{"id":74613,"date":"2018-05-27T12:35:36","date_gmt":"2018-05-27T09:35:36","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=74613"},"modified":"2018-05-27T12:42:22","modified_gmt":"2018-05-27T09:42:22","slug":"blockchain-projesi-olan-solar-daonun-gunes-santrali-kazakistanda","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/blockchain-projesi-olan-solar-daonun-gunes-santrali-kazakistanda\/","title":{"rendered":"(Turkish) Blockchain Projesi Olan Solar Dao&#8217;nun G\u00fcne\u015f Santrali Kazakistan&#8217;da&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/74613\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Solar DAO taraf\u0131ndan\u00a0az b\u00fct\u00e7elere sahip olan yat\u0131r\u0131mc\u0131lara y\u00f6nelik g\u00fcne\u015f enerjisi yat\u0131r\u0131mlar\u0131na eri\u015fim hizmeti verilmektedir.\u00a0\u015eirket, k\u00fc\u00e7\u00fck yat\u0131r\u0131mc\u0131lara y\u00f6nelik d\u00fcnya \u00e7ap\u0131nda g\u00fcne\u015f enerjisi tesislerine kat\u0131lmaya, teknik engelleri a\u015f\u0131p \u201cd\u00fcnyan\u0131n her yerindeki PV g\u00fcne\u015f enerjisi santrallerine ortak olmaya y\u00f6nelik her b\u00fct\u00e7eye sahip insanlara\u201d yard\u0131m eden bir finansal arac\u0131 hizmete sundu.<\/strong><\/p>\n<p><img loading=\"lazy\" class=\"alignleft wp-image-51281 size-medium\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/03\/filipinlerde-bir-gunde-iki-ges-acilisi-300x184.jpg\" alt=\"solar-daonun-blockchain-projesi-olan-gunes-santrali-kazakistanda\" width=\"300\" height=\"184\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/03\/filipinlerde-bir-gunde-iki-ges-acilisi-300x184.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/03\/filipinlerde-bir-gunde-iki-ges-acilisi-80x50.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/03\/filipinlerde-bir-gunde-iki-ges-acilisi.jpg 448w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>D\u00fcnyan\u0131n ilk dijital, \u00f6zerk, kapal\u0131 u\u00e7lu, g\u00fcne\u015f enerji projesi yat\u0131r\u0131m fonu \u00fcnvan\u0131na sahip Solar DAO; herhangi bir b\u00fct\u00e7e ile g\u00fcne\u015f enerjisi projelerine ortak olmay\u0131 vadetmektedir. Uygulaman\u0131n Kazakistan\u2019da 4 MW g\u00fcc\u00fcnde olaca\u011f\u0131 da a\u00e7\u0131kland\u0131. Solar DAO, toplam geli\u015ftirme maliyetleri MW ba\u015f\u0131na 5.000 $ \u2018dan az olaca\u011f\u0131ndan, MW ba\u015f\u0131na ise yakla\u015f\u0131k 50.000 $ tasarruf sa\u011flanaca\u011f\u0131 da belirtildi.<\/p>\n<p>Solar DAO proje i\u015fletmecisi ve sahibi konumundaki GOTOSOLAR, Kazakistan\u2019daki ilk proje uygulamas\u0131na y\u00f6nelik a\u00e7\u0131klamas\u0131nda &#8220;D\u00fcnyada 15 \u00fclkede 500 kW\u2019dan 10 MW\u2019a kadar kapasiteye sahip 30 projeye y\u00f6nelik \u00e7al\u0131\u015fmalar ger\u00e7ekle\u015ftirip in\u015fa etmeye haz\u0131r projelerin se\u00e7imine odakland\u0131k,\u201d ifadelerini kulland\u0131.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Solar DAO taraf\u0131ndan\u00a0az b\u00fct\u00e7elere sahip olan yat\u0131r\u0131mc\u0131lara y\u00f6nelik g\u00fcne\u015f enerjisi yat\u0131r\u0131mlar\u0131na eri\u015fim hizmeti verilmektedir.\u00a0\u015eirket, k\u00fc\u00e7\u00fck yat\u0131r\u0131mc\u0131lara y\u00f6nelik d\u00fcnya \u00e7ap\u0131nda g\u00fcne\u015f enerjisi tesislerine kat\u0131lmaya, [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":51281,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49],"tags":[37775,67,1009,2326,37776,23416,2569,2401,23131,37774],"views":703,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/74613"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=74613"}],"version-history":[{"count":5,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/74613\/revisions"}],"predecessor-version":[{"id":74618,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/74613\/revisions\/74618"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/51281"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=74613"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=74613"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=74613"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}