{"id":72382,"date":"2018-03-13T12:19:07","date_gmt":"2018-03-13T09:19:07","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=72382"},"modified":"2018-03-13T12:19:07","modified_gmt":"2018-03-13T09:19:07","slug":"tanyeri-elektrikten-orduya-46-mwlik-hidro-elektrik-santrali","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/tanyeri-elektrikten-orduya-46-mwlik-hidro-elektrik-santrali\/","title":{"rendered":"(Turkish) Tanyeri Elektrik&#8217;ten, Ordu\u2019ya 46 MW\u2019l\u0131k Hidro Elektrik Santrali"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/72382\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Tanyeri Elektrik \u00dcretim \u0130n\u015f. Mad. San. ve Tic. A.\u015e. taraf\u0131ndan Ordu \u0130li, \u00c7atalp\u0131nar ve Kabata\u015f \u0130l\u00e7esi, Direkli \u00c7ay\u0131, Re\u015fadiye \u00c7ay\u0131\/Bolaman \u00c7ay\u0131 \u00fczerinde 48.21 MWm \/ 46.30 MWe kurulu g\u00fcc\u00fcnde Tanyeri Baraj\u0131 ve Kav\u015fak HES (Malzeme Ocaklar\u0131, K\u0131rma Eleme Tesisleri ve Beton Santralleri Dahil) projesinin hayata ge\u00e7irilmesi planlan\u0131yor.<\/strong><\/p>\n<p><img loading=\"lazy\" class=\"alignleft size-medium wp-image-72383\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/03\/tanyeri-elektrikten-orduya-46-mwlik-hidro-elektrik-santrali-300x167.jpg\" alt=\"\" width=\"300\" height=\"167\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/03\/tanyeri-elektrikten-orduya-46-mwlik-hidro-elektrik-santrali-300x167.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/03\/tanyeri-elektrikten-orduya-46-mwlik-hidro-elektrik-santrali-500x278.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/03\/tanyeri-elektrikten-orduya-46-mwlik-hidro-elektrik-santrali-80x44.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/03\/tanyeri-elektrikten-orduya-46-mwlik-hidro-elektrik-santrali.jpg 696w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>267 299 465 TL bedelli proje kapsam\u0131nda 14.5 MW\u2019l\u0131k Karasay HES, 30.50 MW\u2019l\u0131k Kav\u015fak HES ve 1.30 MW\u2019l\u0131k Cansuyu HES kurulacak. B\u00f6ylece 3 adet HES yap\u0131s\u0131na ait toplam kurulu g\u00fc\u00e7 46.30 MW olacak ve y\u0131lda toplam 185.15 GWh elektrik \u00fcretilecek. Tanyeri HES santral\u0131nda \u00fcretilecek enerji, 154 KV\u2019luk, 1272 MCM kesitli enerji iletim hatt\u0131 ile, 17 kilometre mesafedeki Fatsa Trafo Merkezine ba\u011flanacak.<\/p>\n<p>Tanyeri Baraj\u0131 ve Kav\u015fak HES Projesi i\u00e7in yap\u0131m s\u00fcresi toplam 2.5 y\u0131l olarak planlanm\u0131\u015f olup, projenin in\u015faat a\u015famas\u0131nda 100 ki\u015finin, i\u015fletme a\u015famas\u0131nda ise 20 ki\u015finin \u00e7al\u0131\u015fmas\u0131 \u00f6ng\u00f6r\u00fcl\u00fcyor. Santralin daha \u00f6nce Turkuaz Elektrik \u00dcretim A.\u015e. taraf\u0131ndan Fatsa HES projesi kapsam\u0131nda yap\u0131lmas\u0131 planlanm\u0131\u015ft\u0131. Ancak proje y\u00fck\u00fcml\u00fcl\u00fckleri yerine getirilmedi\u011finden yeniden planland\u0131.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Tanyeri Elektrik \u00dcretim \u0130n\u015f. Mad. San. ve Tic. A.\u015e. taraf\u0131ndan Ordu \u0130li, \u00c7atalp\u0131nar ve Kabata\u015f \u0130l\u00e7esi, Direkli \u00c7ay\u0131, Re\u015fadiye \u00c7ay\u0131\/Bolaman \u00c7ay\u0131 \u00fczerinde 48.21 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":72383,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,47],"tags":[37072,19,67,1009,7215,37073,34926,1090,37074,37071,37075],"views":1313,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/72382"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=72382"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/72382\/revisions"}],"predecessor-version":[{"id":72384,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/72382\/revisions\/72384"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/72383"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=72382"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=72382"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=72382"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}