{"id":7317,"date":"2013-02-25T18:49:59","date_gmt":"2013-02-25T15:49:59","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=7317"},"modified":"2013-02-25T18:52:14","modified_gmt":"2013-02-25T15:52:14","slug":"yuzde-61-verimli-kombine-cevrim-gaz-santrali-samsunda-kurulacak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/yuzde-61-verimli-kombine-cevrim-gaz-santrali-samsunda-kurulacak\/","title":{"rendered":"(Turkish) Y\u00fczde 61 Verimli Kombine \u00c7evrim Gaz Santrali Samsun\u2019da Kurulacak"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/7317\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Cengiz Holding, Cengiz Enerji Sanayi ve Ticaret A.\u015e.\u2019ye ait 600 Megawatt\u2019l\u0131k Samsun Do\u011fal Gaz Kombine Enerji \u00c7evrim Santrali i\u00e7in Siemens\u2019le anla\u015fma imzalad\u0131.<\/strong><\/p>\n<p>Enerji teknolojilerinde d\u00fcnyan\u0131n en b\u00fcy\u00fck \u00fcreticilerinden biri olan Siemens ve 1980 y\u0131l\u0131nda ba\u015flad\u0131\u011f\u0131 faaliyetlerini bug\u00fcn 12 farkl\u0131 \u015firketle s\u00fcrd\u00fcren Cengiz Holding, Cengiz Enerji Sanayi ve Ticaret A.\u015e.\u2019ye ait 600 Megawatt\u2019l\u0131k (MW) Samsun Do\u011fal Gaz Kombine \u00c7evrim Santrali i\u00e7in anla\u015fma imzalad\u0131. T\u00fcrkiye\u2019nin enerji ihtiyac\u0131na \u00f6nemli \u00f6l\u00e7\u00fcde katk\u0131 sa\u011flayacak yat\u0131r\u0131m\u0131n 2015 y\u0131l\u0131 ba\u015f\u0131nda tamamlanmas\u0131 planlan\u0131yor.<\/p>\n<p><img loading=\"lazy\" class=\"alignleft size-medium wp-image-7318\" title=\"siemens-gaz-turbin-kombine-cevrim-santrali-samsun\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/02\/siemens-gaz-turbin-kombine-cevrim-santrali-samsun-300x194.jpg\" alt=\"\" width=\"300\" height=\"194\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/02\/siemens-gaz-turbin-kombine-cevrim-santrali-samsun-300x194.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/02\/siemens-gaz-turbin-kombine-cevrim-santrali-samsun-77x50.jpg 77w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/02\/siemens-gaz-turbin-kombine-cevrim-santrali-samsun.jpg 386w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>Siemens taraf\u0131ndan \u00fcretilen ve yakla\u015f\u0131k y\u00fczde 61 verimlili\u011fe sahip olmas\u0131yla d\u00fcnya rekoru k\u0131ran H s\u0131n\u0131f\u0131 y\u00fcksek verimli SGT5-8000H t\u00fcrbinli kombine \u00e7evrim santrali, y\u00fcksek \u00e7evre duyarl\u0131l\u0131\u011f\u0131, son derece h\u0131zl\u0131 \u015febeke uyumu, esnek i\u015fletme kabiliyeti ve makul i\u015fletme-bak\u0131m konseptiyle \u00f6n plana \u00e7\u0131k\u0131yor.<\/p>\n<p>Siemens\u2019in yenilik\u00e7i \u00e7\u00f6z\u00fcmleriyle \u015fehirlerin enerji ihtiyac\u0131n\u0131 kar\u015f\u0131lamaya y\u00f6nelik \u00e7ok \u00f6nemli projelere imza att\u0131\u011f\u0131n\u0131 ifade eden Siemens Sanayi ve Ticaret A.\u015e. Y\u00f6netim Kurulu Ba\u015fkan\u0131 ve CEO\u2019su H\u00fcseyin Gelis, \u201cSiemens\u2019in, bug\u00fcn \u00fclke genelindeki elektrik altyap\u0131s\u0131n\u0131n yakla\u015f\u0131k y\u00fczde 30\u2019unda imzas\u0131 var. Yenilenebilir enerji yat\u0131r\u0131mlar\u0131nda da ilk ba\u015fvurulan \u015firketlerden biri olan Siemens, k\u00fcresel \u00f6l\u00e7ekte sahip oldu\u011fu tecr\u00fcbeyi, T\u00fcrk yat\u0131r\u0131mc\u0131lar\u0131n ihtiya\u00e7lar\u0131n\u0131 kar\u015f\u0131lamada kullan\u0131yor.<\/p>\n<p>Cengiz Enerji ile yapt\u0131\u011f\u0131m\u0131z anla\u015fma, en y\u00fcksek verimlilik s\u0131n\u0131f\u0131ndaki gaz t\u00fcrbiniyle fark yaratan elektrik santralimizi T\u00fcrkiye\u2019ye ta\u015f\u0131yor. D\u00fcnya rekoruna sahip H s\u0131n\u0131f\u0131 y\u00fcksek verimli t\u00fcrbinimizin T\u00fcrkiye\u2019de ilk kurulumunu ger\u00e7ekle\u015ftiriyor olmaktan ve bu projede Cengiz Enerji ile \u00e7al\u0131\u015fmaktan mutluluk duyuyoruz\u201d dedi.<\/p>\n<p>T\u00fcrkiye\u2019nin farkl\u0131 b\u00f6lgelerinde termik ve hidroelektrik enerji santrali yat\u0131r\u0131mlar\u0131 bulunan ve Samsun b\u00f6lgesinin do\u011falgaz da\u011f\u0131t\u0131m\u0131n\u0131 da y\u00fcr\u00fcten Cengiz Enerji\u2019nin, 2015 y\u0131l\u0131nda Samsun\u2019da i\u015fletmeye al\u0131nmas\u0131 hedeflenen Samsun Do\u011fal Gaz Kombine Enerji \u00c7evrim Santrali yakla\u015f\u0131k 600 Megawatt g\u00fcc\u00fcnde olacak.<\/p>\n<h2>Siemens\u2019ten 16 y\u0131ll\u0131k servis anla\u015fmas\u0131<\/h2>\n<p>Siemens, garanti d\u00f6nemi ve sonras\u0131 olmak \u00fczere toplam 16 y\u0131l\u0131 kapsayan uzun d\u00f6nemli servis anla\u015fmas\u0131yla da Cengiz Enerji\u2019ye destek olmay\u0131 s\u00fcrd\u00fcrecek. Planl\u0131 bak\u0131mlar, yedek par\u00e7a temini ve par\u00e7a yenilemelerini kapsayan bak\u0131m anla\u015fmas\u0131, tesisin en \u00fcst seviyede \u00e7al\u0131\u015fmas\u0131n\u0131 sa\u011flayacak.<\/p>\n<p>Cengiz Enerji\u2019nin yeni kombine \u00e7evrim santralinde SGT5-8000H gaz t\u00fcrbini ile birlikte yine Siemens\u2019in SST5-5000 buhar t\u00fcrbini ile bir adet SGen5-3000W jenerat\u00f6r ve SPPA-T3000 kontrol sistemi de kullan\u0131lacak. So\u011futma sistemi olarak tek ge\u00e7i\u015fli (Once Through) deniz suyu so\u011futma sisteminin kullan\u0131laca\u011f\u0131 santralde, montaj ve devreye alma \u00e7al\u0131\u015fmalar\u0131n\u0131n beklenen s\u00fcrenin de alt\u0131nda tamamlanarak tesisin ticari i\u015fletmeye al\u0131nmas\u0131 ama\u00e7lan\u0131yor.<\/p>\n<h2>Yaln\u0131zca 30 dakikada 500 Megawatt g\u00fcc\u00fc \u015febekeye veriyor<\/h2>\n<p>Siemens\u2019in verimlilik rekoru k\u0131ran yeni teknolojili H s\u0131n\u0131f\u0131 t\u00fcrbini, Almanya Irsching 4 Enerji Santrali\u2019nde yaln\u0131zca 30 dakikada 500 MW\u2019tan fazla g\u00fcc\u00fc \u015febekeye verebilmesiyle dikkat \u00e7ekmi\u015fti. Ayn\u0131 projede, dakikada 35 MW g\u00fcc\u00fc istikrarl\u0131 bir \u015fekilde sa\u011flayabilen SGT5-8000H gaz t\u00fcrbini, daha fazla ya da daha az g\u00fc\u00e7 talebine h\u0131zl\u0131 tepki verebilme yetenekleriyle Avrupa ve Amerika\u2019da da pek \u00e7ok yat\u0131r\u0131mc\u0131n\u0131n ihtiya\u00e7 duyduklar\u0131 esnek i\u015fletme ihtiya\u00e7lar\u0131n\u0131 kar\u015f\u0131lad\u0131\u011f\u0131 i\u00e7in y\u00fcksek talep g\u00f6r\u00fcyor.<\/p>\n<p>D\u00fcnyada 20 adet sat\u0131lan H s\u0131n\u0131f\u0131 y\u00fcksek verimli SGT5-8000H t\u00fcrbinleri d\u00fcnya genelinde kullan\u0131lan ve do\u011fal gazla \u00e7al\u0131\u015fan ortalama santrallere g\u00f6re kombine \u00e7evrim santralinin kilowatt-saat (kWh) ba\u015f\u0131na yakla\u015f\u0131k \u00fc\u00e7te bir oran\u0131nda daha az yak\u0131t t\u00fcketmesini sa\u011fl\u0131yor. Yak\u0131t masraflar\u0131nda ciddi bir tasarruf sa\u011flayan Siemens teknolojisi, ayn\u0131 zamanda CO2 emisyonunu da kayda de\u011fer oranda azaltarak, s\u00fcrd\u00fcr\u00fclebilir g\u00fc\u00e7 tedari\u011fi ve iklim de\u011fi\u015fikli\u011fine kar\u015f\u0131 korumaya katk\u0131da bulunuyor.<\/p>\n<p>Kaynak: <a href=\"http:\/\/enerjienstitusu.com\/2013\/02\/25\/yuzde-61-verimli-kombine-cevrim-gaz-santrali-samsunda-kurulacak\/\" target=\"_blank\">Enerji Enstit\u00fcs\u00fc<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Cengiz Holding, Cengiz Enerji Sanayi ve Ticaret A.\u015e.\u2019ye ait 600 Megawatt\u2019l\u0131k Samsun Do\u011fal Gaz Kombine Enerji \u00c7evrim Santrali i\u00e7in Siemens\u2019le anla\u015fma imzalad\u0131. Enerji [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":7318,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[46,53,52],"tags":[2890,2889,1162,67,2891,2893,1053,2892,1293],"views":1595,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/7317"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=7317"}],"version-history":[{"count":4,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/7317\/revisions"}],"predecessor-version":[{"id":7321,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/7317\/revisions\/7321"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/7318"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=7317"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=7317"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=7317"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}