{"id":72863,"date":"2018-03-29T11:38:53","date_gmt":"2018-03-29T08:38:53","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=72863"},"modified":"2018-03-29T11:40:24","modified_gmt":"2018-03-29T08:40:24","slug":"suudi-arabistan-ve-japon-softbank-gunes-enerjisi-projesine-imza-atti","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/suudi-arabistan-ve-japon-softbank-gunes-enerjisi-projesine-imza-atti\/","title":{"rendered":"(Turkish) Suudi Arabistan ve Japon Softbank G\u00fcne\u015f Enerjisinde Dev Projeye \u0130mza Att\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/72863\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Suudi Arabistan ve Japon Softbank, \u015fimdiye kadar ki d\u00fcnyan\u0131n en b\u00fcy\u00fck g\u00fcne\u015f enerji projesini ger\u00e7ekle\u015ftirme konusunda anla\u015fmaya vard\u0131lar. 2030 y\u0131l\u0131nda tamamlanmas\u0131 planlanan 200 gigavatl\u0131k projenin 200 milyar dolara mal olmas\u0131 bekleniyor. Proje Suudi <img loading=\"lazy\" class=\"alignleft size-medium wp-image-72864\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/03\/suudi-arabistan-ve-japon-softbank-gunes-enerjisi-projesine-imza-atti-300x150.jpg\" alt=\"\" width=\"300\" height=\"150\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/03\/suudi-arabistan-ve-japon-softbank-gunes-enerjisi-projesine-imza-atti-300x150.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/03\/suudi-arabistan-ve-japon-softbank-gunes-enerjisi-projesine-imza-atti-500x250.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/03\/suudi-arabistan-ve-japon-softbank-gunes-enerjisi-projesine-imza-atti-80x40.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/03\/suudi-arabistan-ve-japon-softbank-gunes-enerjisi-projesine-imza-atti.jpg 640w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>Arabistan\u2019da 100 bin ki\u015fiye i\u015f imkan\u0131 sa\u011flayacak.<\/strong><\/p>\n<p>G\u00fcne\u015f Enerjisi Projesi Hakk\u0131nda bas\u0131n toplant\u0131s\u0131nda verilen bilgiye g\u00f6re, fazlar halinde yap\u0131lacak 200 gigavatl\u0131k proje 2030 y\u0131l\u0131nda tamamlanacak. Maliyeti ise 200 milyar dolar\u0131 bulacak.<\/p>\n<p>SoftBank CEO\u2019su\u00a0<strong>Masayoshi Son<\/strong>, \u201cProje \u00e7ok b\u00fcy\u00fck. Ayn\u0131 zamanda Suddi Arabistan\u2019daki g\u00fcne\u015f enerji sistemleri \u00fcretimine de b\u00fcy\u00fck destek sa\u011flayacak\u201d ifadelerine yer verdi.<\/p>\n<p>200 gigavatl\u0131k proje \u00fclkenin tamam\u0131na yay\u0131lacak. 7.2 gigavatl\u0131k kapasiteye sahip ilk iki b\u00f6l\u00fcm\u00fcn in\u015fas\u0131n\u0131n bu y\u0131l ba\u015flanmas\u0131 planlan\u0131rken, 2019 y\u0131l\u0131ndan itibaren elektrik \u00fcretimi de ba\u015flam\u0131\u015f olacak.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Suudi Arabistan ve Japon Softbank, \u015fimdiye kadar ki d\u00fcnyan\u0131n en b\u00fcy\u00fck g\u00fcne\u015f enerji projesini ger\u00e7ekle\u015ftirme konusunda anla\u015fmaya vard\u0131lar. 2030 y\u0131l\u0131nda tamamlanmas\u0131 planlanan 200 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":72864,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49],"tags":[68,67,1009,2393,13,2833,37223,1463],"views":675,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/72863"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=72863"}],"version-history":[{"count":2,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/72863\/revisions"}],"predecessor-version":[{"id":72866,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/72863\/revisions\/72866"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/72864"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=72863"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=72863"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=72863"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}