{"id":73217,"date":"2018-04-11T12:20:58","date_gmt":"2018-04-11T09:20:58","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=73217"},"modified":"2018-04-11T12:21:37","modified_gmt":"2018-04-11T09:21:37","slug":"abdde-siber-saldiri-boru-hatti-sirketlerini-vurdu","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/abdde-siber-saldiri-boru-hatti-sirketlerini-vurdu\/","title":{"rendered":"(Turkish) ABD\u2019de Siber Sald\u0131r\u0131 Boru Hatt\u0131 \u015eirketlerini Vurdu"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/73217\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>En az be\u015f ABD boru hatt\u0131 \u015firketi, elektronik haberle\u015fme sistemlerinin son birka\u00e7 g\u00fcnde kilitlendi\u011fini, aralar\u0131ndan d\u00f6rt \u015firket ise bu kesintilerinin bir siber sald\u0131r\u0131 sonucu oldu\u011funu do\u011frulad\u0131. <\/strong><\/p>\n<p><img loading=\"lazy\" class=\"alignleft size-medium wp-image-73218\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/04\/abdde-siber-saldiri-boru-hatti-sirketlerini-vurdu-300x157.jpg\" alt=\"\" width=\"300\" height=\"157\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/04\/abdde-siber-saldiri-boru-hatti-sirketlerini-vurdu-300x157.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/04\/abdde-siber-saldiri-boru-hatti-sirketlerini-vurdu-80x42.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/04\/abdde-siber-saldiri-boru-hatti-sirketlerini-vurdu.jpg 310w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>Energy Services Group taraf\u0131ndan y\u00f6netilen bir elektronik sistemi hedef alan sald\u0131r\u0131, piyasa de\u011feri baz\u0131nda ABD\u2019nin en b\u00fcy\u00fck ikinci kamu kurulu\u015fu olan Duke Energy Corp.\u2019un t\u00fcketici verileri kayg\u0131lar\u0131 nedeniyle sistemden \u00e7\u0131kmas\u0131na neden oldu.<\/p>\n<p>M\u00fc\u015fteriler, ayl\u0131k faturalar\u0131nda gecikme ya\u015fayabileceklerine veya faturalar\u0131n\u0131 k\u0131smi olarak alabileceklerine dair uyar\u0131ld\u0131. Enerji Hizmetleri Grubu, sistemlerinin yeniden \u00e7al\u0131\u015f\u0131r hale ge\u00e7ti\u011fini ve g\u00fcvenli bir \u015fekilde hizmet vermeye devam etmek i\u00e7in test ve sistem do\u011frulama i\u015flemlerine devam ettiklerini a\u00e7\u0131klad\u0131.<\/p>\n<p><a href=\"https:\/\/www.bloomberg.com\/news\/articles\/2018-04-04\/cyberattack-bleeds-into-utility-space-as-duke-sees-billing-delay\"><em>Bloomberg<\/em><\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.En az be\u015f ABD boru hatt\u0131 \u015firketi, elektronik haberle\u015fme sistemlerinin son birka\u00e7 g\u00fcnde kilitlendi\u011fini, aralar\u0131ndan d\u00f6rt \u015firket ise bu kesintilerinin bir siber sald\u0131r\u0131 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":73218,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53],"tags":[2394,67,1009,19577],"views":578,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/73217"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=73217"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/73217\/revisions"}],"predecessor-version":[{"id":73219,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/73217\/revisions\/73219"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/73218"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=73217"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=73217"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=73217"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}