gunes-santrali-1-milyon-794-bin-990-lira-kar-elde-etti-300x150.jpg\" alt=\"\" width=\"300\" height=\"150\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/06\/alanya-belediyesinin-gunes-santrali-1-milyon-794-bin-990-lira-kar-elde-etti-300x150.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/06\/alanya-belediyesinin-gunes-santrali-1-milyon-794-bin-990-lira-kar-elde-etti-500x250.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/06\/alanya-belediyesinin-gunes-santrali-1-milyon-794-bin-990-lira-kar-elde-etti-80x40.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/06\/alanya-belediyesinin-gunes-santrali-1-milyon-794-bin-990-lira-kar-elde-etti.jpg 640w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>belediyenin en \u00f6nemli projelerinden biri olan GES, 8 ayl\u0131k s\u00fcrede 3 milyon 824 bin 200 kilovat\/saat \u00fcretim ger\u00e7ekle\u015ftirdi. Belediye elde edilen \u00fcretimden 1 milyon 794 bin 990 TL\u2019lik kazan\u00e7 sa\u011flad\u0131.<\/p>\n<p>Belediye Ba\u015fkan\u0131 Adem Murat Y\u00fccel, \u201cGES\u2019ten ciddi gelir elde etmeye ba\u015flad\u0131k. Santralimizi daha da b\u00fcy\u00fctece\u011fiz. GES-4 Projesi i\u00e7in de haz\u0131rl\u0131klara ba\u015flad\u0131k. Konuyla ilgili gerekli izin ve altyap\u0131 \u00e7al\u0131\u015fmalar\u0131n\u0131 s\u00fcrd\u00fcr\u00fcyoruz. 2018 itibariyle bu projeyi de hayata ge\u00e7irmeyi hedefliyoruz. GES-4 projesinin de hayata ge\u00e7irilmesiyle belediyemizin elektrik ihtiyac\u0131n\u0131n tamam\u0131 g\u00fcne\u015f enerjisinden sa\u011flanm\u0131\u015f olacak\u201d dedi.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Alanya\u2019n\u0131n Toslak Mahallesi, Karada\u011f mevkiinde Temmuz 2017 tarihinde Alanya Belediyesi\u2019nin hizmete ald\u0131\u011f\u0131 Alanya GES, belediyenin elektrik sarfiyat giderlerini azaltarak kar elde etti. 8 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":75095,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49],"tags":[5257,37919,67,1009,2326,2569],"views":790,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/75094"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=75094"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/75094\/revisions"}],"predecessor-version":[{"id":75096,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/75094\/revisions\/75096"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/75095"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=75094"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=75094"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=75094"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}