{"id":72882,"date":"2018-03-29T22:37:22","date_gmt":"2018-03-29T19:37:22","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=72882"},"modified":"2018-03-30T08:45:38","modified_gmt":"2018-03-30T05:45:38","slug":"japonya-bir-nukleer-reaktor-daha-yenileme-yapilmadan-kapatilacak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/japonya-bir-nukleer-reaktor-daha-yenileme-yapilmadan-kapatilacak\/","title":{"rendered":"(Turkish) Japonya&#8217;da Bir N\u00fckleer Reakt\u00f6r Daha Yenileme Yap\u0131lmadan Kapat\u0131lacak"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/72882\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Japonya\u2019n\u0131n \u015eikoku Adas\u0131\u2019ndaki n\u00fckleer santralleri i\u015fleten \u015eikoku Elektrik Enerjisi \u015eirketi taraf\u0131ndan operasyon s\u00fcresi 2022 y\u0131l\u0131nda dolacak Ehime \u0130dari B\u00f6lgesi\u2019ndeki Ikata n\u00fckleer santralinin 2 numaral\u0131 reakt\u00f6r\u00fcn\u00fcn, 20 y\u0131ll\u0131k ilave faaliyet opsiyonu <img loading=\"lazy\" class=\"alignright size-medium wp-image-72883\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/03\/japonya-bir-nukleer-reaktor-daha-yenileme-yapilmadan-kapatilacak-300x169.jpg\" alt=\"\" width=\"300\" height=\"169\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/03\/japonya-bir-nukleer-reaktor-daha-yenileme-yapilmadan-kapatilacak-300x169.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/03\/japonya-bir-nukleer-reaktor-daha-yenileme-yapilmadan-kapatilacak-500x282.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/03\/japonya-bir-nukleer-reaktor-daha-yenileme-yapilmadan-kapatilacak-80x45.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/03\/japonya-bir-nukleer-reaktor-daha-yenileme-yapilmadan-kapatilacak.jpg 696w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>kullan\u0131lmadan devre d\u0131\u015f\u0131 b\u0131rak\u0131laca\u011f\u0131 belirtildi.<\/strong><\/p>\n<p>\u015eirket, karara ili\u015fkin gerek\u00e7esinde, yenileme sonras\u0131 elde edilecek elektrik miktar\u0131n\u0131n, reakt\u00f6r\u00fcn \u00f6mr\u00fcn\u00fcn uzat\u0131lmas\u0131 i\u00e7in yap\u0131lmas\u0131 gereken g\u00fcvenlik yat\u0131r\u0131mlar\u0131n\u0131n maliyetini kar\u015f\u0131lamaya yetmeyece\u011fini ifade etti.<\/p>\n<p>\u015eirket ayr\u0131ca reakt\u00f6r\u00fcn faaliyetini s\u00fcrd\u00fcrebilmesi i\u00e7in gerekli yat\u0131r\u0131mlar\u0131n 100 milyar yeni (951 milyon dolar) bulaca\u011f\u0131n\u0131 a\u00e7\u0131klam\u0131\u015ft\u0131r. Reakt\u00f6r\u00fcn y\u0131ll\u0131k 566 bin kilovatsaat olan elektrik \u00fcretim kapasitesinin bu maliyeti kar\u015f\u0131layamayaca\u011f\u0131 da \u00f6ng\u00f6r\u00fclmektedir.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Japonya\u2019n\u0131n \u015eikoku Adas\u0131\u2019ndaki n\u00fckleer santralleri i\u015fleten \u015eikoku Elektrik Enerjisi \u015eirketi taraf\u0131ndan operasyon s\u00fcresi 2022 y\u0131l\u0131nda dolacak Ehime \u0130dari B\u00f6lgesi\u2019ndeki Ikata n\u00fckleer santralinin 2 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":72883,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,43],"tags":[67,1009,37229,37230,21,23134,3020],"views":897,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/72882"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=72882"}],"version-history":[{"count":2,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/72882\/revisions"}],"predecessor-version":[{"id":72890,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/72882\/revisions\/72890"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/72883"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=72882"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=72882"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=72882"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}