{"id":74693,"date":"2018-05-30T07:34:27","date_gmt":"2018-05-30T04:34:27","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=74693"},"modified":"2018-05-30T07:34:27","modified_gmt":"2018-05-30T04:34:27","slug":"bartinda-6-5-mwlik-katirova-hes-kurulacak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/bartinda-6-5-mwlik-katirova-hes-kurulacak\/","title":{"rendered":"(Turkish) Bart\u0131n\u2019da 6.5 MW\u2019l\u0131k Kat\u0131rova HES Kurulacak"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/74693\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Has Enerji, Bart\u0131n\u2019\u0131n Ulus il\u00e7esinde bulunan Kumluca \u00c7ay\u0131 \u00fczerinde 6.46 MW\u2019l\u0131k Kat\u0131rova Hidroelektrik Santrali kuracak.<\/strong><\/p>\n<p><img loading=\"lazy\" class=\"alignleft size-medium wp-image-74694\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/05\/bartinda-6-5-mwlik-katirova-hes-kurulacak-300x200.jpg\" alt=\"\" width=\"300\" height=\"200\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/05\/bartinda-6-5-mwlik-katirova-hes-kurulacak.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/05\/bartinda-6-5-mwlik-katirova-hes-kurulacak-75x50.jpg 75w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>Has Enerji \u00dcretim\u00a0\u0130letim ve Ticaret A.\u015e. taraf\u0131ndan Bart\u0131n \u0130li, Ulus \u0130l\u00e7esi, Uluk\u00f6y K\u00f6y\u00fc s\u0131n\u0131rlar\u0131 i\u00e7erisinde Kat\u0131rova Deresi \/Kumluca \u00c7ay\u0131 \u00fczerinde \u201cKat\u0131rova Reg\u00fclat\u00f6r\u00fc ve HES Projesi (6,726 MWm\/6,46 MWe)\u201dnin kurulmas\u0131 ve i\u015fletilmesi \u00f6ng\u00f6r\u00fclmektedir.<\/p>\n<p>Yakla\u015f\u0131k 21.6 milyon lira bedelli projenin in\u015faat a\u015famas\u0131nda 75, i\u015fletme a\u015famas\u0131nda ise 10 personelin \u00e7al\u0131\u015facak.<\/p>\n<p>Ekonomik \u00f6mr\u00fc 2 y\u0131l s\u00fcrecek in\u015faat faaliyetlerinden sonra 50 y\u0131l olarak \u00f6ng\u00f6r\u00fclen Kat\u0131rova HES\u2019te y\u0131lda toplam 19,250 GWh enerji \u00fcretilmesi ve \u00fcretilen elektri\u011fin toplam 8000 kVA (6.3\/34.5 kV) g\u00fcc\u00fcndeki trafo \u00e7\u0131k\u0131\u015f\u0131nda d\u00fczenlenecek \u015falt panolar\u0131 \u00fczerinden iletimi yap\u0131lacakt\u0131r.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Has Enerji, Bart\u0131n\u2019\u0131n Ulus il\u00e7esinde bulunan Kumluca \u00c7ay\u0131 \u00fczerinde 6.46 MW\u2019l\u0131k Kat\u0131rova Hidroelektrik Santrali kuracak. Has Enerji \u00dcretim\u00a0\u0130letim ve Ticaret A.\u015e. taraf\u0131ndan Bart\u0131n [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":74694,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,47],"tags":[7735,68,34979,26353,67,1009,37795,2035,37797,37796],"views":1038,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/74693"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=74693"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/74693\/revisions"}],"predecessor-version":[{"id":74695,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/74693\/revisions\/74695"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/74694"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=74693"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=74693"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=74693"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}