{"id":72752,"date":"2018-03-25T13:59:39","date_gmt":"2018-03-25T10:59:39","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=72752"},"modified":"2018-03-25T14:00:26","modified_gmt":"2018-03-25T11:00:26","slug":"areva-ve-siemens-finlandiyaya-nukleer-gecikme-odemesi-gerceklestirecek","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/areva-ve-siemens-finlandiyaya-nukleer-gecikme-odemesi-gerceklestirecek\/","title":{"rendered":"(Turkish) Areva ve Siemens&#8217;dan Finlandiya\u2019ya N\u00fckleer Gecikme \u00d6demesi"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/72752\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Frans\u0131z enerji \u015firketi Areva ve Alman Siemens taraf\u0131ndan uzun s\u00fcredir s\u00fcren bir anla\u015fmazl\u0131kta \u00e7\u00f6z\u00fcm sa\u011fland\u0131. \u0130ki \u015firket, Finlandiya\u2019da Teollisuuden Voima (TVO) i\u00e7in in\u015fa ettikleri Olkiluoto 3 N\u00fckleer Santrali\u2019nde maliyet a\u015f\u0131mlar\u0131 ve ertelemeler i\u00e7in <img loading=\"lazy\" class=\"alignright wp-image-48593 size-medium\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/01\/cevre-ve-sehircilik-bakani-sari-nukleer-santrallari-yapmak-zorundayiz-300x165.jpg\" alt=\"areva-ve-siemens-finlandiyaya-nukleer-gecikme-odemesi-gerceklestirecek\" width=\"300\" height=\"165\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/01\/cevre-ve-sehircilik-bakani-sari-nukleer-santrallari-yapmak-zorundayiz-300x165.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/01\/cevre-ve-sehircilik-bakani-sari-nukleer-santrallari-yapmak-zorundayiz-500x276.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/01\/cevre-ve-sehircilik-bakani-sari-nukleer-santrallari-yapmak-zorundayiz-80x44.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/01\/cevre-ve-sehircilik-bakani-sari-nukleer-santrallari-yapmak-zorundayiz.jpg 696w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>450\u00a0milyon euro (400 milyon sterlin) \u00f6deme yapacak.<\/strong><\/p>\n<p>\u0130lk plana g\u00f6re 2009&#8217;da elektrik \u00fcretimine ba\u015flayacak olan Finlandiya\u2019n\u0131n be\u015finci ve en b\u00fcy\u00fck n\u00fckleer santralinin kurulum \u00e7al\u0131\u015fmalar\u0131 hen\u00fcz tamamlanmam\u0131\u015ft\u0131r.<\/p>\n<p>Yine 2003&#8217;de imzalanan anla\u015fmada 3.2 milyar euro olarak belirlenen maliyetin de yakla\u015f\u0131k 5.5 milyar euro olaca\u011f\u0131 \u00f6ng\u00f6r\u00fclmektedir. Bundan dolay\u0131 taraflar tahkim mahkemesinde birbirlerinden milyarlarca euro talep etmektedirler.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Frans\u0131z enerji \u015firketi Areva ve Alman Siemens taraf\u0131ndan uzun s\u00fcredir s\u00fcren bir anla\u015fmazl\u0131kta \u00e7\u00f6z\u00fcm sa\u011fland\u0131. \u0130ki \u015firket, Finlandiya\u2019da Teollisuuden Voima (TVO) i\u00e7in in\u015fa [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":39101,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,43],"tags":[9032,67,1009,12654,23134,25480,34930,37192,1053,23827,15176,37193],"views":819,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/72752"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=72752"}],"version-history":[{"count":2,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/72752\/revisions"}],"predecessor-version":[{"id":72754,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/72752\/revisions\/72754"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/39101"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=72752"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=72752"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=72752"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}