{"id":75037,"date":"2018-06-08T17:07:14","date_gmt":"2018-06-08T14:07:14","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=75037"},"modified":"2018-06-08T17:07:14","modified_gmt":"2018-06-08T14:07:14","slug":"hindistanin-bihar-eyaletine-200-000-akilli-elektrik-sayaci-kuruluyor","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/hindistanin-bihar-eyaletine-200-000-akilli-elektrik-sayaci-kuruluyor\/","title":{"rendered":"(Turkish) Hindistan\u2019\u0131n Bihar Eyaletine 200.000 Ak\u0131ll\u0131 Elektrik Sayac\u0131 Kuruluyor"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/75037\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<div id=\"wrapper\">\n<div id=\"main\">\n<section id=\"haber8\">\n<div class=\"container\">\n<p><strong>Bihar\u2019a kurulacak olan bu elektrik saya\u00e7lar\u0131, t\u00fcketicilerin rahatl\u0131\u011f\u0131n\u0131 art\u0131rmak ve g\u00fc\u00e7 h\u0131rs\u0131zl\u0131\u011f\u0131n\u0131 azaltmak i\u00e7in kullan\u0131lacak.<\/strong><\/p>\n<p>G\u00fcney Bihar Elektrik Da\u011f\u0131t\u0131m \u015eirketi Genel M\u00fcd\u00fcr\u00fc R. Lakshmanan: \u201cEyaletin enerji bakanl\u0131\u011f\u0131, Enerji Verimlili\u011fi Hizmetleri Limited \u015eirketi ile birlikte eyalet i\u00e7in 200.000 adet ak\u0131ll\u0131 \u00f6n \u00f6demeli saya\u00e7 al\u0131m\u0131 <img loading=\"lazy\" class=\"alignright size-medium wp-image-75038\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/06\/hindistanin-bihar-eyaletine-200-000-akilli-elektrik-sayaci-kuruluyor-300x225.jpg\" alt=\"\" width=\"300\" height=\"225\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/06\/hindistanin-bihar-eyaletine-200-000-akilli-elektrik-sayaci-kuruluyor-300x225.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/06\/hindistanin-bihar-eyaletine-200-000-akilli-elektrik-sayaci-kuruluyor-500x375.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/06\/hindistanin-bihar-eyaletine-200-000-akilli-elektrik-sayaci-kuruluyor-67x50.jpg 67w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/06\/hindistanin-bihar-eyaletine-200-000-akilli-elektrik-sayaci-kuruluyor.jpg 640w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>i\u00e7in ihale s\u00fcrecini ba\u015flatt\u0131. Kurulum \u00e7al\u0131\u015fmalar\u0131 Eyl\u00fcl ay\u0131nda ba\u015flayacak. \u0130lk a\u015famada, eyaletin t\u00fcm kentsel b\u00f6lgelerine yakla\u015f\u0131k 200.000 saya\u00e7 kurulacak \u201ddedi.<\/p>\n<p>Ve \u015funlar\u0131 ekledi: \u201cMasraflar hem eyalet hem de Merkezi h\u00fck\u00fcmet taraf\u0131ndan kar\u015f\u0131lanacakt\u0131r. \u0130lk a\u015famada kurulum \u00e7al\u0131\u015fmalar\u0131n\u0131n tamamlanmas\u0131 hedefi 2020 \u015eubat&#8217;t\u0131r. H\u00fck\u00fcmet kurumlar\u0131na ve konutlara yakla\u015f\u0131k 6.000 adet ak\u0131ll\u0131 \u00f6n \u00f6demeli elektrik sayac\u0131 kurulmu\u015f durumdad\u0131r. Ayr\u0131ca, pilot proje kapsam\u0131nda Gaya ve Hajipur&#8217;da yakla\u015f\u0131k 10.000 adet ak\u0131ll\u0131 elektrik sayac\u0131 kurulmu\u015ftur. Ancak, Gaya ve Hajipur\u2019da kurulu ak\u0131ll\u0131 saya\u00e7lar teknoloji a\u00e7\u0131s\u0131ndan eski versiyonlard\u0131r.\u201d<\/p>\n<p><strong>Projenin maliyeti yakla\u015f\u0131k 117 milyon $ olacak<\/strong><\/p>\n<p>Saya\u00e7lar\u0131n i\u015flevleriyle ilgili olarak Lakshmanan \u015f\u00f6yle konu\u015ftu: \u201c\u00d6n \u00f6demeli saya\u00e7lar Rs 50 ($ 0.70) kadar k\u00fc\u00e7\u00fck bir miktarla \u00f6nceden \u015farj edilebilir. T\u00fcketici, saya\u00e7lar\u0131n\u0131 herhangi bir zamanda cep telefonlar\u0131yla \u015farj edebilir. Ancak, ak\u0131ll\u0131 saya\u00e7lar\u0131n\u0131 online y\u00f6ntemle \u015farj etmek istemeyenler i\u00e7in, enerji bakanl\u0131\u011f\u0131n\u0131n ofislerinde \u015farj kontuarlar\u0131 bulundurulacakt\u0131r.\u201d<\/p>\n<p>Lakshmanan s\u00f6zlerine \u015funlar\u0131 ekledi: \u201cBir ak\u0131ll\u0131 saya\u00e7, 1 saat veya daha k\u0131sa aral\u0131klarla elektrik enerjisinin t\u00fcketimini kaydeder ve bu verileri enerji \u015firketine iletiyor. Bu, enerji \u015firketlerinin mevsime ve g\u00fcn\u00fcn saatine g\u00f6re fiyat farkl\u0131la\u015fmas\u0131 sa\u011flamas\u0131na olanak tan\u0131yor. Bu da, t\u00fcketicileri enerji t\u00fcketim modellerini de\u011fi\u015ftirmeye te\u015fvik ediyor.\u201d<\/p>\n<p><strong>Kaynak: <\/strong><a href=\"https:\/\/www.metering.com\/news\/smart-electricity-meter-bihar-india\/?utm_source=Spintelligent+Publishing+mailer&amp;utm_medium=email&amp;utm_campaign=MSEI+Daily+Enews+21+May+2018&amp;utm_term=https%3A%2F%2Fwww.metering.com%2Fnews%2Fsmart-electricity-meter-bihar-india%2F\" target=\"_blank\" rel=\"noopener\"><strong><em>Metering<\/em><\/strong><\/a><\/p>\n<\/div>\n<\/section>\n<\/div>\n<\/div>\n<p><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Bihar\u2019a kurulacak olan bu elektrik saya\u00e7lar\u0131, t\u00fcketicilerin rahatl\u0131\u011f\u0131n\u0131 art\u0131rmak ve g\u00fc\u00e7 h\u0131rs\u0131zl\u0131\u011f\u0131n\u0131 azaltmak i\u00e7in kullan\u0131lacak. G\u00fcney Bihar Elektrik Da\u011f\u0131t\u0131m \u015eirketi Genel M\u00fcd\u00fcr\u00fc [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":75038,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53],"tags":[33550,34979,19638,11791,26353,67,1009,4034],"views":1385,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/75037"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=75037"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/75037\/revisions"}],"predecessor-version":[{"id":75039,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/75037\/revisions\/75039"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/75038"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=75037"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=75037"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=75037"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}