{"id":74017,"date":"2018-05-06T08:51:30","date_gmt":"2018-05-06T05:51:30","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=74017"},"modified":"2018-05-06T08:52:58","modified_gmt":"2018-05-06T05:52:58","slug":"dunyanin-ilk-on-line-yuksek-enerji-kapasiteli-kritik-guc-modulu","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/dunyanin-ilk-on-line-yuksek-enerji-kapasiteli-kritik-guc-modulu\/","title":{"rendered":"(Turkish) D\u00fcnyan\u0131n \u0130lk On-line, Y\u00fcksek Enerji Kapasiteli, Kritik G\u00fc\u00e7 Mod\u00fcl\u00fc"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/74017\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Piller CPM &#8211; Critical Power Module<\/strong><\/p>\n<p><strong>G\u00fc\u00e7 elektroni\u011fi alan\u0131nda \u00e7\u0131\u011f\u0131r a\u00e7maya devam eden \u0130nform, yeni nesil teknolojinin \u00fcr\u00fcn\u00fc olan CPM ile Data Center\u2019lar i\u00e7in optimum \u00e7\u00f6z\u00fcm sa\u011fl\u0131yor. CPM ile \u0130nform, beyaz alanlar i\u00e7in g\u00fcvenilir bir tasar\u0131mla maksimum verimlilik sa\u011flayarak minimize edilmi\u015f yat\u0131r\u0131m\u0131 garantiliyor.<img loading=\"lazy\" class=\"alignright size-medium wp-image-74018\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/05\/dunyanin-ilk-on-line-yuksek-enerji-kapasiteli-kritik-guc-modulu-300x200.jpg\" alt=\"\" width=\"300\" height=\"200\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/05\/dunyanin-ilk-on-line-yuksek-enerji-kapasiteli-kritik-guc-modulu-300x200.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/05\/dunyanin-ilk-on-line-yuksek-enerji-kapasiteli-kritik-guc-modulu-500x333.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/05\/dunyanin-ilk-on-line-yuksek-enerji-kapasiteli-kritik-guc-modulu-75x50.jpg 75w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/05\/dunyanin-ilk-on-line-yuksek-enerji-kapasiteli-kritik-guc-modulu.jpg 732w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/strong><\/p>\n<p>T\u00fcrkiye UPS sekt\u00f6r\u00fcnde yeniliklere her zaman \u00f6nc\u00fcl\u00fck eden firma olma \u00f6zelli\u011fiyle sekt\u00f6rdeki g\u00fcc\u00fcn\u00fc kan\u0131tlayan <strong>\u0130nform<\/strong>, yirmi y\u0131l\u0131 a\u015fk\u0131n s\u00fcredir birlikteli\u011fine devam etti\u011fi d\u00fcnya devi Piller\u2019in devrim yaratan yeni \u00fcr\u00fcn\u00fc CPM ile sekt\u00f6rde oyunun kurallar\u0131n\u0131 de\u011fi\u015ftiriyor.<\/p>\n<p><strong>D\u00fcnyan\u0131n ilk on-line, y\u00fcksek enerji kapasiteli, kritik g\u00fc\u00e7 mod\u00fcl\u00fc<\/strong><\/p>\n<p>300 \u2013 360kw\u2019l\u0131k mod\u00fclleri ve farkl\u0131 \u00e7al\u0131\u015fma modlar\u0131yla y\u00fczde 99\u2019lara \u00e7\u0131kan pazar\u0131n en y\u00fcksek verimlili\u011fini sa\u011flayan CPM, kritik y\u00fckler i\u00e7in g\u00fcvenilir, temiz ve kesintisiz enerji sa\u011fl\u0131yor. Minumum y\u00fczeydeki maksimum g\u00fc\u00e7 yo\u011funlu\u011fu ile maliyet tasarrufu sa\u011flayan CPM, kullan\u0131m s\u00fcreklili\u011fi, rakipsiz i\u015fletim verimlili\u011fi ile minimize edilmi\u015f CAPEX ve OPEX\u2019i garantiliyor. CPM, d\u00fc\u015f\u00fck giri\u015f gerilimlerine g\u00f6re tasarlanm\u0131\u015f kinetik deponun i\u00e7erisinde kendinden so\u011futmal\u0131 yeni nesil 3-Level IGBT double-conversion teknolojisi ve \u2018Self-Learning\u2019 algoritmas\u0131 ile beyaz alanlar i\u00e7in m\u00fckemmel \u00e7\u00f6z\u00fcmler sunuyor.<\/p>\n<p>CPM, 50\u00b0C gibi y\u00fcksek s\u0131cakl\u0131klarda \u00e7al\u0131\u015fabilmesiyle de esneklik sa\u011flayarak en yeni teknolojilerle performans ve g\u00fcvenli\u011fi art\u0131r\u0131rken enerji kalitesi sorunlar\u0131na kar\u015f\u0131 m\u00fckemmel koruma sunuyor. Buna ek olarak, modern dizel jenerat\u00f6rler ideal g\u00fc\u00e7 koruma ve performans kombinasyonunu sa\u011flayan kinetik depolanm\u0131\u015f enerji sistemlerine uygunlu\u011fuyla CPM, Android veya iOS uygulamalar\u0131na uygunlu\u011fuyla acil ve mobil olarak d\u00fcnyan\u0131n neresinde olursa sistem durum raporlar\u0131n\u0131 yetkili personele ileterek maximum g\u00fcvenlik sa\u011fl\u0131yor.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Piller CPM &#8211; Critical Power Module G\u00fc\u00e7 elektroni\u011fi alan\u0131nda \u00e7\u0131\u011f\u0131r a\u00e7maya devam eden \u0130nform, yeni nesil teknolojinin \u00fcr\u00fcn\u00fc olan CPM ile Data Center\u2019lar [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":74018,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,52],"tags":[37570,34979,67,1009,18366,37571,35401],"views":797,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/74017"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=74017"}],"version-history":[{"count":2,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/74017\/revisions"}],"predecessor-version":[{"id":74020,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/74017\/revisions\/74020"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/74018"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=74017"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=74017"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=74017"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}