{"id":73481,"date":"2018-04-19T11:35:42","date_gmt":"2018-04-19T08:35:42","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=73481"},"modified":"2018-04-19T11:37:50","modified_gmt":"2018-04-19T08:37:50","slug":"otomotiv-devi-bentleyden-fabrika-catisina-ges-gunes-enerjisi-santrali","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/otomotiv-devi-bentleyden-fabrika-catisina-ges-gunes-enerjisi-santrali\/","title":{"rendered":"(Turkish) Otomotiv Devi Bentley&#8217;den Fabrika \u00c7at\u0131s\u0131na Ges (G\u00fcne\u015f Enerjisi Santrali)"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/73481\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Bentley, \u0130ngiltere\u2019nin en b\u00fcy\u00fck g\u00fcne\u015f enerjisi santrallerinden birisini \u0130ngiltere\u2019nin kuzeyindeki Crewe kentinde bulunan fabrikas\u0131na kuruyor. Bentley\u2019in a\u00e7\u0131klamas\u0131na g\u00f6re 10.000 adet panelden olu\u015fan g\u00fcne\u015f santralinin in\u015faat\u0131na ba\u015flanma a\u015famas\u0131nda&#8230;<\/strong><\/p>\n<p><img loading=\"lazy\" class=\"alignleft wp-image-38886 size-medium\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/05\/gunes-enerjisi-elektrik-uretim-sisteminin-tasarlanmasi-ve-maliyet-hesabi-300x184.jpg\" alt=\"otomotiv-devi-bentleyden-fabrika-catisina-ges-gunes-enerjisi-santrali\" width=\"300\" height=\"184\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/05\/gunes-enerjisi-elektrik-uretim-sisteminin-tasarlanmasi-ve-maliyet-hesabi-300x184.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/05\/gunes-enerjisi-elektrik-uretim-sisteminin-tasarlanmasi-ve-maliyet-hesabi-500x306.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/05\/gunes-enerjisi-elektrik-uretim-sisteminin-tasarlanmasi-ve-maliyet-hesabi-80x50.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/05\/gunes-enerjisi-elektrik-uretim-sisteminin-tasarlanmasi-ve-maliyet-hesabi.jpg 978w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>Bitti\u011finde 1.378 adet otomobile ev sahipli\u011fi yapabilen bu tesise enerji verecek. T\u00fcm bu panellerin fabrikaya 2.7 MW\u2019l\u0131k bir enerji sa\u011flayaca\u011f\u0131 belirtiliyor. Bu do\u011frultuda Bentley\u2019in t\u00fcm enerji t\u00fcketiminin \u00e7eyre\u011fi \u00c7at\u0131s\u0131na kurdu\u011fu G\u00fcne\u015f Enerji Santralinden kar\u015f\u0131lanacak.<\/p>\n<p>G\u00fcne\u015f Enerji Santralinin 6 ay i\u00e7inde tamamlanarak devreye al\u0131nmas\u0131 \u00f6ng\u00f6r\u00fclmektedir. Bentley daha \u00f6ncede 2013 y\u0131l\u0131nda fabrikas\u0131n\u0131n \u00fczerine 20.815 adet g\u00fcne\u015f panelinden olu\u015fan bir \u00e7at\u0131 in\u015fas\u0131 yapm\u0131\u015ft\u0131. Bu \u00f6nceki sistem ile yeni sistem birle\u015fti\u011fi zaman Bentley\u2019in toplam enerji ihtiyac\u0131n\u0131n yakla\u015f\u0131k 3\u2019te 2\u2019si kar\u015f\u0131lanm\u0131\u015f olacak. Bu da 1750 adet evin enerjisi ile ayn\u0131 miktara kar\u015f\u0131l\u0131k gelmektedir.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Bentley, \u0130ngiltere\u2019nin en b\u00fcy\u00fck g\u00fcne\u015f enerjisi santrallerinden birisini \u0130ngiltere\u2019nin kuzeyindeki Crewe kentinde bulunan fabrikas\u0131na kuruyor. Bentley\u2019in a\u00e7\u0131klamas\u0131na g\u00f6re 10.000 adet panelden olu\u015fan g\u00fcne\u015f [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":38886,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49],"tags":[37401,67,1009,23311,23416,2569,1353,23133,23131],"views":1028,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/73481"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=73481"}],"version-history":[{"count":3,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/73481\/revisions"}],"predecessor-version":[{"id":73486,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/73481\/revisions\/73486"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/38886"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=73481"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=73481"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=73481"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}