{"id":73092,"date":"2018-04-06T13:26:39","date_gmt":"2018-04-06T10:26:39","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=73092"},"modified":"2018-04-06T13:26:39","modified_gmt":"2018-04-06T10:26:39","slug":"ruzgarda-yerli-uretimi-destekleyecek-cozumler","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/ruzgarda-yerli-uretimi-destekleyecek-cozumler\/","title":{"rendered":"(Turkish) R\u00fczgarda Yerli \u00dcretimi Destekleyecek \u00c7\u00f6z\u00fcmler&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/73092\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>R\u00fczgar enerjisi sekt\u00f6r toplant\u0131s\u0131ndan yerli \u00fcretimi destekleyici \u00e7\u00f6z\u00fcm \u00f6nerileri \u00e7\u0131kt\u0131. Bu \u00f6neriler olu\u015fturulan komisyonda tart\u0131\u015f\u0131lacak ve detayland\u0131r\u0131l\u0131p bir rapor halinde ilgili kurumlara destek olmas\u0131 i\u00e7in sunulacak.<\/strong><\/p>\n<p>05.04.2018 -T\u00fcrkiye R\u00fczgar Enerjisi Birli\u011fi\u2019nin \u00a0(T\u00dcREB) ge\u00e7ti\u011fimiz g\u00fcn Holiday \u0130nn Otel\u2019de ger\u00e7ekle\u015ftirdi\u011fi sekt\u00f6r toplant\u0131s\u0131nda, r\u00fczgarda yerli \u00fcretimi destekleyecek \u00e7\u00f6z\u00fcm \u00f6nerileri konu\u015fuldu.<\/p>\n<p><img loading=\"lazy\" class=\"alignright size-medium wp-image-73093\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/04\/ruzgarda-yerli-uretimi-destekleyecek-cozumler-300x200.jpg\" alt=\"\" width=\"300\" height=\"200\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/04\/ruzgarda-yerli-uretimi-destekleyecek-cozumler-300x200.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/04\/ruzgarda-yerli-uretimi-destekleyecek-cozumler-500x334.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/04\/ruzgarda-yerli-uretimi-destekleyecek-cozumler-75x50.jpg 75w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/04\/ruzgarda-yerli-uretimi-destekleyecek-cozumler.jpg 562w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>Toplant\u0131n\u0131n ilk b\u00f6l\u00fcm\u00fcnde sekt\u00f6r payda\u015flar\u0131n\u0131n sorunlar\u0131, ikinci b\u00f6l\u00fcmde ise yat\u0131r\u0131m ve i\u015fletme maliyetlerini azalt\u0131c\u0131 \u00f6neriler ile s\u00fcreci geli\u015ftirici projeler \u00fczerinde duruldu.<\/p>\n<p>T\u00dcREB Ba\u015fkan\u0131 Mustafa Serdar Ataseven, 2020 y\u0131l\u0131 sonras\u0131 yenilenebilir enerji sekt\u00f6r\u00fcnde destekleme mekanizmalar\u0131 nas\u0131l olmal\u0131? sorusuna cevap aramak i\u00e7in bu toplant\u0131y\u0131 d\u00fczenlediklerini belirtti. Sekt\u00f6r\u00fcn sorunlar\u0131 nedeniyle h\u0131zla devam edemediklerine de\u011finen Ataseven, sorunlar\u0131 tan\u0131mlay\u0131p, \u00e7\u00f6z\u00fcm \u00f6nerileri ile birlikte ilgili kurumlara bir raporla ula\u015ft\u0131rmay\u0131 hedeflediklerini dile getirdi. Mevzuatlar\u0131n, ayn\u0131 kurumda \u00e7al\u0131\u015fan uzmanlar taraf\u0131ndan bile farkl\u0131 \u015fekillerde yorumland\u0131\u011f\u0131n\u0131n alt\u0131n\u0131 \u00e7izen Ataseven, sekt\u00f6r\u00fcn daha h\u0131zl\u0131 ilerlemesi i\u00e7in konuya a\u00e7\u0131kl\u0131k getirecek \u00f6neriler \u00fczerinde \u00e7al\u0131\u015ft\u0131klar\u0131n\u0131 ve bunu olu\u015fturacaklar\u0131 komisyon \u00e7al\u0131\u015fmas\u0131 sonras\u0131nda payla\u015facaklar\u0131n\u0131 ifade etti.<\/p>\n<p>Ge\u00e7en y\u0131l yap\u0131lan 3.000MW\u2019l\u0131k yar\u0131\u015fmalardan \u00e7\u0131kan sonu\u00e7lar\u0131n, \u00a0Enerji Bakanl\u0131\u011f\u0131n\u0131n milli ve yerli politikalar\u0131yla \u00e7eli\u015fti\u011fine dikkat \u00e7ekildi. Bu \u015fekilde ilerlemenin yerlile\u015fmeyi desteklemeyece\u011fi ve acilen \u00e7\u00f6z\u00fcm \u00fcretilmesi gerekti\u011fi konusunda g\u00f6r\u00fc\u015f birli\u011fine var\u0131ld\u0131.<\/p>\n<p>Toplant\u0131da \u00f6ne \u00e7\u0131kan baz\u0131 ba\u015fl\u0131klar \u015funlar oldu:<\/p>\n<p>*Kapasite art\u0131\u015f taleplerinin hayata ge\u00e7irilmesinin sekt\u00f6re, ekonomiye, istihdama ve cari a\u00e7\u0131\u011fa katk\u0131s\u0131.<\/p>\n<p>*Yerli \u00fcretimi destekleyecek ucuz finansman modellerini m\u00fcmk\u00fcn k\u0131lacak \u00e7\u00f6z\u00fcmler, finansman aya\u011f\u0131n\u0131 kolayla\u015ft\u0131racak \u00f6neriler.<\/p>\n<p>*Yerlile\u015fmeyi destekleyen YEKA modelinin devam\u0131n\u0131n yan\u0131nda, sekt\u00f6r\u00fcn tekelle\u015fmemesi ve derinle\u015fmesi ad\u0131na k\u00fc\u00e7\u00fck ve orta \u00f6l\u00e7ekli projelerin de devam\u0131na imkan tan\u0131nmas\u0131.<\/p>\n<p>*Baz\u0131 STK\u2019lar\u0131n \u00c7ED iptaline y\u00f6nelik a\u00e7t\u0131klar\u0131 dava s\u00fcre\u00e7lerinde, bilirki\u015filerin yetersiz kalmas\u0131 ve<\/p>\n<p>a\u00e7\u0131lan davalardan yat\u0131r\u0131mc\u0131lar\u0131n \u00e7ok ge\u00e7 haberinin olmas\u0131.<\/p>\n<p>*Mevcut mevzuatlardaki keyfi uygulamalar, farkl\u0131 yorumlamalar ve her b\u00f6lgede farkl\u0131 uygulamalar nedeniyle geciken projeler.<\/p>\n<p>*\u0130zin s\u00fcre\u00e7lerinin uzun olmas\u0131 nedeniyle projelerin hayata ge\u00e7i\u015finin gecikmesi.<\/p>\n<p>*Hizmet bedeli veya katk\u0131 pay\u0131 ad\u0131 alt\u0131nda ilgili kurumlara yap\u0131lan \u00f6demelerin a\u015f\u0131r\u0131l\u0131\u011f\u0131.<\/p>\n<p>*Tahmin kalitesinin belli bir seviyenin \u00fcst\u00fcne \u00e7\u0131kamamas\u0131ndan kaynakl\u0131 kay\u0131plar.<\/p>\n<p>*T\u00fcrkiye\u2019de \u00fcretilen sanayi \u00fcr\u00fcn\u00fcn\u00fc yurtd\u0131\u015f\u0131nda pazarlamak i\u00e7in yap\u0131lmas\u0131 gerekenler.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.R\u00fczgar enerjisi sekt\u00f6r toplant\u0131s\u0131ndan yerli \u00fcretimi destekleyici \u00e7\u00f6z\u00fcm \u00f6nerileri \u00e7\u0131kt\u0131. Bu \u00f6neriler olu\u015fturulan komisyonda tart\u0131\u015f\u0131lacak ve detayland\u0131r\u0131l\u0131p bir rapor halinde ilgili kurumlara destek [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":73093,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,50],"tags":[67,1009,3388,24949,23318,34960,1682,3390],"views":844,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/73092"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=73092"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/73092\/revisions"}],"predecessor-version":[{"id":73094,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/73092\/revisions\/73094"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/73093"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=73092"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=73092"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=73092"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}