{"id":7310,"date":"2013-02-25T17:42:04","date_gmt":"2013-02-25T14:42:04","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=7310"},"modified":"2013-02-25T17:43:19","modified_gmt":"2013-02-25T14:43:19","slug":"lisanssiz-onayli-ilk-gunes-santrali-muglada","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/lisanssiz-onayli-ilk-gunes-santrali-muglada\/","title":{"rendered":"(Turkish) Lisanss\u0131z, Onayl\u0131 \u0130lk G\u00fcne\u015f Santrali Mu\u011fla\u2019da"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/7310\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Mu\u011fla Belediyesi taraf\u0131ndan G\u00fcney Ege Kalk\u0131nma Ajans\u0131\u2019na sunulan \u2018Sonsuz Kayna\u011f\u0131m\u0131z G\u00fcne\u015f\u2019 projesi sonras\u0131 lisanss\u0131z elektrik \u00fcretimi ba\u015flad\u0131. TEDA\u015e taraf\u0131ndan kabul\u00fc yap\u0131l\u0131p devreye al\u0131nan, ilk \u015febekeye ba\u011fl\u0131 Fotovoltaik Sistem Mu\u011fla Belediyesi taraf\u0131ndan kullan\u0131lmaya ba\u015fland\u0131.<\/strong><\/p>\n<p>\u201cSonsuz Kayna\u011f\u0131m\u0131z G\u00fcne\u015f\u201d Projesi hakk\u0131nda a\u00e7\u0131klama yapan Mu\u011fla Belediyesi proje sorumlusu \u0130n\u015faat M\u00fchendisi (Enerji uzman\u0131) Ay\u015feg\u00fcl K\u0131yak, \u201cMu\u011fla\u2019n\u0131n g\u00fcne\u015flenme s\u00fcresi hem b\u00f6lgenin hem de T\u00fcrkiye ortalamas\u0131n\u0131n \u00fcst\u00fcndedir. Yenilenebilir enerji bilincinin yayg\u0131nla\u015ft\u0131r\u0131lmas\u0131 konusunda yerel y\u00f6netimlere b\u00fcy\u00fck g\u00f6rev d\u00fc\u015fmektedir. Mu\u011fla Belediyesi olarak \u00e7evre bilincini artt\u0131racak di\u011fer projelerimiz gibi bu projemizde bizim i\u00e7in b\u00fcy\u00fck \u00f6nem ta\u015f\u0131maktad\u0131r.\u00a0 2010 Y\u0131l\u0131 Mali Destek Program\u0131 kapsam\u0131nda Mu\u011fla Belediyesi taraf\u0131ndan GEKA\u2019ya sunulan 777 bin 255 TL b\u00fct\u00e7eli \u2018Sonsuz Kayna\u011f\u0131m\u0131z G\u00fcne\u015f\u2019 isimli proje i\u00e7in y\u00fczde 74 destek oran\u0131 ile 575 bin TL destek almaya hak kazan\u0131lm\u0131\u015ft\u0131r.<\/p>\n<p><img loading=\"lazy\" class=\"alignleft size-medium wp-image-7311\" title=\"lisanssiz-onsyli-ilk-gunes-santrali-mugla-ya\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/02\/lisanssiz-onsyli-ilk-gunes-santrali-mugla-ya-300x190.png\" alt=\"\" width=\"300\" height=\"190\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/02\/lisanssiz-onsyli-ilk-gunes-santrali-mugla-ya-300x190.png 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/02\/lisanssiz-onsyli-ilk-gunes-santrali-mugla-ya-80x50.png 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/02\/lisanssiz-onsyli-ilk-gunes-santrali-mugla-ya.png 476w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>Projede \u015eebekeye Ba\u011fl\u0131 Fotovoltaik Sistemin Kurulmas\u0131 ve Devreye al\u0131nmas\u0131 i\u015fi 564 bin 630 TL (KDV Dahil) ihale bedeli ile ANEL Enerji Elektrik \u00dcretim Sanayi ve Ticaret Anonim \u015eirketi\u2019ne verilmi\u015f ve proje planlanandan daha d\u00fc\u015f\u00fck bir b\u00fct\u00e7e ile bitirilmi\u015ftir. Proje kapsam\u0131nda Mu\u011fla Belediyesi Mezbaha tesisinin elektrik ihtiyac\u0131n\u0131n y\u00fczde 78\u2019i, kurulu g\u00fcc\u00fc 105 kW olan fotovoltaik sistem taraf\u0131ndan kar\u015f\u0131lanacak. Bu projede en az 25 y\u0131ll\u0131k verimlilik garantili Fotovoltaik g\u00fcne\u015f panelleri kullan\u0131ld\u0131 ve yat\u0131r\u0131m\u0131n geri d\u00f6n\u00fc\u015f s\u00fcresi yakla\u015f\u0131k 6 y\u0131l. Sistemin \u00fcretti\u011fi ortalama y\u0131ll\u0131k enerji miktar\u0131 ile 2013 y\u0131l\u0131 elektrik faturas\u0131 bedeline g\u00f6re (36 kr\u015f\/KWs) y\u0131ll\u0131k elektrik fatura \u00f6demelerine 40 bin TL civar\u0131nda tasarruf sa\u011flanacak. T\u00fcketimin en d\u00fc\u015f\u00fck oldu\u011fu may\u0131s, haziran aylar\u0131nda fazla enerjinin Lisanss\u0131z Elektrik \u00fcretimine ili\u015fkin y\u00f6netmelik \u00e7er\u00e7evesinde, da\u011f\u0131t\u0131m \u015firketi AYDEM ile faturala\u015fma ve mahsupla\u015fma ile \u015febekeye verilecek\u201d dedi.<\/p>\n<p>Mu\u011fla Belediye Ba\u015fkan\u0131 Dr. Osman G\u00fcr\u00fcn isei proje ile ilgili olarak \u015funlar\u0131 s\u00f6yledi: \u201cSonsuz Kayna\u011f\u0131m\u0131z G\u00fcne\u015f projemiz, T\u00fcrkiye\u2019de ilk defa kabul\u00fc yap\u0131l\u0131p onay alan g\u00fcne\u015f enerji santralidir.\u00a0 Belediye olarak \u00e7evre bilinci konusuna \u00e7ok fazla \u00f6nem veriyoruz. Gelecek nesillere temiz ve ya\u015fan\u0131labilir bir d\u00fcnya b\u0131rakmak en b\u00fcy\u00fck g\u00f6revimiz. Kentimizde \u00e7evre bilincini artt\u0131rmak i\u00e7in herkese \u00f6rnek olacak projelerimiz devam edecek. Fotovoltaik, g\u00fcne\u015f pilleri ya da dizinleri sayesinde \u0131\u015f\u0131k kayna\u011f\u0131ndan, \u00e7o\u011fu zaman g\u00fcne\u015ften elektrik elde etme y\u00f6ntemidir. Mu\u011fla ve \u00e7evresi co\u011frafi konumunun getirdi\u011fi avantaj sayesinde y\u00fcksek g\u00fcne\u015f enerjisi potansiyeline sahiptir. Mu\u011fla\u2019da g\u00fcnl\u00fck ortalama g\u00fcne\u015flenme s\u00fcresi T\u00fcrkiye ortalamalar\u0131n\u0131n \u00fczerindedir. Bu sistem sayesinde, y\u0131lda 106,6 ton karbondioksit gaz\u0131 sal\u0131n\u0131m\u0131n\u0131n \u00f6nlenmesi ile y\u0131lda 320 adet yeti\u015fkin a\u011fa\u00e7 kurtar\u0131lacakt\u0131r\u201d<\/p>\n<p>Kaynak: <a href=\"http:\/\/enerjienstitusu.com\/2013\/02\/25\/lisanssiz-onayli-ilk-gunes-santrali-muglada\/\" target=\"_blank\">Enerji Enstit\u00fcs\u00fc<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Mu\u011fla Belediyesi taraf\u0131ndan G\u00fcney Ege Kalk\u0131nma Ajans\u0131\u2019na sunulan \u2018Sonsuz Kayna\u011f\u0131m\u0131z G\u00fcne\u015f\u2019 projesi sonras\u0131 lisanss\u0131z elektrik \u00fcretimi ba\u015flad\u0131. TEDA\u015e taraf\u0131ndan kabul\u00fc yap\u0131l\u0131p devreye al\u0131nan, [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":7311,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49],"tags":[19,67,2885,2887,2884,13,2886,2888,1216,105],"views":676,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/7310"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=7310"}],"version-history":[{"count":3,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/7310\/revisions"}],"predecessor-version":[{"id":7313,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/7310\/revisions\/7313"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/7311"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=7310"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=7310"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=7310"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}