{"id":74258,"date":"2018-05-14T07:04:20","date_gmt":"2018-05-14T04:04:20","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=74258"},"modified":"2018-05-14T07:04:20","modified_gmt":"2018-05-14T04:04:20","slug":"akfen-yenilenebilir-enerjiye-ebrdden-kredi-destegi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/akfen-yenilenebilir-enerjiye-ebrdden-kredi-destegi\/","title":{"rendered":"(Turkish) Akfen Yenilenebilir Enerji&#8217;ye EBRD&#8217;den Kredi Deste\u011fi"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/74258\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Avrupa \u0130mar ve Kalk\u0131nma Bankas\u0131 (EBRD), Akfen Yenilenebilir Enerji&#8217;ye kuraca\u011f\u0131 r\u00fczgar enerjisi santrali i\u00e7in 65 milyon dolara varan kredi sa\u011flayacak.<\/strong><\/p>\n<p><img loading=\"lazy\" class=\"alignleft size-full wp-image-19176\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/12\/ebrd-den-yeni-enerji-stratejisi.jpg\" alt=\"\" width=\"268\" height=\"169\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/12\/ebrd-den-yeni-enerji-stratejisi.jpg 268w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/12\/ebrd-den-yeni-enerji-stratejisi-80x50.jpg 80w\" sizes=\"(max-width: 268px) 100vw, 268px\" \/>Avrupa \u0130mar ve Kalk\u0131nma Bankas\u0131 (EBRD), Akfen Yenilenebilir Enerji&#8217;ye 242 MW b\u00fcy\u00fckl\u00fc\u011f\u00fcndeki r\u00fczgar \u00e7iftli\u011fi projesinin finansman\u0131 i\u00e7in 65 milyon dolara varan uzun vadeli k\u0131demli bor\u00e7 finansman\u0131 sa\u011flayacak.<\/p>\n<p>242 MW b\u00fcy\u00fckl\u00fc\u011f\u00fcndeki proje, \u00c7anakkale&#8217;de 3 ve Denizli&#8217;de 1 r\u00fczgar santrali kurulmas\u0131n\u0131 \u00f6ng\u00f6r\u00fcyor. Proje, T\u00fcrk h\u00fck\u00fcmetinin Yenilenebilir Enerji Kaynaklar\u0131 Destekleme Mekanizmas\u0131 (YEKDEM) \u00e7er\u00e7evesinde geli\u015ftirilecek. Toplam b\u00fcy\u00fckl\u00fc\u011f\u00fc 370 milyon dolar olan proje i\u00e7in 205 milyon dolar kredi de \u0130hracat Kredi Ajans\u0131 (ECA) taraf\u0131ndan verilecek. Bu kredi 4 T\u00fcrk bankas\u0131 taraf\u0131ndan garanti alt\u0131na al\u0131nacak.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Avrupa \u0130mar ve Kalk\u0131nma Bankas\u0131 (EBRD), Akfen Yenilenebilir Enerji&#8217;ye kuraca\u011f\u0131 r\u00fczgar enerjisi santrali i\u00e7in 65 milyon dolara varan kredi sa\u011flayacak. Avrupa \u0130mar ve [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":19176,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,50],"tags":[28245,1259,68,63,67,1009,2712,474,69,24949,231],"views":625,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/74258"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=74258"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/74258\/revisions"}],"predecessor-version":[{"id":74259,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/74258\/revisions\/74259"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/19176"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=74258"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=74258"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=74258"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}