{"id":74702,"date":"2018-05-31T07:02:54","date_gmt":"2018-05-31T04:02:54","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=74702"},"modified":"2018-05-31T07:02:54","modified_gmt":"2018-05-31T04:02:54","slug":"akkuyu-ngsde-servis-hizmetini-rosenergoatom-verecek","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/akkuyu-ngsde-servis-hizmetini-rosenergoatom-verecek\/","title":{"rendered":"(Turkish) Akkuyu NGS\u2019de Servis Hizmetini Rosenergoatom Verecek"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/74702\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Rusya\u2019daki t\u00fcm n\u00fckleer santrallerin i\u015fletmesini y\u00fcr\u00fcten Rosenergoatom \u015firketinin faaliyet raporunda yer alan bilgilere g\u00f6re \u015firket, 2017 y\u0131l\u0131nda Akkuyu NGS\u2019nin servis bak\u0131m\u0131na ili\u015fkin anla\u015fmay\u0131 imzalad\u0131.<\/strong><\/p>\n<p>3 Nisan\u2019da 1 numaral\u0131 blokunun in\u015faat\u0131na resmen ba\u015flanan Akkuyu NGS Projesi\u2019ne ili\u015fkin ilk anla\u015fma 2010 y\u0131l\u0131nda Rusya ile imzalanm\u0131\u015ft\u0131. Akkuyu\u2019da yap\u0131lacak santral 4 bin 800 megavat kurulu g\u00fcce sahip 4 <img loading=\"lazy\" class=\"alignleft size-medium wp-image-46864\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/11\/akkuyu-ngs-238778923-696x385-300x165.jpg\" alt=\"\" width=\"300\" height=\"165\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/11\/akkuyu-ngs-238778923-696x385-300x165.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/11\/akkuyu-ngs-238778923-696x385-500x276.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/11\/akkuyu-ngs-238778923-696x385-80x44.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/11\/akkuyu-ngs-238778923-696x385.jpg 696w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>reakt\u00f6rden olu\u015facak. Fuku\u015fima kazas\u0131ndan sonra kabul edilen en ileri g\u00fcvenlik standartlar\u0131na uygun olan Akkuyu NGS Projesi, 20 milyar dolar maliyetiyle Rusya\u2019n\u0131n kamu kurulu\u015fu olan Rosatom\u2019un elindeki b\u00fcy\u00fck kontratlardan biri. Akkuyu NGS\u2019nin temeli, 3 Nisan\u2019da Ankara\u2019y\u0131 ziyaret eden Rusya Devlet Ba\u015fkan\u0131 Vladimir Putin ve Cumhurba\u015fkan\u0131 Recep Tayyip Erdo\u011fan taraf\u0131ndan telekonferans yoluyla at\u0131lm\u0131\u015ft\u0131.<\/p>\n<p>\u00dclkede kaynak \u00e7e\u015fitlili\u011fi sa\u011flayarak enerji arz g\u00fcvenli\u011fine katk\u0131da bulunacak olan Akkuyu NGS, i\u015fletmeye al\u0131nd\u0131\u011f\u0131nda T\u00fcrkiye\u2019nin elektrik ihtiyac\u0131n\u0131n yakla\u015f\u0131k y\u00fczde 10\u2019unu kar\u015f\u0131layacak. Akkuyu NGS\u2019de, in\u015faat\u0131n en yo\u011fun oldu\u011fu d\u00f6nemde yakla\u015f\u0131k 10 bin ki\u015fi, 60 y\u0131ll\u0131k i\u015fletme d\u00f6neminde ise 3 bin 500 ki\u015fi \u00e7al\u0131\u015facak.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Rusya\u2019daki t\u00fcm n\u00fckleer santrallerin i\u015fletmesini y\u00fcr\u00fcten Rosenergoatom \u015firketinin faaliyet raporunda yer alan bilgilere g\u00f6re \u015firket, 2017 y\u0131l\u0131nda Akkuyu NGS\u2019nin servis bak\u0131m\u0131na ili\u015fkin anla\u015fmay\u0131 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":47157,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,43],"tags":[3019,9809,67,1009,1133,21,23134,34930,2587,28511],"views":487,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/74702"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=74702"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/74702\/revisions"}],"predecessor-version":[{"id":74703,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/74702\/revisions\/74703"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/47157"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=74702"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=74702"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=74702"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}