{"id":74465,"date":"2018-05-22T04:02:14","date_gmt":"2018-05-22T01:02:14","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=74465"},"modified":"2018-05-22T04:02:14","modified_gmt":"2018-05-22T01:02:14","slug":"brezilyada-ki-ges-enerji-depolamayla-birlikte-hayata-geciyor","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/brezilyada-ki-ges-enerji-depolamayla-birlikte-hayata-geciyor\/","title":{"rendered":"(Turkish) Brezilya\u2019daki GES Enerji Depolamayla Birlikte Hayata Ge\u00e7iyor"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/74465\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>300 MW g\u00fcce sahip g\u00fcne\u015f enerjisi santrali ve 1 MW depolama sisteminden meydana gelen tesis, Grupo Algar ortakl\u0131\u011f\u0131 ile yerel enerji kurulu\u015fu Cemig taraf\u0131ndan yap\u0131ld\u0131. Proje Uberlandia\u2019da, g\u00fcne\u015f ve yenilenebilir enerjinin yo\u011fun bir \u015fekilde yer ald\u0131\u011f\u0131 Minas Gerais eyaletinde yer almaktad\u0131r.<\/strong><\/p>\n<p><img loading=\"lazy\" class=\"alignleft wp-image-67478 size-medium\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/09\/renoenin-ges-projesine-lisans-verildi-300x150.jpg\" alt=\"brezilyada-ki-ges-enerji-depolamayla-birlikte-hayata-geciyor\" width=\"300\" height=\"150\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/09\/renoenin-ges-projesine-lisans-verildi-300x150.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/09\/renoenin-ges-projesine-lisans-verildi-500x250.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/09\/renoenin-ges-projesine-lisans-verildi-80x40.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/09\/renoenin-ges-projesine-lisans-verildi.jpg 640w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>H\u00fck\u00fcmet&#8217;in yapt\u0131\u011f\u0131 a\u00e7\u0131klamaya g\u00f6re, &#8220;Brezilya\u2019n\u0131n enerji reg\u00fclat\u00f6r\u00fc Ag\u00eancia Nacional de Energia El\u00e9trica (Aneel) taraf\u0131ndan y\u00fcr\u00fct\u00fclen bir Ar-Ge program\u0131n\u0131n bir par\u00e7as\u0131 olan proje 22.7 milyon BRL (6.2 milyon $) yat\u0131r\u0131mla birlikte geli\u015ftirildi. CEMIG taraf\u0131ndan 17,5 milyon BRL sa\u011flanm\u0131\u015f, kalan 5.2 milyar BRL ise Alsol taraf\u0131ndan sa\u011flanm\u0131\u015ft\u0131r&#8221; ifadeleri kullan\u0131ld\u0131.<\/p>\n<p>Proje kapsam\u0131nda 300 MW\u2019l\u0131k bir g\u00fcne\u015f enerjisi santral kurulumu, 1 MW\u2019l\u0131k bir depolama sistemiyle yerel \u00fcniversite Universidade Federal da Para\u00edba ve ara\u015ft\u0131rma merkezi Instituto Federal do Rio Grande do Norte taraf\u0131ndan geli\u015ftirilen depolama sistemi prototiplerini kullan\u0131laca\u011f\u0131 belirtiliyor. Bununla beraber proje hakk\u0131nda \u00e7ok daha fazla teknik detay verilmedi.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.300 MW g\u00fcce sahip g\u00fcne\u015f enerjisi santrali ve 1 MW depolama sisteminden meydana gelen tesis, Grupo Algar ortakl\u0131\u011f\u0131 ile yerel enerji kurulu\u015fu Cemig [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":67478,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49],"tags":[1927,37731,67,1009,2326,2569],"views":719,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/74465"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=74465"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/74465\/revisions"}],"predecessor-version":[{"id":74466,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/74465\/revisions\/74466"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/67478"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=74465"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=74465"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=74465"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}