{"id":74698,"date":"2018-05-31T06:56:17","date_gmt":"2018-05-31T03:56:17","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=74698"},"modified":"2018-05-31T06:56:17","modified_gmt":"2018-05-31T03:56:17","slug":"corum-res-enerji-uretimine-gecti","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/corum-res-enerji-uretimine-gecti\/","title":{"rendered":"(Turkish) \u00c7orum RES Enerji \u00dcretimine Ge\u00e7ti"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/74698\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Belediye Ba\u015fkan\u0131 Zeki G\u00fcl, Samsun\u2019un Ladik \u0130l\u00e7esine ba\u011fl\u0131 Budakdere k\u00f6y\u00fcnde bulunan RES tesislerini inceledi ve m\u00fchendislerden sistem hakk\u0131nda bilgi ald\u0131. Beraberinde Belediye Ba\u015fkan Yard\u0131mc\u0131s\u0131 Alper Zahir, Belediye Meclisi \u00dcyesi Mehmet D\u00f6ngel ve Ba\u015fkan Yard\u0131mc\u0131s\u0131 Elvan Zorlu ile RES tesislerine giden Ba\u015fkan G\u00fcl, burada bas\u0131n mensuplar\u0131na a\u00e7\u0131klamalarda bulundu.<\/strong><\/p>\n<p><img loading=\"lazy\" class=\"alignleft size-medium wp-image-59656\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/12\/gurisin-80-mw-fatma-resi-elektrik-uretimine-basladi-300x200.jpg\" alt=\"\" width=\"300\" height=\"200\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/12\/gurisin-80-mw-fatma-resi-elektrik-uretimine-basladi-300x200.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/12\/gurisin-80-mw-fatma-resi-elektrik-uretimine-basladi-1024x682.jpg 1024w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/12\/gurisin-80-mw-fatma-resi-elektrik-uretimine-basladi-500x333.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/12\/gurisin-80-mw-fatma-resi-elektrik-uretimine-basladi-75x50.jpg 75w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/12\/gurisin-80-mw-fatma-resi-elektrik-uretimine-basladi.jpg 1200w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>T\u00fcrkiye\u2019nin yenilenebilir enerji kaynaklar\u0131 (hidroelektrik de dahil) ile elektrik \u00fcretiminin pay\u0131n\u0131 en az y\u00fczde 30 seviyelerinde tutmay\u0131 hedefledi\u011fini kaydeden G\u00fcl, \u201c\u00d6zellikle tar\u0131m sekt\u00f6r\u00fc i\u00e7in biyoyak\u0131t enerjisi kullan\u0131m\u0131n\u0131n art\u0131r\u0131lmas\u0131na dair hedeflerimiz var. En \u00f6nemlisi de mevcut yenilenebilir enerji kaynaklar\u0131 ile yap\u0131lan \u00fcretim miktarlar\u0131n\u0131 art\u0131rmak istiyoruz. \u00c7\u00fcnk\u00fc artan n\u00fcfusa, geli\u015fen T\u00fcrkiye\u2019ye gerekli enerjiyi sa\u011flayabilmenin en ekonomik ve kal\u0131c\u0131 \u00e7\u00f6z\u00fcm\u00fc yenilenebilir enerji kaynaklar\u0131d\u0131r\u201d \u015feklinde kaydetti.<\/p>\n<p>\u00c7orum Belediyesi olarak hem \u00e7evreye ve do\u011faya duyarl\u0131 bir belediyecilik anlay\u0131\u015f\u0131 ile hem de s\u00fcrekli artan enerji ihtiyac\u0131n\u0131 kar\u015f\u0131lamak amac\u0131yla b\u00fcy\u00fck yat\u0131r\u0131ma imza att\u0131klar\u0131n\u0131 vurgulayan Ba\u015fkan G\u00fcl, \u015fehrin geli\u015fimine y\u00f6nelik \u00f6nemli yat\u0131r\u0131mlar yapan bir belediye olarak, t\u00fckettikleri enerjiyi kar\u015f\u0131lamak amac\u0131yla R\u00fczgar Enerji Santrali kurduklar\u0131n\u0131 s\u00f6yledi.<\/p>\n<p>R\u00fczg\u00e2r Enerjisi Santralinin 6 milyon 592 bin Euroya m\u00e2l oldu\u011funu belirten Ba\u015fkan G\u00fcl, \u201cKurulumunu tamamlad\u0131\u011f\u0131m\u0131z ve enerji \u00fcretimine ba\u015flad\u0131\u011f\u0131m\u0131z r\u00fczg\u00e2r t\u00fcrbinleri 7 \u2013 8 y\u0131l gibi bir s\u00fcrede kendilerini amorti ederek ortalama 20-25 y\u0131l enerji \u00fcretimi yapacak. Tesisin \u00c7orum Beledimize ve \u00e7evreye b\u00fcy\u00fck katk\u0131lar sa\u011flayaca\u011f\u0131n\u0131 \u00f6ng\u00f6r\u00fcyoruz. \u015eehrimize hay\u0131rl\u0131 olsun\u201d dedi. Ba\u015fkan G\u00fcl, RES projesinin hayata ge\u00e7irilmesi konusunda belediye teknik personelinin b\u00fcy\u00fck bir \u00f6zveri ile \u00e7al\u0131\u015ft\u0131\u011f\u0131n\u0131 da dile getirerek te\u015fekk\u00fcr etti.<\/p>\n<div class=\"td-a-rec td-a-rec-id-content_bottom  td_uid_28_5b0e58992f3c2_rand td_block_template_2\">\n<div id=\"ebDiv5748655579754318\" dir=\"ltr\"><\/div>\n<div id=\"ebDiv8310341101735146\" dir=\"ltr\"><\/div>\n<\/div>\n<p><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Belediye Ba\u015fkan\u0131 Zeki G\u00fcl, Samsun\u2019un Ladik \u0130l\u00e7esine ba\u011fl\u0131 Budakdere k\u00f6y\u00fcnde bulunan RES tesislerini inceledi ve m\u00fchendislerden sistem hakk\u0131nda bilgi ald\u0131. Beraberinde Belediye Ba\u015fkan [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":59656,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,50],"tags":[37798,19,67,1009,474,35002,233,231,35004,17,105],"views":868,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/74698"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=74698"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/74698\/revisions"}],"predecessor-version":[{"id":74699,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/74698\/revisions\/74699"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/59656"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=74698"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=74698"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=74698"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}