{"id":72755,"date":"2018-03-25T14:46:35","date_gmt":"2018-03-25T11:46:35","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=72755"},"modified":"2018-03-25T14:50:43","modified_gmt":"2018-03-25T11:50:43","slug":"ebrd-izmirde-ruzgar-enerjisine-20-milyon-dolarlik-destek-veriyor","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/ebrd-izmirde-ruzgar-enerjisine-20-milyon-dolarlik-destek-veriyor\/","title":{"rendered":"(Turkish) EBRD, \u0130zmir\u2019de R\u00fczgar Enerjisine 20 Milyon Dolarl\u0131k Destek Veriyor"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/72755\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>\u0130zmir\u2019in Bay\u0131nd\u0131r, Kemalpa\u015fa ve Torbal\u0131 aras\u0131nda Alcazar Energy&#8217;nin kuraca\u011f\u0131 85 milyon dolar b\u00fcy\u00fckl\u00fc\u011f\u00fcndeki 55 MW\u2019l\u0131k Mersinli R\u00fczgar Enerjisi Projesi\u2019ne Avrupa \u0130mar ve <img loading=\"lazy\" class=\"alignleft size-medium wp-image-68039\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/10\/aksa-enerji-samli-resi-fernas-sirketler-grubuna-satti-300x155.jpg\" alt=\"\" width=\"300\" height=\"155\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/10\/aksa-enerji-samli-resi-fernas-sirketler-grubuna-satti-300x155.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/10\/aksa-enerji-samli-resi-fernas-sirketler-grubuna-satti-500x258.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/10\/aksa-enerji-samli-resi-fernas-sirketler-grubuna-satti-80x41.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/10\/aksa-enerji-samli-resi-fernas-sirketler-grubuna-satti.jpg 728w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>Kalk\u0131nma Bankas\u0131 (EBRD) 20 milyon dolar k\u0131demli teminatl\u0131 kredi verilecek.<\/strong><\/p>\n<p>EBRD krediyi Fransa Kalk\u0131nma Ajans\u0131\u2019n\u0131n yat\u0131r\u0131m \u015firketi Proparco ve ICBC T\u00fcrkiye\u2019den sa\u011flanacak 50 milyon dolarl\u0131k finans paketi ile birlikte sunacak. EBRD Y\u00f6netim Kurulu, projeye sa\u011flanacak kredi g\u00f6r\u00fc\u015fmesini 23 May\u0131s tarihinde yapacak.<\/p>\n<p>Mersinli RES\u2019te 2.5 MW g\u00fcce sahip 22 adet t\u00fcrbin kurulumu ger\u00e7ekle\u015ftirilecek. Santralin y\u0131ll\u0131k enerji \u00fcretiminin 202.356.000 kWh olmas\u0131 planlanmaktad\u0131r.\u00a0Mersinli RES\u2019te elde edilen elektrik enerjisi, I\u015f\u0131klar-Tire TM Enerji \u0130letim Hatt\u0131(154kV)\u2019na ba\u011flanarak \u015febekeye iletilecektir.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.\u0130zmir\u2019in Bay\u0131nd\u0131r, Kemalpa\u015fa ve Torbal\u0131 aras\u0131nda Alcazar Energy&#8217;nin kuraca\u011f\u0131 85 milyon dolar b\u00fcy\u00fckl\u00fc\u011f\u00fcndeki 55 MW\u2019l\u0131k Mersinli R\u00fczgar Enerjisi Projesi\u2019ne Avrupa \u0130mar ve Kalk\u0131nma [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":68039,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,50],"tags":[1259,68,67,1009,2689,2712,37194,474,35002,69,231,35004],"views":1348,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/72755"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=72755"}],"version-history":[{"count":3,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/72755\/revisions"}],"predecessor-version":[{"id":72758,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/72755\/revisions\/72758"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/68039"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=72755"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=72755"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=72755"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}