{"id":73927,"date":"2018-05-03T07:33:19","date_gmt":"2018-05-03T04:33:19","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=73927"},"modified":"2018-05-03T07:39:18","modified_gmt":"2018-05-03T04:39:18","slug":"cinde-ges-kurulumu-2018in-ilk-ceyreginde-yuzde-22-artis-gosterdi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/cinde-ges-kurulumu-2018in-ilk-ceyreginde-yuzde-22-artis-gosterdi\/","title":{"rendered":"(Turkish) \u00c7in\u2019de Ges Kurulumu, 2018\u2019in \u0130lk \u00c7eyre\u011finde % 22 Art\u0131\u015f G\u00f6sterdi"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/73927\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>\u00c7in Ulusal Enerji \u0130daresi\u2019ne (NEA) g\u00f6re, \u00c7in, 2018\u2019in ilk \u00e7eyre\u011finde toplam 9.65GW\u2019l\u0131k g\u00fcne\u015f enerjisi santrali kurarak, ge\u00e7en y\u0131l\u0131n ayn\u0131 tarihine g\u00f6re kurulumunu %22 artt\u0131rd\u0131.<\/strong><\/p>\n<p><strong><img loading=\"lazy\" class=\"wp-image-73928 size-medium alignleft\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/05\/cin-gunes-enerjisi-640x320-300x150.jpg\" alt=\"\" width=\"300\" height=\"150\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/05\/cin-gunes-enerjisi-640x320-300x150.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/05\/cin-gunes-enerjisi-640x320-500x250.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/05\/cin-gunes-enerjisi-640x320-80x40.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/05\/cin-gunes-enerjisi-640x320.jpg 640w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/strong>Asya Avrupa Temiz Enerji Dan\u0131\u015fmanl\u0131\u011f\u0131 (Asia Europe Clean Energy, AECEA), daha \u00f6nce 2018\u2019in ilk \u00e7eyre\u011finde \u00c7in\u2019de yakla\u015f\u0131k 7.5GW kurulum yapmay\u0131 tahmin etmi\u015fti.<\/p>\n<p>AECEA, Q1 2018 kurulumlar\u0131ndaki art\u0131\u015fa ra\u011fmen, \u00c7in\u2019de 2017 y\u0131l\u0131nda toplam kurulumun 53,5 GW oldu\u011funu ve buna istinaden 2018 y\u0131l\u0131nda toplam kurulumun 40GW- 45GW aral\u0131\u011f\u0131nda kalarak d\u00fc\u015f\u00fc\u015f ya\u015fayaca\u011f\u0131n\u0131 tahmin ediyorlar.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.\u00c7in Ulusal Enerji \u0130daresi\u2019ne (NEA) g\u00f6re, \u00c7in, 2018\u2019in ilk \u00e7eyre\u011finde toplam 9.65GW\u2019l\u0131k g\u00fcne\u015f enerjisi santrali kurarak, ge\u00e7en y\u0131l\u0131n ayn\u0131 tarihine g\u00f6re kurulumunu %22 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":73928,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49],"tags":[37536,67,1009,23416,23133],"views":540,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/73927"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=73927"}],"version-history":[{"count":2,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/73927\/revisions"}],"predecessor-version":[{"id":73935,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/73927\/revisions\/73935"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/73928"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=73927"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=73927"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=73927"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}