{"id":73370,"date":"2018-04-16T13:07:34","date_gmt":"2018-04-16T10:07:34","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=73370"},"modified":"2018-04-16T13:07:34","modified_gmt":"2018-04-16T10:07:34","slug":"gunesten-elektrik-uretim-kapasitesi-ilk-defa-nukleeri-gececek","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/gunesten-elektrik-uretim-kapasitesi-ilk-defa-nukleeri-gececek\/","title":{"rendered":"(Turkish) G\u00fcne\u015f&#8217;ten Elektrik \u00dcretim Kapasitesi \u0130lk Defa N\u00fckleeri Ge\u00e7ecek"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/73370\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>G\u00fcne\u015f enerjisi \u00fczerine ara\u015ft\u0131rmalar y\u00fcr\u00fcten GTM Research, d\u00fcnya \u00e7ap\u0131nda g\u00fcne\u015f \u0131\u015f\u0131\u011f\u0131ndan elektrik \u00fcreten g\u00fcne\u015f panallerinin \u00fcretim kapasitesinin \u00f6n\u00fcm\u00fczdeki aylarda ilk defa n\u00fckleer santrallar\u0131n kapasitelerini ge\u00e7ece\u011fini a\u00e7\u0131klad\u0131.\u00a0<span id=\"more-93237\"><\/span>\u0130ngiltere\u2019de yay\u0131nlanan i gazetesinin haberine g\u00f6re 2017 sonunda d\u00fcnyadaki g\u00fcne\u015f paneli sistemlerin kapasitesi<img loading=\"lazy\" class=\"alignright wp-image-71222 size-medium\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/01\/cinli-trina-solar-abd-gunes-paneli-gumruk-vergisine-tepki-gosterdi-300x150.jpg\" alt=\"gunesten-elektrik-uretim-kapasitesi-ilk-defa-nukleeri-gececek\" width=\"300\" height=\"150\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/01\/cinli-trina-solar-abd-gunes-paneli-gumruk-vergisine-tepki-gosterdi-300x150.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/01\/cinli-trina-solar-abd-gunes-paneli-gumruk-vergisine-tepki-gosterdi-500x250.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/01\/cinli-trina-solar-abd-gunes-paneli-gumruk-vergisine-tepki-gosterdi-80x40.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/01\/cinli-trina-solar-abd-gunes-paneli-gumruk-vergisine-tepki-gosterdi.jpg 600w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/> 391,5 gigawatta ula\u015farak 390 gigawatt elektrik \u00fcretme kapasitesi olan n\u00fckleer santrallar\u0131 geride b\u0131rakacak.<\/strong><\/p>\n<p>Fakat g\u00fcne\u015f \u0131\u015f\u0131\u011f\u0131ndan \u00fcretilen elektri\u011fin n\u00fckleer santrallardan \u00fcretilen elektri\u011fi ge\u00e7mesine daha \u00e7ok var. D\u00fcnyadaki n\u00fckleer santrallar saatte ortalama 2,5 milyon gigawatt elektrik \u00fcretirken bu miktar g\u00fcne\u015f enerjisinde 375 bin gigawatt. Aradaki fark\u0131n nedeni, g\u00fcne\u015f enerjisi \u00fcreten sistemlerin, \u00fcretim kapasiteleri daha fazla olsa bile hava kapal\u0131yken ve geceleri elektrik \u00fcretememesi.<\/p>\n<p>GTM Research\u2019ten Stephen Lacey, bu y\u0131l elektrik \u00fcretimine eklenmesi beklenen 81 gigawattl\u0131k g\u00fcne\u015f panelinin kapasitesinin 81 gigawatt oldu\u011funu, bunun 2014\u2019te faaliyete ge\u00e7en sistemlerin 2 kat\u0131, 10 y\u0131l \u00f6nce faaliyete ge\u00e7enlerin ise 32 kat\u0131 oldu\u011funu s\u00f6yledi<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.G\u00fcne\u015f enerjisi \u00fczerine ara\u015ft\u0131rmalar y\u00fcr\u00fcten GTM Research, d\u00fcnya \u00e7ap\u0131nda g\u00fcne\u015f \u0131\u015f\u0131\u011f\u0131ndan elektrik \u00fcreten g\u00fcne\u015f panallerinin \u00fcretim kapasitesinin \u00f6n\u00fcm\u00fczdeki aylarda ilk defa n\u00fckleer santrallar\u0131n [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":71222,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49,43],"tags":[4996,67,1009,2008,13,23416,108,21,23134,1597],"views":634,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/73370"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=73370"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/73370\/revisions"}],"predecessor-version":[{"id":73371,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/73370\/revisions\/73371"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/71222"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=73370"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=73370"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=73370"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}