{"id":73714,"date":"2018-04-26T07:56:02","date_gmt":"2018-04-26T04:56:02","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=73714"},"modified":"2018-04-26T07:56:02","modified_gmt":"2018-04-26T04:56:02","slug":"yuvacik-res-projesi-ced-toplantisi-halkin-katilimiyla-gerceklesti","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/yuvacik-res-projesi-ced-toplantisi-halkin-katilimiyla-gerceklesti\/","title":{"rendered":"(Turkish) Yuvac\u0131k Res Projesi \u00c7ed Toplant\u0131s\u0131 Halk\u0131n Kat\u0131l\u0131m\u0131yla Ger\u00e7ekle\u015fti"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/73714\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>T\u00fcrkiye Elektrik \u0130letim A.\u015e (TE\u0130A\u015e), 154kV Yuvac\u0131k RES TM-\u0130znik TM Elektrik \u0130letim Hatt\u0131 projesinin \u00c7evresel Etki De\u011ferlendirme (\u00c7ED) s\u00fcreci toplant\u0131s\u0131, \u0130znik\u2019in Hac\u0131osman K\u00f6y\u00fc\u2019nde halk\u0131n kat\u0131l\u0131m\u0131yla ger\u00e7ekle\u015fti. Toplant\u0131, proje sahibi TE\u0130A\u015e 2. B\u00f6lge M\u00fcd\u00fcrl\u00fc\u011f\u00fc yetkilileri ve Bursa \u00c7evre \u015eehircilik \u0130l M\u00fcd\u00fcrl\u00fc\u011f\u00fc yetkilileri ba\u015fkanl\u0131\u011f\u0131nda yap\u0131ld\u0131.<\/strong><\/p>\n<p>154 KV Yuvac\u0131k RES TM \u2013 \u0130znik TM Elektrik Enerjisi \u0130letim Hatt\u0131 projesinin, \u0130znik \u0130l\u00e7esi\u2019nin Kutluca, Hac\u0131osman, G\u00fcrm\u00fczl\u00fc, Candarl\u0131, Hisardere mahalleleri s\u0131n\u0131rlar\u0131 i\u00e7erisinde yap\u0131lmas\u0131 planlanmakta oldu\u011fu belirtildi. B\u00f6lge halk\u0131n\u0131n s\u0131cak bakt\u0131\u011f\u0131 yat\u0131r\u0131mda, Yuva Enerji Yat\u0131r\u0131m \u00dcretim ve Ticaret Anonim <img loading=\"lazy\" class=\"alignleft size-medium wp-image-73715\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/04\/yuvacik-res-projesi-ced-toplantisi-halkin-katilimiyla-gerceklesti-300x200.jpg\" alt=\"\" width=\"300\" height=\"200\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/04\/yuvacik-res-projesi-ced-toplantisi-halkin-katilimiyla-gerceklesti.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/04\/yuvacik-res-projesi-ced-toplantisi-halkin-katilimiyla-gerceklesti-75x50.jpg 75w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>\u015eirketi, Yuvac\u0131k RES Santralinin yap\u0131m\u0131n\u0131 tamamlad\u0131ktan sonra y\u00f6redeki t\u00fcm halka enerji konusunda e\u011fitim verip, i\u015f i\u00e7in uzak \u015fehirlere gitmek zorunda kalan gen\u00e7lere de istihdam sa\u011flayacak. \u00d6zellikle \u00e7ocuklara y\u00f6nelik okul yat\u0131r\u0131m\u0131 da yaparak e\u011fitimlerine destek verecek.<\/p>\n<p>Yuvac\u0131k R\u00fczgar Enerji Santrali\u2019nden elde edilecek elektrik enerjisi, elektrik enerjisi iletim hatlar\u0131 ile \u0130znik Trafo Merkezi (TM)\u2019ne iletilecek. Hat, 154 kV geriliminde olup, fider \u00e7\u0131k\u0131\u015f\u0131ndan itibaren in\u015fa edilecek 17,3 km uzunlu\u011fundaki hat, kompakt direkli tek devre 1272 MCM iletken ile yap\u0131lacak.<\/p>\n<p>Proje g\u00fczergah\u0131, Elektrik Kuvvetli Ak\u0131m Tesisleri Y\u00f6netmeli\u011fi h\u00fck\u00fcmleri dikkate al\u0131narak belirlenmi\u015f. Ayr\u0131ca projenin TE\u0130A\u015e Et\u00fct Proje Teknik \u015eartnamesi esas al\u0131narak haz\u0131rland\u0131\u011f\u0131 s\u00f6ylendi. G\u00fczergah orman ve \u015fah\u0131s arazisi vasf\u0131nda bulunan alanlardan ge\u00e7mekte. Bu do\u011frultuda, ormanl\u0131k alanda bulunan direk yeri ve iletken ge\u00e7i\u015fi i\u00e7in orman izni, \u015fah\u0131s m\u00fclkiyetinde bulunan direk yerleri i\u00e7in kamula\u015ft\u0131rma ve \u015fah\u0131s m\u00fclkiyetinde bulunan iletken ge\u00e7i\u015fleri i\u00e7in irtifak hakk\u0131 tesis edilecek.<\/p>\n<p>Proje kapsam\u0131nda Havai Elektrik Enerjisi \u0130letim Hatt\u0131n\u0131n da tesis edilece\u011fi vurguland\u0131. Projenin in\u015faat \u00e7al\u0131\u015fmalar\u0131n\u0131n, 6 ayda tamamlanmas\u0131 planlanmakta. S\u00f6z konusu Elektrik Enerjisi \u0130letim Hatt\u0131 g\u00fczerg\u00e2h\u0131 planlan\u0131rken, Elektrik Kuvvetli Ak\u0131m Tesisleri Y\u00f6netmeli\u011fi h\u00fck\u00fcmleri dikkate al\u0131narak ve gerekli etki mesafesi b\u0131rak\u0131lm\u0131\u015f.Bu anlamda, toplant\u0131da yerle\u015fim yerlerinden g\u00fcvenli b\u0131rak\u0131lan bu mesafelerle y\u00f6re halk\u0131 sa\u011fl\u0131k y\u00f6n\u00fcnden etkilemeyece\u011fi \u00f6nemle belirtildi<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.T\u00fcrkiye Elektrik \u0130letim A.\u015e (TE\u0130A\u015e), 154kV Yuvac\u0131k RES TM-\u0130znik TM Elektrik \u0130letim Hatt\u0131 projesinin \u00c7evresel Etki De\u011ferlendirme (\u00c7ED) s\u00fcreci toplant\u0131s\u0131, \u0130znik\u2019in Hac\u0131osman K\u00f6y\u00fc\u2019nde [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":73715,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,50],"tags":[37466,67,1009,474,35002,24949,231,35901],"views":703,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/73714"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=73714"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/73714\/revisions"}],"predecessor-version":[{"id":73716,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/73714\/revisions\/73716"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/73715"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=73714"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=73714"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=73714"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}