{"id":73630,"date":"2018-04-23T18:26:15","date_gmt":"2018-04-23T15:26:15","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=73630"},"modified":"2018-04-23T18:26:15","modified_gmt":"2018-04-23T15:26:15","slug":"japonyada-en-buyuk-yuzer-gunes-santrali-ges-elektrik-uretimine-gecti","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/japonyada-en-buyuk-yuzer-gunes-santrali-ges-elektrik-uretimine-gecti\/","title":{"rendered":"(Turkish) Japonya\u2019da En B\u00fcy\u00fck Y\u00fczer G\u00fcne\u015f Santrali ( GES ) Elektrik \u00dcretimine Ge\u00e7ti"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/73630\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Japonya&#8217;da yer alan 15mw g\u00fcc\u00fcnde en b\u00fcy\u00fck y\u00fczen g\u00fcne\u015f enerjisi santrali\u00a0Kyocera TCL Solar \u015firketi taraf\u0131ndan faaliyete ge\u00e7irildi.<img loading=\"lazy\" class=\"alignright wp-image-63437 size-medium\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/04\/burdur-gesi-al-abound-holding-satin-aldi-300x190.jpg\" alt=\"japonyada-en-buyuk-yuzer-gunes-santrali-elektrik-uretmeye-basladi\" width=\"300\" height=\"190\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/04\/burdur-gesi-al-abound-holding-satin-aldi-300x190.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/04\/burdur-gesi-al-abound-holding-satin-aldi-500x317.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/04\/burdur-gesi-al-abound-holding-satin-aldi-80x50.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/04\/burdur-gesi-al-abound-holding-satin-aldi.jpg 900w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/strong><\/p>\n<p>180.000 m2&#8217;lik su rezervuar\u0131 alan\u0131 \u00fczerinde yer alan ges, y\u0131lda yakla\u015f\u0131k 16.170 megavat saat (MWh) elektrik \u00fcretimi ger\u00e7ekle\u015ftirerek 4.970 hanenin elektrik ihtiyac\u0131n\u0131 kar\u015f\u0131lam\u0131\u015f olacak.<\/p>\n<p>Kyocera GES\u2019&#8217;in 13,7 MW b\u00fcy\u00fckl\u00fc\u011f\u00fcnde olan k\u0131sm\u0131 Kyocera taraf\u0131ndan Yamakura Baraj\u0131 \u00fcst\u00fcnde yap\u0131ld\u0131.<\/p>\n<p>&nbsp;<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Japonya&#8217;da yer alan 15mw g\u00fcc\u00fcnde en b\u00fcy\u00fck y\u00fczen g\u00fcne\u015f enerjisi santrali\u00a0Kyocera TCL Solar \u015firketi taraf\u0131ndan faaliyete ge\u00e7irildi. 180.000 m2&#8217;lik su rezervuar\u0131 alan\u0131 \u00fczerinde [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":63437,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49],"tags":[68,67,1009,2326,23416,2569,23133,23131,1547,37443,37442],"views":1316,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/73630"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=73630"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/73630\/revisions"}],"predecessor-version":[{"id":73631,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/73630\/revisions\/73631"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/63437"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=73630"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=73630"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=73630"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}