{"id":72442,"date":"2018-03-15T09:52:49","date_gmt":"2018-03-15T06:52:49","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=72442"},"modified":"2018-03-15T09:52:49","modified_gmt":"2018-03-15T06:52:49","slug":"urdun-300-mw-kapasiteli-yenilenebilir-enerji-yatirimi-yapacak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/urdun-300-mw-kapasiteli-yenilenebilir-enerji-yatirimi-yapacak\/","title":{"rendered":"(Turkish) \u00dcrd\u00fcn 300 MW Kapasiteli Yenilenebilir Enerji Yat\u0131r\u0131m\u0131 Yapacak"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/72442\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>\u00dcrd\u00fcn, aralar\u0131nda Fransa\u2019dan TOTAL SA ve Suudi Arabistan\u2019dan ACWA Power\u2019\u0131n da yer ald\u0131\u011f\u0131 45 \u015firketi,6 farkl\u0131 toplam da 300 MW kapasiteli g\u00fcne\u015f ve r\u00fczgar enerjisi santrallerine teklif vermeleri i\u00e7in se\u00e7ti.<img loading=\"lazy\" class=\"alignright size-medium wp-image-72443\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/03\/urdun-300-mw-kapasiteli-yenilenebilir-enerji-yatirimi-yapacak-300x200.jpg\" alt=\"\" width=\"300\" height=\"200\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/03\/urdun-300-mw-kapasiteli-yenilenebilir-enerji-yatirimi-yapacak-300x200.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/03\/urdun-300-mw-kapasiteli-yenilenebilir-enerji-yatirimi-yapacak-500x333.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/03\/urdun-300-mw-kapasiteli-yenilenebilir-enerji-yatirimi-yapacak-75x50.jpg 75w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/03\/urdun-300-mw-kapasiteli-yenilenebilir-enerji-yatirimi-yapacak.jpg 708w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/strong><\/p>\n<p>Aralar\u0131nda Linuo Group, FRV Solar Holdings, ACWA Power, Chint Solar, Total Solar ve TBEA Xinjiang Sunoasis gibi \u015firketlerin yer ald\u0131\u011f\u0131 31 \u015firketin, her biri 50 MW kapasiteli 4 tane g\u00fcne\u015f enerjisi santraline teklif vermesi i\u00e7in se\u00e7ildi\u011fini belirten Enerji Bakan\u0131 Saleh Kharabsheh, aralar\u0131nda Alcazar Energy, SamGreenPower, ACWA Power, Eesti Energia, Korea Southern Power and EMA Power Investment gibi \u015firketlerin yer ald\u0131\u011f\u0131 di\u011fer 14 \u015firketin yap\u0131lacak 2 r\u00fczgar enerjisi santraline teklif verece\u011fini a\u00e7\u0131klad\u0131.<\/p>\n<p>Enerji Bakan\u0131 Kharabsheh ayr\u0131ca t\u00fcm \u015firketlerin, tekliflerinin teknik ve finansal detaylar\u0131n\u0131 bu ay sonuna kadar vermelerinin gerekti\u011fini de s\u00f6yledi.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.\u00dcrd\u00fcn, aralar\u0131nda Fransa\u2019dan TOTAL SA ve Suudi Arabistan\u2019dan ACWA Power\u2019\u0131n da yer ald\u0131\u011f\u0131 45 \u015firketi,6 farkl\u0131 toplam da 300 MW kapasiteli g\u00fcne\u015f ve [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":72443,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49],"tags":[67,1009,23311,2326,23416,2569,1593],"views":825,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/72442"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=72442"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/72442\/revisions"}],"predecessor-version":[{"id":72444,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/72442\/revisions\/72444"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/72443"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=72442"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=72442"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=72442"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}