{"id":74511,"date":"2018-05-23T07:30:18","date_gmt":"2018-05-23T04:30:18","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=74511"},"modified":"2018-05-23T07:30:18","modified_gmt":"2018-05-23T04:30:18","slug":"antalya-belediyesinden-ges-kurulumu","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/antalya-belediyesinden-ges-kurulumu\/","title":{"rendered":"(Turkish) Antalya Belediyesi&#8217;nden GES Kurulumu&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/74511\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Antalya B\u00fcy\u00fck\u015fehir Belediyesi taraf\u0131ndan D\u00f6\u015femealt\u0131 \u0130l\u00e7esi, Mellida\u011f B\u00f6lgesi`nde Katranc\u0131 Tepesi Mevkii\u2019nde tahsis edilen 33.051 m2`lik alanda kendi ad\u0131na tapulu <img loading=\"lazy\" class=\"alignleft wp-image-66920 size-medium\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/08\/denizli-yeni-ges-yatirimi-300x200.jpg\" alt=\"antalya-belediyesinden-ges-kurulumu\" width=\"300\" height=\"200\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/08\/denizli-yeni-ges-yatirimi-300x200.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/08\/denizli-yeni-ges-yatirimi-74x50.jpg 74w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/08\/denizli-yeni-ges-yatirimi.jpg 448w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>bulunan 509 Ada, 60 Parsel, F b\u00f6lmesinde 0,96 MWe ve G b\u00f6lmesinde 0,96 MWe olmak \u00fczere toplam 1,92 MWe g\u00fcc\u00fcnde 2 adet (GES) G\u00fcne\u015f Enerjisi Santrali kurulacak.<\/strong><\/p>\n<p>Santrallerde \u00fcretilecek elektrik enerjisi ba\u011flant\u0131s\u0131, TE\u0130A\u015e\u2019a ait 154\/31,5 kV\u2019luk AKORSAN Trafo Merkezinden \u00e7\u0131kan 31,5kV luk Da\u011fbeli sa\u011f-sol fiderinin Da\u011fbeli sol fiderine ba\u011flant\u0131s\u0131, Antalya B\u00fcy\u00fck\u015fehir Belediyesi ad\u0131na kay\u0131tl\u0131 506 ada 83 parsel i\u00e7indeki Da\u011f\u0131t\u0131m Merkezine yap\u0131lacak.<\/p>\n<p>Kurulmas\u0131 planlanan G\u00fcne\u015f Enerjisi Santrali\u2019nin 8 milyon liraya malolmas\u0131 ve in\u015faat a\u015famas\u0131n\u0131n 4 ayda tamamlanmas\u0131 d\u00fc\u015f\u00fcn\u00fcl\u00fcyor. \u0130n\u015faat a\u015famas\u0131nda 14, i\u015fletme a\u015famas\u0131nda ise 1 personelin personel \u00e7al\u0131\u015ft\u0131r\u0131lacakt\u0131r.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Antalya B\u00fcy\u00fck\u015fehir Belediyesi taraf\u0131ndan D\u00f6\u015femealt\u0131 \u0130l\u00e7esi, Mellida\u011f B\u00f6lgesi`nde Katranc\u0131 Tepesi Mevkii\u2019nde tahsis edilen 33.051 m2`lik alanda kendi ad\u0131na tapulu bulunan 509 Ada, 60 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":69293,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49],"tags":[7939,37738,68,67,1009,2326,227,23416,23131],"views":980,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/74511"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=74511"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/74511\/revisions"}],"predecessor-version":[{"id":74512,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/74511\/revisions\/74512"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/69293"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=74511"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=74511"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=74511"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}