{"id":73184,"date":"2018-04-10T11:04:10","date_gmt":"2018-04-10T08:04:10","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=73184"},"modified":"2018-04-10T11:04:10","modified_gmt":"2018-04-10T08:04:10","slug":"suudi-arabistan-ve-japon-softbanktan-200-milyar-dolarlik-gunes-anlasmasi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/suudi-arabistan-ve-japon-softbanktan-200-milyar-dolarlik-gunes-anlasmasi\/","title":{"rendered":"(Turkish) Suudi Arabistan ve Japon Softbank&#8217;tan 200 Milyar Dolarl\u0131k G\u00fcne\u015f Anla\u015fmas\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/73184\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Suudi Arabistan Petrol d\u0131\u015f\u0131nda Yenilenebilir Enerji Kaynaklar\u0131ndan Enerji Sa\u011flama konusunda \u00e7ok b\u00fcy\u00fck bir ad\u0131m daha at\u0131yor. Bu do\u011frultuda d\u00fcnyan\u0131n en b\u00fcy\u00fck g\u00fcne\u015f enerji projesi Suudi Arabistan\u2019da, Japon Softbank\u2019\u0131n deste\u011fi ile yap\u0131lacak.<\/strong><\/p>\n<p>G\u00fcne\u015f Enerjisi Projesi Hakk\u0131nda bas\u0131n toplant\u0131s\u0131nda verilen bilgiye g\u00f6re, fazlar halinde yap\u0131lacak 200<strong><img loading=\"lazy\" class=\"alignright size-medium wp-image-73185\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/04\/suudi-arabistan-ve-japon-softbanktan-200-milyar-dolarlik-gunes-anlasmasi-300x150.jpg\" alt=\"\" width=\"300\" height=\"150\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/04\/suudi-arabistan-ve-japon-softbanktan-200-milyar-dolarlik-gunes-anlasmasi-300x150.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/04\/suudi-arabistan-ve-japon-softbanktan-200-milyar-dolarlik-gunes-anlasmasi-500x250.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/04\/suudi-arabistan-ve-japon-softbanktan-200-milyar-dolarlik-gunes-anlasmasi-80x40.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/04\/suudi-arabistan-ve-japon-softbanktan-200-milyar-dolarlik-gunes-anlasmasi.jpg 640w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/strong> gigavatl\u0131k proje 2030 y\u0131l\u0131nda tamamlanacak. Maliyeti ise 200 milyar dolar olacak.<\/p>\n<p><strong>\u0130LK \u0130K\u0130 B\u00d6L\u00dcME BU YIL BA\u015eLANIYOR<\/strong><\/p>\n<p>200 gigavatl\u0131k proje \u00fclkenin tamam\u0131na yay\u0131lacak. 7.2 gigavatl\u0131k kapasiteye sahip ilk iki b\u00f6l\u00fcm\u00fcn in\u015fas\u0131na bu y\u0131l ba\u015flanmas\u0131 planlan\u0131rken, 2019 y\u0131l\u0131ndan itibaren elektrik \u00fcretecek.<\/p>\n<p><strong>100 B\u0130N K\u0130\u015e\u0130L\u0130K \u0130ST\u0130HDAM<\/strong><\/p>\n<p>G\u00fcne\u015f enerjisi end\u00fcstrisine yap\u0131lacak bu yat\u0131r\u0131m\u0131n \u00fclkede 100 bin ki\u015filik bir istihdam taratmas\u0131 ve \u00fclkenin milli geilirini 12 milyar dolar art\u0131rmas\u0131 bekleniyor. Ayn\u0131 zamanda Suudi Arabistan bu proje ile elektrik \u00fcretimi i\u00e7in kullan\u0131lan petrolden 40 milyar dolar tasarruf sa\u011flayacak.<\/p>\n<p>Haberin <a href=\"http:\/\/solar.ist\/suudi-arabistan-japon-softbank-200-milyar-dolarlik-gunes-enerji-projesine-imza-atti\/\" rel=\"nofollow\">Devam\u0131 \u0130\u00e7in TIKLAYINIZ&gt;&gt;&gt;<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Suudi Arabistan Petrol d\u0131\u015f\u0131nda Yenilenebilir Enerji Kaynaklar\u0131ndan Enerji Sa\u011flama konusunda \u00e7ok b\u00fcy\u00fck bir ad\u0131m daha at\u0131yor. Bu do\u011frultuda d\u00fcnyan\u0131n en b\u00fcy\u00fck g\u00fcne\u015f enerji [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":73185,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49],"tags":[67,1009,37322,23416,431,23131,37321,1463],"views":626,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/73184"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=73184"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/73184\/revisions"}],"predecessor-version":[{"id":73186,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/73184\/revisions\/73186"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/73185"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=73184"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=73184"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=73184"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}