{"id":74554,"date":"2018-05-26T18:24:25","date_gmt":"2018-05-26T15:24:25","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=74554"},"modified":"2018-05-26T19:18:21","modified_gmt":"2018-05-26T16:18:21","slug":"gunes-enerjisinden-cati-ve-cephede-enerji-uretimi-artik-cok-daha-ucuz-olacak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/gunes-enerjisinden-cati-ve-cephede-enerji-uretimi-artik-cok-daha-ucuz-olacak\/","title":{"rendered":"(Turkish) G\u00fcne\u015f Enerjisinden \u00c7at\u0131 ve \u00c7ephe\u2019de Enerji \u00dcretimi Art\u0131k \u00c7ok Daha Ucuz Olacak!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/74554\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Mevcutta, 10 kw bir g\u00fcne\u015f paneli sistemi, anahtar teslimi ortalama 15 bin Euro\u2019ya (75 bin TL) mal oluyor. Enerji Bakanl\u0131\u011f\u0131\u2019n\u0131n: proje \u00e7izim ve onay, har\u00e7lar, iletim ve da\u011f\u0131t\u0131m bedelleri, KDV ve di\u011fer maliyetlerde yapaca\u011f\u0131 iyile\u015ftirmeyle 75 bin liral\u0131k tutar\u0131n, 50 bin liraya kadar d\u00fc\u015f\u00fcr\u00fclmesi planlan\u0131yor.<\/strong><\/p>\n<p><strong><img loading=\"lazy\" class=\"alignleft size-medium wp-image-74555\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/05\/gunes-enerjisinden-cati-ve-cephede-300x169.jpg\" alt=\"\" width=\"300\" height=\"169\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/05\/gunes-enerjisinden-cati-ve-cephede-300x169.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/05\/gunes-enerjisinden-cati-ve-cephede-768x432.jpg 768w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/05\/gunes-enerjisinden-cati-ve-cephede-1024x576.jpg 1024w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/05\/gunes-enerjisinden-cati-ve-cephede-500x281.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/05\/gunes-enerjisinden-cati-ve-cephede-80x45.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/05\/gunes-enerjisinden-cati-ve-cephede.jpg 1920w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/strong>Uluslararas\u0131 G\u00fcne\u015f Enerjisi Toplulu\u011fu T\u00fcrkiye B\u00f6l\u00fcm\u00fc (G\u00dcNDER) Genel Sekreteri Faruk Telemcio\u011flu, Gazete Habert\u00fcrk\u2019ten Olcay Aydilek&#8217;e verdi\u011fi yan\u0131tta, Enerji Bakanl\u0131\u011f\u0131\u2019n\u0131n y\u00fcr\u00fctt\u00fc\u011f\u00fc \u00e7al\u0131\u015fman\u0131n yaz sonunda ya da sonbaharda tamamlanmas\u0131n\u0131 beklediklerini ifade ederek, maliyetlerin d\u00fc\u015fmesiyle birlikte \u00e7at\u0131 tipi g\u00fcne\u015f paneli kurma giri\u015fimlerinin de h\u0131zlanaca\u011f\u0131n\u0131 da a\u00e7\u0131klad\u0131.<\/p>\n<p>Telemcio\u011flu, \u201cVatanda\u015f, \u201815 y\u0131ll\u0131k elektrik paran\u0131 pe\u015fin \u00f6de, sistemi kur ve 30 y\u0131l elektrik faturas\u0131 \u00f6deme\u2019 denilirse panel kurmaya yana\u015fmamaktad\u0131r. Fakat, \u20187-8 y\u0131ll\u0131k elektrik paran\u0131 pe\u015fin \u00f6de, 30 y\u0131l fatura \u00f6deme\u2019 denilirse panelini kurar ve elektri\u011fini \u00fcretmeye ba\u015flar\u201d ifadelerini kulland\u0131.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Mevcutta, 10 kw bir g\u00fcne\u015f paneli sistemi, anahtar teslimi ortalama 15 bin Euro\u2019ya (75 bin TL) mal oluyor. Enerji Bakanl\u0131\u011f\u0131\u2019n\u0131n: proje \u00e7izim ve [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":74555,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49],"tags":[24778,37758,37759,67,1009,23416,1876,23133,23131],"views":1045,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/74554"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=74554"}],"version-history":[{"count":3,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/74554\/revisions"}],"predecessor-version":[{"id":74561,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/74554\/revisions\/74561"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/74555"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=74554"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=74554"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=74554"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}