{"id":72445,"date":"2018-03-15T09:57:32","date_gmt":"2018-03-15T06:57:32","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=72445"},"modified":"2018-03-15T09:57:32","modified_gmt":"2018-03-15T06:57:32","slug":"fina-enerji-ve-ge-enerjiden-ruzgar-turbinlerine-yonelik-anlasma","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/fina-enerji-ve-ge-enerjiden-ruzgar-turbinlerine-yonelik-anlasma\/","title":{"rendered":"(Turkish) Fina Enerji ve GE Enerji&#8217;den R\u00fczgar T\u00fcrbinlerine Y\u00f6nelik Anla\u015fma"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/72445\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Fiba Grubu&#8217;nun enerji i\u015ftiraki Fina Enerji taraf\u0131ndan 2020&#8217;ye kadar devreye al\u0131nacak <img loading=\"lazy\" class=\"alignleft size-medium wp-image-72446\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/03\/fina-enerji-ve-ge-enerjiden-ruzgar-turbinlerine-yonelik-anlasma-300x200.jpg\" alt=\"\" width=\"300\" height=\"200\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/03\/fina-enerji-ve-ge-enerjiden-ruzgar-turbinlerine-yonelik-anlasma-300x200.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/03\/fina-enerji-ve-ge-enerjiden-ruzgar-turbinlerine-yonelik-anlasma-500x333.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/03\/fina-enerji-ve-ge-enerjiden-ruzgar-turbinlerine-yonelik-anlasma-75x50.jpg 75w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/03\/fina-enerji-ve-ge-enerjiden-ruzgar-turbinlerine-yonelik-anlasma.jpg 708w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>toplam da 410 megawatt g\u00fcc\u00fcnde sekiz r\u00fczgar enerjisi santraline y\u00f6nelik r\u00fczgar t\u00fcrbin tedari\u011fine y\u00f6nelik GE, Yenilenebilir Enerji GE.N ile anla\u015ft\u0131.<\/strong><\/p>\n<p>General Electric&#8217;in a\u00e7\u0131klamas\u0131nda, Fina Enerji&#8217;nin 336 MW kurulu g\u00fcce sahip dokuz r\u00fczgar enerjisi santrali ve 25 MW g\u00fcce sahip d\u00f6rt g\u00fcne\u015f santrali vard\u0131r.<\/p>\n<p>GE ile yap\u0131lan anla\u015fman\u0131n kapsad\u0131\u011f\u0131 sekiz santrale ek olarak K\u0131z\u0131lcaterzi r\u00fczgar santralini de 2020 y\u0131l\u0131na kadar devreye almay\u0131 planlayan Fina Enerji, b\u00f6ylece kurulu r\u00fczgardan enerji \u00fcretim kapasitesini 761 MW&#8217;a \u00e7\u0131karm\u0131\u015f olacak.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Fiba Grubu&#8217;nun enerji i\u015ftiraki Fina Enerji taraf\u0131ndan 2020&#8217;ye kadar devreye al\u0131nacak toplam da 410 megawatt g\u00fcc\u00fcnde sekiz r\u00fczgar enerjisi santraline y\u00f6nelik r\u00fczgar t\u00fcrbin [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":72446,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,50],"tags":[67,1009,12054,785,474,24949,231,23318],"views":1004,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/72445"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=72445"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/72445\/revisions"}],"predecessor-version":[{"id":72447,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/72445\/revisions\/72447"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/72446"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=72445"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=72445"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=72445"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}