{"id":74604,"date":"2018-05-27T11:53:52","date_gmt":"2018-05-27T08:53:52","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=74604"},"modified":"2018-05-27T11:56:07","modified_gmt":"2018-05-27T08:56:07","slug":"balikesir-dursunbeydeki-gunes-enerjisi-santrali-kar-elde-etmeye-basladi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/balikesir-dursunbeydeki-gunes-enerjisi-santrali-kar-elde-etmeye-basladi\/","title":{"rendered":"(Turkish) Bal\u0131kesir Dursunbey\u2019deki G\u00fcne\u015f Enerjisi Santrali Kar Elde Etmeye Ba\u015flad\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/74604\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Dursunbey Belediye Ba\u015fkan\u0131\u00a0Ramazan Bah\u00e7avan taraf\u0131ndan \u00c7ift\u00e7i Mahallesi Binge\u015fik mevkisinde 4 bin 260 adet g\u00fcne\u015f paneli kulan\u0131larak kurulumu ger\u00e7ekle\u015ftirilen g\u00fcne\u015f enerji santralinin (GES) i\u015fleyi\u015fi hakk\u0131nda de\u011ferlendirmelere yer verdi.<\/strong><\/p>\n<p><img loading=\"lazy\" class=\"alignright size-medium wp-image-68940\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/11\/gunes-santrali-danismanligi-hizmetlerinde-tercih-ozbilgin-enerji-300x169.jpg\" alt=\"\" width=\"300\" height=\"169\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/11\/gunes-santrali-danismanligi-hizmetlerinde-tercih-ozbilgin-enerji-300x169.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/11\/gunes-santrali-danismanligi-hizmetlerinde-tercih-ozbilgin-enerji-768x432.jpg 768w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/11\/gunes-santrali-danismanligi-hizmetlerinde-tercih-ozbilgin-enerji-500x281.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/11\/gunes-santrali-danismanligi-hizmetlerinde-tercih-ozbilgin-enerji-80x45.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/11\/gunes-santrali-danismanligi-hizmetlerinde-tercih-ozbilgin-enerji.jpg 994w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>Ramazan Bah\u00e7avan yapt\u0131\u011f\u0131 a\u00e7\u0131klamada, \u201ckendi kayna\u011f\u0131n\u0131 \u00fcreten bir belediye olarak, \u00fclkemizin ve il\u00e7emizin gelirine katk\u0131 sa\u011flamak i\u00e7in yenilenebilir enerji olan g\u00fcne\u015f enerji santralini belediyemiz b\u00fcnyesinde kurduk.\u00a0Uluda\u011f\u00a0Elektrik Da\u011f\u0131t\u0131m A\u015e ile 10 y\u0131ll\u0131k al\u0131m garantili olarak ba\u011flant\u0131 anla\u015fmam\u0131z yap\u0131ld\u0131 ve \u00fcretti\u011fimiz enerji ile tesis kendi borcunu \u00f6dedi\u011fi gibi \u015fu anda gelir elde ediyoruz.\u201d<\/p>\n<p>Bah\u00e7\u0131van, Dursunbey Belediyesinin kendi kaynaklar\u0131n\u0131 yaratmaya y\u00f6nelik olarak Bal\u0131kesir\u2019de \u00f6rnek belediyelerden birisi oldu\u011funu belirterek, \u201c\u0130\u015fte il\u00e7emizde daha \u00f6nce kurmu\u015f oldu\u011fumuz konkas\u00f6r tesisi, beton santrali, i\u015fletti\u011fimiz sosyal tesisler ve en son olarak da g\u00fcne\u015f enerjisi santrali ile kendi kaynaklar\u0131n\u0131 yaratmay\u0131 s\u00fcrd\u00fcrecektir.\u201d ifadelerini kulland\u0131.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Dursunbey Belediye Ba\u015fkan\u0131\u00a0Ramazan Bah\u00e7avan taraf\u0131ndan \u00c7ift\u00e7i Mahallesi Binge\u015fik mevkisinde 4 bin 260 adet g\u00fcne\u015f paneli kulan\u0131larak kurulumu ger\u00e7ekle\u015ftirilen g\u00fcne\u015f enerji santralinin (GES) i\u015fleyi\u015fi [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":68940,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49],"tags":[37766,37767,67,1009,2326,23416,2569,23133,23131],"views":732,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/74604"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=74604"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/74604\/revisions"}],"predecessor-version":[{"id":74605,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/74604\/revisions\/74605"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/68940"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=74604"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=74604"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=74604"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}