{"id":73149,"date":"2018-04-09T18:58:17","date_gmt":"2018-04-09T15:58:17","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=73149"},"modified":"2018-04-09T18:58:17","modified_gmt":"2018-04-09T15:58:17","slug":"antalya-stadyumu-catisindaki-2-ges-ile-25-yildir-elektrik-uretiyor","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/antalya-stadyumu-catisindaki-2-ges-ile-25-yildir-elektrik-uretiyor\/","title":{"rendered":"(Turkish) Antalya Stadyumu \u00c7at\u0131s\u0131ndaki 2 GES \u0130le 2,5 Y\u0131ld\u0131r Elektrik \u00dcretiyor!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/73149\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Antalya stad\u0131n\u0131n\u00a016 bin metrekarelik \u00e7at\u0131s\u0131n\u0131n 12 bin metrekarelik k\u0131sm\u0131nda 1,4 megawatt enerji g\u00fcc\u00fc bulunan g\u00fcne\u015f panelleriyle elektrik \u00fcretilerek 2,5 y\u0131ld\u0131r \u015fehir \u015febekesine elektrikte veriliyor.<\/strong><\/p>\n<p><img loading=\"lazy\" class=\"alignleft size-medium wp-image-73150\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/04\/antalya-stadyumu-catisindaki-2-ges-ile-25-yildir-elektrik-uretiyor-300x150.jpg\" alt=\"\" width=\"300\" height=\"150\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/04\/antalya-stadyumu-catisindaki-2-ges-ile-25-yildir-elektrik-uretiyor-300x150.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/04\/antalya-stadyumu-catisindaki-2-ges-ile-25-yildir-elektrik-uretiyor-500x250.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/04\/antalya-stadyumu-catisindaki-2-ges-ile-25-yildir-elektrik-uretiyor-80x40.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/04\/antalya-stadyumu-catisindaki-2-ges-ile-25-yildir-elektrik-uretiyor.jpg 640w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>Antalya Stadyumu T\u00fcrkiye\u2019de g\u00fcne\u015f enerjisinden elektrik \u00fcretilen tek stat olma \u00f6zelli\u011fine sahip. Ayn\u0131 zamanda \u00fcretim kapasitesiyle d\u00fcnyada en fazla enerji \u00fcretilen spor tesisi unvan\u0131 da bulunan Antalya Stadyumu\u2019nun \u00e7at\u0131s\u0131nda 2 santral yer almaktad\u0131r.<\/p>\n<p>Antalya Gen\u00e7lik Hizmetleri ve Spor \u0130l M\u00fcd\u00fcr\u00fc\u00a0<strong>Burhanettin Hac\u0131cafero\u011flu,\u00a0<\/strong>\u201cStattaki g\u00fcne\u015f panelleriyle y\u0131lda yakla\u015f\u0131k 1,4 milyon kWh elektrik \u00fcretildi. Bu da UEFA\u2019n\u0131n istedi\u011fi en \u00f6nemli kriterlerden birisi olmaktad\u0131r. Bakanl\u0131\u011f\u0131m\u0131z t\u00fcm spor tesislerinde g\u00fcne\u015f enerji sistemi kurulmas\u0131 i\u00e7in \u00e7al\u0131\u015fma ba\u015flat\u0131yor. 2,5 y\u0131ll\u0131k enerji \u00fcretimimizle panellerin maliyetinin y\u00fczde 40\u2019\u0131 kar\u015f\u0131land\u0131. G\u00fcne\u015f enerjisinden elektrik \u00fcretim sisteminin maliyetini, 5 y\u0131lda kar\u015f\u0131layabiliyor\u201d dedi.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Antalya stad\u0131n\u0131n\u00a016 bin metrekarelik \u00e7at\u0131s\u0131n\u0131n 12 bin metrekarelik k\u0131sm\u0131nda 1,4 megawatt enerji g\u00fcc\u00fc bulunan g\u00fcne\u015f panelleriyle elektrik \u00fcretilerek 2,5 y\u0131ld\u0131r \u015fehir \u015febekesine elektrikte [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":73150,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49],"tags":[37209,67,1009,2326,23416,2569,23133,23131],"views":1605,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/73149"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=73149"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/73149\/revisions"}],"predecessor-version":[{"id":73151,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/73149\/revisions\/73151"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/73150"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=73149"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=73149"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=73149"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}