{"id":73275,"date":"2018-04-13T15:08:42","date_gmt":"2018-04-13T12:08:42","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=73275"},"modified":"2018-04-13T15:08:42","modified_gmt":"2018-04-13T12:08:42","slug":"finlandiyadan-kuzey-akim-2-projesine-onay","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/finlandiyadan-kuzey-akim-2-projesine-onay\/","title":{"rendered":"(Turkish) Finlandiya&#8217;dan Kuzey Ak\u0131m-2 Projesine Onay"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/73275\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Finlandiya y\u00f6netimi, toplam uzunlu\u011fu 1200 km\u2019nin \u00fczerinde olacak olan Kuzey Ak\u0131m-2 boru hatt\u0131n\u0131n Finlandiya topraklar\u0131ndan ge\u00e7ecek 374 kilometrelik k\u0131sm\u0131n\u0131n ayr\u0131nt\u0131l\u0131 yap\u0131m ve i\u015fletme plan\u0131n\u0131 onaylad\u0131.<\/strong><\/p>\n<p><span id=\"more-99351\"><img loading=\"lazy\" class=\"alignleft size-medium wp-image-73276\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/04\/finlandiyadan-kuzey-akim-2-projesine-onay-300x195.jpg\" alt=\"\" width=\"300\" height=\"195\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/04\/finlandiyadan-kuzey-akim-2-projesine-onay-300x195.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/04\/finlandiyadan-kuzey-akim-2-projesine-onay-500x325.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/04\/finlandiyadan-kuzey-akim-2-projesine-onay-77x50.jpg 77w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/04\/finlandiyadan-kuzey-akim-2-projesine-onay.jpg 696w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/span>Finlandiya, m\u00fcnhas\u0131r ekonomik b\u00f6lgesinde Kuzey Ak\u0131m-2 gaz boru hatt\u0131n\u0131n in\u015faat\u0131 ve i\u015fletmesi i\u00e7in ikinci izni verdi. \u0130lgili a\u00e7\u0131klama, gerekli ikinci izin belgesine ili\u015fkin karar\u0131 alan G\u00fcney Finlandiya B\u00f6lge \u0130dari Dairesi taraf\u0131ndan yap\u0131ld\u0131. Finlandiya y\u00f6netimi, toplam uzunlu\u011fu 1200 km\u2019nin \u00fczerinde olacak olan Kuzey Ak\u0131m-2 boru hatt\u0131n\u0131n Finlandiya topraklar\u0131ndan ge\u00e7ecek 374 kilometrelik k\u0131sm\u0131n\u0131n ayr\u0131nt\u0131l\u0131 yap\u0131m ve i\u015fletme plan\u0131n\u0131 onaylad\u0131.<\/p>\n<p>\u0130lk izni Finlandiya h\u00fck\u00fcmeti ge\u00e7en hafta vermi\u015fti. Kuzey Ak\u0131m-2 projesinin yap\u0131m operat\u00f6r\u00fc olan Nord Stream 2 AG \u015firketi, b\u00f6ylelikle Finlandiya\u2019da izin alma s\u00fcrecinin tamamland\u0131\u011f\u0131n\u0131 belirtti. \u015eirket, Rusya, \u0130sve\u00e7 ve Danimarka olmak \u00fczere gaz boru hatt\u0131n\u0131n g\u00fczergah\u0131ndaki di\u011fer \u00fclkelerde izin alma prosed\u00fcrlerinin programa uygun ilerledi\u011fini savundu.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Finlandiya y\u00f6netimi, toplam uzunlu\u011fu 1200 km\u2019nin \u00fczerinde olacak olan Kuzey Ak\u0131m-2 boru hatt\u0131n\u0131n Finlandiya topraklar\u0131ndan ge\u00e7ecek 374 kilometrelik k\u0131sm\u0131n\u0131n ayr\u0131nt\u0131l\u0131 yap\u0131m ve i\u015fletme [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":73276,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[46,53],"tags":[92,1128,19761,23219,67,1009,12654,7782,26646,37343],"views":765,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/73275"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=73275"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/73275\/revisions"}],"predecessor-version":[{"id":73277,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/73275\/revisions\/73277"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/73276"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=73275"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=73275"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=73275"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}