{"id":74113,"date":"2018-05-10T07:26:46","date_gmt":"2018-05-10T04:26:46","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=74113"},"modified":"2018-05-10T07:27:28","modified_gmt":"2018-05-10T04:27:28","slug":"ordu-otobus-terminali-gunesten-kendi-elektrigini-uretecek","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/ordu-otobus-terminali-gunesten-kendi-elektrigini-uretecek\/","title":{"rendered":"(Turkish) Ordu Otob\u00fcs Terminali G\u00fcne\u015f&#8217;ten Kendi Elektri\u011fini \u00dcretecek"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/74113\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Ordu B\u00fcy\u00fck\u015fehir Belediyesi taraf\u0131ndan Alt\u0131nordu il\u00e7esinde, \u00e7evre yolunun kenar\u0131nda yap\u0131m\u0131na ba\u015flanan \u015fehirleraras\u0131 otob\u00fcs terminalinin \u00e7at\u0131s\u0131na g\u00fcne\u015f panelleri entegre edilecek. Yap\u0131lacak olan g\u00fcne\u015f enerjisi santralinin y\u0131ll\u0131k 322 bin kWh elektrik \u00fcretmesi bekleniyor.<\/strong><\/p>\n<p><strong><img loading=\"lazy\" class=\"alignleft size-medium wp-image-74114\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/05\/ordu-otobus-terminali-gunesten-kendi-elektrigini-uretecek-300x200.jpg\" alt=\"\" width=\"300\" height=\"200\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/05\/ordu-otobus-terminali-gunesten-kendi-elektrigini-uretecek.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/05\/ordu-otobus-terminali-gunesten-kendi-elektrigini-uretecek-75x50.jpg 75w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/strong>Ba\u015fkan Enver Y\u0131lmaz, &#8220;Alt\u0131nordu \u015eehirler Aras\u0131 Otob\u00fcs Terminalinde in\u015faat \u00e7al\u0131\u015fmalar\u0131m\u0131z s\u00fcr\u00fcyor. \u015eu an \u00e7al\u0131\u015fmalarda y\u00fczde 25 seviyesine geldik. Trafo binas\u0131 ve giri\u015f kul\u00fcbesinin betonarme imalat\u0131 tamamland\u0131. Terminal 22 bin metrekarelik alan \u00fczerine projelendirildi&#8221; dedi.<\/p>\n<p>Hayata ge\u00e7irilecek proje, standard\u0131 y\u00fcksek g\u00fcne\u015f panelleri sistemiyle y\u0131ll\u0131k tahmini 322 bin kWh elektrik \u00fcretecek. Bu kapsamda g\u00fcne\u015f enerjisi sistemiyle kendi elektri\u011fini \u00fcretecek, \u0131s\u0131 pompas\u0131yla da \u0131s\u0131tma ve so\u011futma sistemini sa\u011flayacak \u00e7evre dostu bir bina olacak.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Ordu B\u00fcy\u00fck\u015fehir Belediyesi taraf\u0131ndan Alt\u0131nordu il\u00e7esinde, \u00e7evre yolunun kenar\u0131nda yap\u0131m\u0131na ba\u015flanan \u015fehirleraras\u0131 otob\u00fcs terminalinin \u00e7at\u0131s\u0131na g\u00fcne\u015f panelleri entegre edilecek. Yap\u0131lacak olan g\u00fcne\u015f enerjisi [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":74114,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49],"tags":[37598,68,67,1009,37599,2326,23416,23133,23131,7162],"views":967,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/74113"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=74113"}],"version-history":[{"count":2,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/74113\/revisions"}],"predecessor-version":[{"id":74116,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/74113\/revisions\/74116"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/74114"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=74113"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=74113"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=74113"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}