{"id":74102,"date":"2018-05-10T07:10:00","date_gmt":"2018-05-10T04:10:00","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=74102"},"modified":"2018-05-10T07:10:00","modified_gmt":"2018-05-10T04:10:00","slug":"rosatom-akkuyuya-yatirimci-cekme-konusunda-aceleci-davranmiyoruz","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/rosatom-akkuyuya-yatirimci-cekme-konusunda-aceleci-davranmiyoruz\/","title":{"rendered":"(Turkish) Rosatom: \u201cAkkuyu\u2019ya Yat\u0131r\u0131mc\u0131 \u00c7ekme Konusunda Aceleci Davranm\u0131yoruz\u201d"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/74102\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Rusya Devlet N\u00fckleer Enerji Kurumu (Rosatom) Ba\u015fkan\u0131 Aleksey Liha\u00e7ev, Akkuyu N\u00fckleer G\u00fc\u00e7 Santrali (NGS) projesine yat\u0131r\u0131mc\u0131 \u00e7ekme konusunda aceleci davranmad\u0131klar\u0131n\u0131 s\u00f6yledi.<\/strong><span id=\"more-99751\"><\/span><\/p>\n<p><img loading=\"lazy\" class=\"alignleft size-medium wp-image-74103\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/05\/rosatom-akkuyuya-yatirimci-cekme-konusunda-aceleci-davranmiyoruz-300x169.jpg\" alt=\"\" width=\"300\" height=\"169\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/05\/rosatom-akkuyuya-yatirimci-cekme-konusunda-aceleci-davranmiyoruz-300x169.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/05\/rosatom-akkuyuya-yatirimci-cekme-konusunda-aceleci-davranmiyoruz-500x282.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/05\/rosatom-akkuyuya-yatirimci-cekme-konusunda-aceleci-davranmiyoruz-80x45.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/05\/rosatom-akkuyuya-yatirimci-cekme-konusunda-aceleci-davranmiyoruz.jpg 696w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>Rus bas\u0131n\u0131na deme\u00e7 veren Rosatom Ba\u015fkan\u0131 Aleksey Liha\u00e7ev\u2019e Akkuyu NGS\u2019de hisse sat\u0131n alacak yat\u0131r\u0131mc\u0131n\u0131n belli olup olmad\u0131\u011f\u0131 soruldu.<\/p>\n<p>Liha\u00e7ev, \u201cBu konuda temaslar\u0131m\u0131z olacak ancak acele etmiyoruz\u201d yan\u0131t\u0131n\u0131 verdi.<\/p>\n<p>Liha\u00e7ev, Akkuyu NGS i\u00e7in bu y\u0131l bir yat\u0131r\u0131mc\u0131 bulacaklar\u0131n\u0131 sanmad\u0131\u011f\u0131n\u0131 s\u00f6zlerine ekledi.<\/p>\n<p>Rosatom ve Cengiz-Kolin-Kalyon konsorsiyumu, haziranda T\u00fcrk \u015firketlerin Akkuyu N\u00fckleer G\u00fc\u00e7 Santrali\u2019nin sermayesine kat\u0131lmas\u0131n\u0131 \u00f6ng\u00f6ren \u00f6n protokol\u00fc imzalam\u0131\u015ft\u0131. Ancak daha sonra \u015firketler projeden \u00e7ekilme karar\u0131 alm\u0131\u015ft\u0131.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Rusya Devlet N\u00fckleer Enerji Kurumu (Rosatom) Ba\u015fkan\u0131 Aleksey Liha\u00e7ev, Akkuyu N\u00fckleer G\u00fc\u00e7 Santrali (NGS) projesine yat\u0131r\u0131mc\u0131 \u00e7ekme konusunda aceleci davranmad\u0131klar\u0131n\u0131 s\u00f6yledi. Rus bas\u0131n\u0131na [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":74103,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,43],"tags":[1466,3019,1303,67,1009,23134,25480,34930,2587,29944],"views":512,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/74102"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=74102"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/74102\/revisions"}],"predecessor-version":[{"id":74104,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/74102\/revisions\/74104"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/74103"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=74102"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=74102"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=74102"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}