{"id":72526,"date":"2018-03-17T13:51:12","date_gmt":"2018-03-17T10:51:12","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=72526"},"modified":"2018-03-17T13:51:12","modified_gmt":"2018-03-17T10:51:12","slug":"yenikapida-250-milyon-tl-yatirim-maliyetli-yuzer-santral-yapilacak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/yenikapida-250-milyon-tl-yatirim-maliyetli-yuzer-santral-yapilacak\/","title":{"rendered":"(Turkish) Yenikap\u0131\u2019da 250 Milyon TL Yat\u0131r\u0131m Maliyetli Y\u00fczer Santral Yap\u0131lacak"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/72526\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>\u0130stanbul Yenikap\u0131\u2019ya 250 milyon TL maliyetle y\u00fczer santral yap\u0131lacak. Marmara B\u00f6lgesi\u2019ndeki elektrik arz\u0131n\u0131n kesintiye u\u011framamas\u0131 i\u00e7in yap\u0131lacak santral, y\u0131lda 1.500 saat \u00e7al\u0131\u015ft\u0131r\u0131larak do\u011falgaz\u0131 ve motorini elektri\u011fe d\u00f6n\u00fc\u015ft\u00fcrecek. 360 milyon kWh elektrik \u00fcretimi ger\u00e7ekle\u015ftirecek.<\/strong><\/p>\n<p><span id=\"more-98759\"><\/span>\u0130stanbul\u2019un elektrik ihtiyac\u0131n\u0131 kar\u015f\u0131lamas\u0131 i\u00e7in \u2018y\u00fczer santral\u2019 yap\u0131lmas\u0131na karar verildi. \u2018\u00c7evresel etki <img loading=\"lazy\" class=\"alignright size-medium wp-image-72527\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/03\/yenikapiya-250-milyon-tl-maliyetle-yuzer-santral-yapilacak-300x169.jpg\" alt=\"\" width=\"300\" height=\"169\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/03\/yenikapiya-250-milyon-tl-maliyetle-yuzer-santral-yapilacak-300x169.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/03\/yenikapiya-250-milyon-tl-maliyetle-yuzer-santral-yapilacak-500x281.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/03\/yenikapiya-250-milyon-tl-maliyetle-yuzer-santral-yapilacak-80x45.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/03\/yenikapiya-250-milyon-tl-maliyetle-yuzer-santral-yapilacak.jpg 696w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>de\u011ferlendirmesi s\u00fcreci\u2019 (\u00c7ED) ba\u015flat\u0131lan projeyi Elektrik \u00dcretim A.\u015e. \u00fcstlenecek ve y\u00fczer santral Yenikap\u0131 a\u00e7\u0131klar\u0131na demirleyecek. 250 milyon TL\u2019ye mal olmas\u0131 beklenen y\u00fczer santral, do\u011falgaz\u0131 ve motorini elektri\u011fe d\u00f6n\u00fc\u015ft\u00fcrebilecek. Proje kapsam\u0131nda ambarl\u0131 kuru y\u00fck gemisi ya da kargo gemisine 4 adet gaz t\u00fcrbini -generat\u00f6r monte edilerek y\u00fczer elektrik santrali yap\u0131lacak.<\/p>\n<p>Elektrik arz g\u00fcvenli\u011finin ve sistem g\u00fcvenli\u011finin sa\u011flanmas\u0131 amac\u0131yla yap\u0131lacak y\u00fczer elektrik santrali, y\u0131lda yakla\u015f\u0131k 1.500 saat \u00e7al\u0131\u015ft\u0131r\u0131lacak ve 360 milyon kWh eletrik \u00fcretimi ger\u00e7ekle\u015ftirecek. Y\u00fczer santrala do\u011falgaz temini karadan ba\u011flanacak boru hatt\u0131 ile sa\u011flanacak. Do\u011falgazda s\u0131k\u0131nt\u0131 ya\u015fanmas\u0131 durumunda motorin ile elektrik \u00fcretilecek. Santrala motorin ikmali ya tanker ya da karadan ba\u011flant\u0131 yoluyla yap\u0131lacak. \u00dcretilen elektrik Yenikap\u0131\u2019daki trafo merkezi yoluyla \u015fehir \u015febekesine verilecek.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.\u0130stanbul Yenikap\u0131\u2019ya 250 milyon TL maliyetle y\u00fczer santral yap\u0131lacak. Marmara B\u00f6lgesi\u2019ndeki elektrik arz\u0131n\u0131n kesintiye u\u011framamas\u0131 i\u00e7in yap\u0131lacak santral, y\u0131lda 1.500 saat \u00e7al\u0131\u015ft\u0131r\u0131larak do\u011falgaz\u0131 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":72527,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53],"tags":[2878,68,14650,1478,19,67,1009,23311,1033,3923,2279,3625],"views":651,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/72526"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=72526"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/72526\/revisions"}],"predecessor-version":[{"id":72528,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/72526\/revisions\/72528"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/72527"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=72526"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=72526"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=72526"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}