{"id":72719,"date":"2018-03-24T14:23:36","date_gmt":"2018-03-24T11:23:36","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=72719"},"modified":"2018-03-24T14:23:36","modified_gmt":"2018-03-24T11:23:36","slug":"kalyon-enerjiden-konyada-tesla-modeli-elektrik-depolama-tesisi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/kalyon-enerjiden-konyada-tesla-modeli-elektrik-depolama-tesisi\/","title":{"rendered":"(Turkish) Kalyon Enerji&#8217;den Konya\u2019da Tesla Modeli Elektrik Depolama Tesisi"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/72719\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Kalyon Elektrik Konya Karap\u0131nar\u2019a Tesla modelini getirme haz\u0131rl\u0131klar\u0131na ba\u015flad\u0131. Kalyon Holding Enerji Grup Ba\u015fkan\u0131 Murtaza Ata, G\u00fcney Koreli Hanwha Q-Cells ile Konya-Karap\u0131nar\u2019da Yenilenebilir Enerji Kaynak Alanlar\u0131 (YEKA) ihalesi kapsam\u0131nda <img loading=\"lazy\" class=\"alignright size-medium wp-image-72720\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/03\/kalyon-enerjiden-konyada-tesla-modeli-elektrik-depolama-tesisi-300x200.jpg\" alt=\"\" width=\"300\" height=\"200\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/03\/kalyon-enerjiden-konyada-tesla-modeli-elektrik-depolama-tesisi-300x200.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/03\/kalyon-enerjiden-konyada-tesla-modeli-elektrik-depolama-tesisi-500x333.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/03\/kalyon-enerjiden-konyada-tesla-modeli-elektrik-depolama-tesisi-75x50.jpg 75w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/03\/kalyon-enerjiden-konyada-tesla-modeli-elektrik-depolama-tesisi.jpg 696w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>kuracaklar\u0131 santrale, ilerleyen d\u00f6nemlerde depolama tesisi eklemeyi planlad\u0131klar\u0131n\u0131 dile getirdi.<\/strong><\/p>\n<p>Ata, elektrik \u015febekesini dengeleyerek enerji kalitesini art\u0131ran depolama teknolojilerinin fiyatlar\u0131n\u0131n son y\u0131llarda g\u00fcne\u015f enerjisi panellerinde oldu\u011fu gibi h\u0131zla d\u00fc\u015ft\u00fc\u011f\u00fcne vurgu yaparak, gelecek 5 y\u0131lda s\u00f6z konusu rakamlar\u0131n yakla\u015f\u0131k 5\u2019te birine inmesinin beklenebilece\u011fini de a\u00e7\u0131klad\u0131.<\/p>\n<p>Karap\u0131nar\u2019daki santral faaliyete ge\u00e7tikten sonra birka\u00e7 y\u00fcz megavatsaat kapasiteli bir elektrik depolama tesisi kurmay\u0131 d\u00fc\u015f\u00fcnd\u00fcklerini belirten Ata, \u201cH\u0131zl\u0131 bir \u015fekilde devreye girip \u00e7\u0131kan bu tesislerin ciddi ekonomik faydalar\u0131 olacak. G\u00fcnd\u00fcz fazla \u00fcretilen elektrik rahatl\u0131kla depolan\u0131p gece sisteme verilebiliyor\u201d ifadelerini de kulland\u0131.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Kalyon Elektrik Konya Karap\u0131nar\u2019a Tesla modelini getirme haz\u0131rl\u0131klar\u0131na ba\u015flad\u0131. Kalyon Holding Enerji Grup Ba\u015fkan\u0131 Murtaza Ata, G\u00fcney Koreli Hanwha Q-Cells ile Konya-Karap\u0131nar\u2019da Yenilenebilir [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":72720,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53],"tags":[32163,63,67,1009,5392,34920,6113,1582,25578],"views":1509,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/72719"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=72719"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/72719\/revisions"}],"predecessor-version":[{"id":72721,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/72719\/revisions\/72721"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/72720"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=72719"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=72719"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=72719"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}