{"id":74573,"date":"2018-05-26T23:51:36","date_gmt":"2018-05-26T20:51:36","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=74573"},"modified":"2018-05-26T23:53:12","modified_gmt":"2018-05-26T20:53:12","slug":"itude-biyokutle-tesisi-kurulacak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/itude-biyokutle-tesisi-kurulacak\/","title":{"rendered":"(Turkish) \u0130T\u00dc&#8217;de Biyok\u00fctle Tesisi Kurulacak"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/74573\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>\u0130stanbul Teknik \u00dcniversitesi (\u0130T\u00dc) Bilimsel Ara\u015ft\u0131rma Projeleri Birimi (BAP) ve \u0130stanbul Kalk\u0131nma Ajans\u0131 (\u0130STKA) taraf\u0131ndan desteklenen &#8220;\u0130T\u00dc: S\u00fcrd\u00fcr\u00fclebilir Enerji \u00dcss\u00fc&#8221; isimli proje kapsam\u0131nda \u0130T\u00dc Ayaza\u011fa Yerle\u015fkesine \u201cAt\u0131ktan Enerji \u00dcretim Tesisi\u201d ve \u201cEngelsiz Ye\u015fil Ofis&#8221; kurulumu yap\u0131lacak.<\/strong><\/p>\n<p><strong>KAMP\u00dcS\u00dcN ELEKTR\u0130\u011e\u0130 B\u0130YOGAZ TES\u0130S\u0130NDEN KAR\u015eILANACAK<\/strong><\/p>\n<p><strong><img loading=\"lazy\" class=\"alignleft size-medium wp-image-74574\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/05\/itude-biyokutle-tesisi-kurulacak-300x200.jpg\" alt=\"\" width=\"300\" height=\"200\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/05\/itude-biyokutle-tesisi-kurulacak.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/05\/itude-biyokutle-tesisi-kurulacak-75x50.jpg 75w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/strong>Ayaza\u011fa Yerle\u015fkesinde, kayna\u011f\u0131nda ayr\u0131 toplanm\u0131\u015f yakla\u015f\u0131k 1.6 ton organik kat\u0131 at\u0131k, kurulacak olan At\u0131ktan Enerji \u00dcretim Tesisinde biyokimyasal d\u00f6n\u00fc\u015f\u00fcmlere u\u011frayarak yenilenebilir enerji kayna\u011f\u0131 olan metan gaz\u0131 i\u00e7erikli biyogaza d\u00f6n\u00fc\u015ft\u00fcr\u00fclecek. Olu\u015fan biyogaz, jenerat\u00f6r ile elektrik ve \u0131s\u0131 enerjisine \u00e7evrilerek g\u00fcnl\u00fck 30 kWh\u2019l\u0131k enerji kazan\u0131m\u0131 sa\u011flanacak.<\/p>\n<p>\u00dcretilen elektrik kamp\u00fcs i\u00e7i faaliyetlerde, \u00fcretilen \u0131s\u0131 ise tesisi \u0131s\u0131tma amac\u0131yla de\u011ferlendirilecek. Tesisteki prosesler sonucu olu\u015fan at\u0131k su, kurulacak olan yapay sulak alanda ar\u0131t\u0131lacak ve kamp\u00fcs i\u00e7i sulama faaliyetlerinde kullan\u0131lmak \u00fczere sulama suyu da sa\u011flanacak.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.\u0130stanbul Teknik \u00dcniversitesi (\u0130T\u00dc) Bilimsel Ara\u015ft\u0131rma Projeleri Birimi (BAP) ve \u0130stanbul Kalk\u0131nma Ajans\u0131 (\u0130STKA) taraf\u0131ndan desteklenen &#8220;\u0130T\u00dc: S\u00fcrd\u00fcr\u00fclebilir Enerji \u00dcss\u00fc&#8221; isimli proje kapsam\u0131nda [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":74574,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[22893,53],"tags":[6226,2259,640,68,67,1009,37760,870,37761,37762],"views":998,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/74573"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=74573"}],"version-history":[{"count":3,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/74573\/revisions"}],"predecessor-version":[{"id":74577,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/74573\/revisions\/74577"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/74574"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=74573"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=74573"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=74573"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}