{"id":73888,"date":"2018-05-02T08:14:53","date_gmt":"2018-05-02T05:14:53","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=73888"},"modified":"2018-05-02T08:14:53","modified_gmt":"2018-05-02T05:14:53","slug":"politik-catisma-suudi-arabistanin-gunes-enerjisi-projesine-golge-dusurdu","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/politik-catisma-suudi-arabistanin-gunes-enerjisi-projesine-golge-dusurdu\/","title":{"rendered":"(Turkish) Politik \u00c7at\u0131\u015fma Suudi Arabistan\u2019\u0131n G\u00fcne\u015f Enerjisi Projesine G\u00f6lge D\u00fc\u015f\u00fcrd\u00fc"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/73888\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Daha \u00f6nce Suudi Arabistan\u2019\u0131n Japon SoftBank ile 200 milyar dolarl\u0131k bir anla\u015fma imzaland\u0131\u011f\u0131ndan bahsetmi\u015ftik. Velihat Prensi Muhammed Bin Salman\u2019\u0131n y\u00f6netimi alt\u0131nda olan Suudi Arabistan\u2019\u0131n, tamamland\u0131\u011f\u0131nda d\u00fcnyan\u0131n en b\u00fcy\u00fck \u00f6rne\u011fini olu\u015fturacak bir g\u00fcne\u015f enerjisi projesine ev sahibi olmas\u0131 bekleniyor. <\/strong><\/p>\n<p>Ancak \u00fclkenin en g\u00fc\u00e7l\u00fc iki organ\u0131 olan Enerji Bakanl\u0131\u011f\u0131 ve Devlet Fonu aras\u0131nda g\u00f6zlemlenen s\u00fcrt\u00fc\u015fmelerin, \u00fclkenin ekonomisini canland\u0131rmak i\u00e7in yap\u0131lan bu giri\u015fimleri aksatma riski ta\u015f\u0131d\u0131\u011f\u0131n\u0131 <img loading=\"lazy\" class=\"alignleft wp-image-68940 size-medium\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/11\/gunes-santrali-danismanligi-hizmetlerinde-tercih-ozbilgin-enerji-300x169.jpg\" alt=\"politik-catisma-suudi-arabistanin-gunes-enerjisi-projesine-golge-dusurdu\" width=\"300\" height=\"169\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/11\/gunes-santrali-danismanligi-hizmetlerinde-tercih-ozbilgin-enerji-300x169.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/11\/gunes-santrali-danismanligi-hizmetlerinde-tercih-ozbilgin-enerji-768x432.jpg 768w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/11\/gunes-santrali-danismanligi-hizmetlerinde-tercih-ozbilgin-enerji-500x281.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/11\/gunes-santrali-danismanligi-hizmetlerinde-tercih-ozbilgin-enerji-80x45.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/11\/gunes-santrali-danismanligi-hizmetlerinde-tercih-ozbilgin-enerji.jpg 994w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>g\u00f6stermekte. Yenilenebilir enerji kaynaklar\u0131, Veliaht Prensi Muhammed\u2019in ekonomik reformlar\u0131n\u0131n kilit noktas\u0131n\u0131 olu\u015fturuyor. 200 gigawatt\u2019l\u0131k \u00fcretim kapasitesi ile \u00fclkenin elektrik ihtiyac\u0131n\u0131n d\u00f6rt kat\u0131na denk gelen, ayn\u0131 zamanda 150 milyon evin elektrik ihtiyac\u0131n\u0131 kar\u015f\u0131layabilecek olan proje, Veliaht Prensi Muhammed ve SoftBank CEO\u2019su Masayoshi Son\u2019un New York\u2019ta imzalad\u0131klar\u0131 anla\u015fma sonras\u0131nda a\u00e7\u0131klanm\u0131\u015ft\u0131. Ancak krall\u0131\u011f\u0131n milyarlarca dolarl\u0131k yenilenebilir stratejisini y\u00f6netmekte olan Enerji Bakanl\u0131\u011f\u0131\u2019n\u0131n ge\u00e7en ay yap\u0131lan duyurusunun \u00f6ncesinde konu hakk\u0131nda hi\u00e7bir bilgisi olmad\u0131\u011f\u0131 bas\u0131na s\u0131zan haberler aras\u0131ndad\u0131r.<\/p>\n<p>Bu durumun, Enerji Bakan\u0131 Khalid Al Falih ve Kamu Yat\u0131r\u0131m Fonu Ba\u015fkan\u0131 Yasir al-Rumayyan aras\u0131nda ya\u015fanan bir n\u00fcfus m\u00fccadelesi oldu\u011fu da iddialar aras\u0131nda. Bu proje giri\u015fimi, Enerji Bakanl\u0131\u011f\u0131 i\u00e7indeki yenilenebilir projelerin geli\u015ftirilmesinden sorumlu birim yerine, projede yat\u0131r\u0131mc\u0131 olarak bulunan ve halihaz\u0131rda SoftBank ile i\u015fbirli\u011fi i\u00e7inde olan Kamu Yat\u0131r\u0131m Fonu taraf\u0131ndan geli\u015ftirilmi\u015ftir. Yerel kaynaklar, projenin Rumayyan\u2019\u0131n ABD ziyareti s\u0131ras\u0131nda tarihi bir anla\u015fma imzalayarak Falih\u2019i safd\u0131\u015f\u0131 edecek bir g\u00fc\u00e7 oyunu oldu\u011funa inanmakta. Prens Muhammed\u2019in y\u00fcksek profilli yat\u0131r\u0131mlar yoluyla reformlar\u0131n\u0131 y\u00fcr\u00fctmek i\u00e7in kulland\u0131\u011f\u0131 Kamu Yat\u0131r\u0131m Fonu\u2019nun \u00fclkedeki n\u00fcfusu artmaya devam etmekte. Mali getirisinin daha y\u00fcksek olaca\u011f\u0131 ve \u00e7e\u015fitlendirme \u00e7abalar\u0131na destek olabilece\u011fi beklentisi ile petrolden elde edilen k\u00e2r\u0131n da art\u0131k Merkez Bankas\u0131 yerine bu fona iletilmesi bekleniyor. \u0130mzalanan g\u00fcne\u015f enerjisi anla\u015fmas\u0131, fonun \u00fclkedeki yerle\u015fik g\u00fc\u00e7 merkezlerinden kontrol\u00fc yava\u015f yava\u015f kendine \u00e7ekti\u011fini i\u015faret ediyor.<\/p>\n<p><a href=\"https:\/\/www.ft.com\/content\/7cf9f20a-3f40-11e8-b7e0-52972418fec4\"><em>Financial Times<\/em><\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Daha \u00f6nce Suudi Arabistan\u2019\u0131n Japon SoftBank ile 200 milyar dolarl\u0131k bir anla\u015fma imzaland\u0131\u011f\u0131ndan bahsetmi\u015ftik. Velihat Prensi Muhammed Bin Salman\u2019\u0131n y\u00f6netimi alt\u0131nda olan Suudi [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":68940,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49],"tags":[67,1009,23416,23131,37321,37530,1463],"views":489,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/73888"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=73888"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/73888\/revisions"}],"predecessor-version":[{"id":73889,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/73888\/revisions\/73889"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/68940"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=73888"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=73888"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=73888"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}